Two accepted methods of estimating magnitude and distribution of earth quake induced lateral
force on structure are;
I. Equivalent static (building code) analysis method
II. Dynamic Analysis method (time History, response spectrum)
This type of analysis is applied to buildings whose response is not significantly affected by
contribution from higher modes vibration. These requirements are claimed to be satisfied by
buildings which;
Where, C1=depends on nature of building; (C1=0.075, for RC-moment resisting frames) as per
EBCS-8, page 21and H = height of building above the base in meter; (H = 11.48m)
Therefore our building is analyzed by static method of analysis since T 1=0.528sec < 2sec and our
building is regular in elevation even if it has some irregularity in plan.
Sd(T1) =
-The ratio of the design bed rock acceleration to the acceleration of gravity, g; a=a 0i
0 = the bed rock acceleration ratio for the site and depends on the seismic zone as given in
table 1.1 of EBCS-8, 1995.For zone 4 (from given table 1.3), building located at Adama, 0 =
0.10.
I = the important factor. For ordinary building not belonging to the other categories, I is 1.0 as
per EBCS-1995, Table 2.4.
𝛽 =1.2*S/T12/3 ≤ 2.5
T1=C1H3/4; for buildings with height up to 80m; from the above calculation T1 = 0.528 sec.
𝛾 =𝛾oKDKRKW≤0.7
Where,o= basic value of behavior factor depends on the structure type.
KD=factor reflecting the ductility class
KR=factor reflecting the structural regularity in elevation.
KW=factor reflecting the prevailing failure mode in structural system with walls.
𝛾 = 0.2*2*1*1=0.4≤0.7 …OK!
∴Sd(T1) = 0.088, which indicates base shear is 8.8% of the weight of the structure.
W=Total permanent load + 25% of floor live load, for storage & ware house occupancies.
W = total permanent load, in other occupancies as per EBCS-8, 1995 section 1.4.3(3).
The horizontal forces at each floor level, Fi, are distributed to lateral load resistive structural
elements in proportion to their rigidities assuming rigid floor diagrams.
Center of mass (Xm, Ym): is a point on a floor level where he whole floor mass and its inertial
effects can be replaced using a lumped equivalent mass.
Σ WiXi Σ WiYi
Xm=
ΣWi
, Ym =
ΣWi
Where: Xm and Ym are the coordinates of the point of application of Fi when the seismic
action is parallel to the Y-direction and X-direction respectively.
unit weight
Level Location L(m) W(m) t(m) Wi(KN) Xi Yi W*Xi W*Yi
(KN/m3)
C-1 3.90 0.75 0.21 24.00 14.74 -0.37 8.50 -5.38 125.31
S-1 3.90 2.75 0.21 24.00 54.05 1.38 8.50 74.32 459.46
Slab S-2 3.90 4.45 0.21 24.00 87.47 4.98 8.50 435.16 743.49
C-2 2.90 1.10 0.21 24.00 16.08 2.20 5.10 35.37 82.00
S-3 3.65 2.75 0.21 24.00 50.59 1.38 1.83 69.56 92.32
FB-A1 3.90 0.20 0.15 24.00 2.81 0.00 8.50 0.00 23.87
FB-A2 3.65 0.20 0.15 24.00 2.63 0.00 1.83 0.00 4.80
FB-B 10.45 0.20 0.15 24.00 7.52 2.75 5.23 20.69 39.31
FB-C 10.45 0.20 0.15 24.00 7.52 7.20 5.23 54.17 39.31
Floor beam
FB-1 7.93 0.20 0.15 24.00 5.71 3.24 10.45 18.47 59.67
FB-2 8.23 0.20 0.15 24.00 5.93 3.09 6.55 18.28 38.81
FB-3 8.23 0.20 0.15 24.00 5.93 3.09 3.65 18.28 21.63
FB-4 7.20 0.20 0.15 24.00 5.18 3.60 0.00 18.66 0.00
HCB-1 7.93 2.76 0.20 14.00 61.28 3.24 10.45 198.25 640.41
HCB-2 10.45 2.76 0.20 14.00 80.76 0.00 5.23 0.00 421.96
HCB-3 10.45 2.76 0.20 14.00 80.76 2.75 5.23 222.08 421.96
HCB-4 8.23 2.76 0.20 14.00 63.60 3.09 6.55 196.21 416.59
HCB
HCB-5 8.23 2.76 0.20 14.00 63.60 3.09 3.65 196.21 232.15
HCB-6 3.90 2.76 0.20 14.00 30.14 7.20 8.50 217.00 256.18
HCB-7 6.55 1.00 0.20 14.00 18.34 7.20 3.28 132.05 60.06
HCB-8 2.75 2.76 0.20 14.00 21.25 1.38 0.00 29.22 0.00
Columns A1 3.06 0.30 0.30 24.00 6.61 0.00 10.45 0.00 69.07
B1 3.06 0.30 0.30 24.00 6.61 2.75 10.45 18.18 69.07
C1 3.06 0.30 0.30 24.00 6.61 7.20 10.45 47.59 69.07
A2 3.06 0.30 0.30 24.00 6.61 0.00 6.55 0.00 43.29
B2 3.06 0.30 0.30 24.00 6.61 2.75 6.55 18.18 43.29
C2 3.06 0.30 0.30 24.00 6.61 7.20 6.55 47.59 43.29
unit weight
Level Location L(m) W(m) t(m) Wi(KN) Xi Yi W*Xi W*Yi
(KN/m3)
C-1 3.90 0.75 0.21 24.00 14.74 -0.37 8.50 -5.38 125.31
S-1 3.90 2.75 0.21 24.00 54.05 1.38 8.50 74.32 459.46
S-2 3.90 4.45 0.21 24.00 87.47 4.98 8.50 435.16 743.49
C-2 2.90 1.10 0.21 24.00 16.08 2.20 5.10 35.37 82.00
Slab
S-3 2.90 4.45 0.21 24.00 65.04 4.98 5.10 323.58 331.71
S-4 3.65 2.75 0.21 24.00 50.59 1.38 1.83 69.56 92.32
S-5 3.65 4.45 0.21 24.00 81.86 4.98 1.83 407.26 149.40
C-3 3.20 1.15 0.21 24.00 18.55 5.15 -0.58 95.52 -10.66
FB-A1 3.90 0.20 0.15 24.00 2.81 0.00 8.50 0.00 23.87
FB-A2 3.65 0.20 0.15 24.00 2.63 0.00 1.83 0.00 4.80
FB-B 10.45 0.20 0.15 24.00 7.52 2.75 5.23 20.69 39.31
Floor beam FB-C' 2.00 0.20 0.15 24.00 1.44 5.00 11.45 7.20 16.49
FB-C 12.45 0.20 0.15 24.00 8.96 7.20 6.23 64.54 55.80
FB-1 7.93 0.20 0.15 24.00 5.71 3.24 10.45 18.47 59.67
FB-2 8.23 0.20 0.15 24.00 5.93 3.09 6.55 18.28 38.81
FB-3 8.23 0.20 0.15 24.00 5.93 3.09 3.65 18.28 21.63
FB-4 7.20 0.20 0.15 24.00 5.18 3.60 0.00 18.66 0.00
HCB-1 7.93 2.76 0.20 14.00 61.28 3.24 10.45 198.25 640.41
HCB-2 10.45 2.76 0.20 14.00 80.76 0.00 5.23 0.00 421.96
HCB-3 10.45 2.76 0.20 14.00 80.76 2.75 5.23 222.08 421.96
HCB HCB-4 12.45 2.76 0.20 14.00 96.21 7.20 6.23 692.74 598.93
HCB-5 8.23 2.76 0.20 14.00 63.60 3.09 6.55 196.21 416.59
HCB-6 8.23 2.76 0.20 14.00 63.60 3.09 3.65 196.21 232.15
HCB-7 7.20 2.76 0.20 14.00 55.64 3.60 0.00 200.31 0.00
C'1' 1.53 0.30 0.30 24.00 3.30 5.00 12.45 16.52 41.14
C1' 1.53 0.30 0.30 24.00 3.30 7.20 12.45 23.79 41.14
A1 3.06 0.30 0.30 24.00 6.61 0.00 10.45 0.00 69.07
B1 3.06 0.30 0.30 24.00 6.61 2.75 10.45 18.18 69.07
C1 3.06 0.30 0.30 24.00 6.61 7.20 10.45 47.59 69.07
A2 3.06 0.30 0.30 24.00 6.61 0.00 6.55 0.00 43.29
Columns
B2 3.06 0.30 0.30 24.00 6.61 2.75 6.55 18.18 43.29
C2 3.06 0.30 0.30 24.00 6.61 7.20 6.55 47.59 43.29
A3 3.06 0.30 0.30 24.00 6.61 0.00 3.65 0.00 24.13
B3 3.06 0.30 0.30 24.00 6.61 2.75 3.65 18.18 24.13
A4 3.06 0.30 0.30 24.00 6.61 0.00 0.00 0.00 0.00
B4 3.06 0.30 0.30 24.00 6.61 2.75 0.00 18.18 0.00
Flight-1 2.14 1.20 0.21 24.00 12.94 0.75 5.95 9.71 77.01
Stair case &
Landing 1.03 2.90 0.21 24.00 15.05 -0.52 5.10 -7.75 76.78
Landing
Flight-2 2.17 1.20 0.21 24.00 13.12 0.75 4.25 9.84 55.78
Σ 1050.17 3527.32 5642.57
Xm = ΣWi Xi / ΣWi 3.36
Ym = ΣWi Yi / ΣWi 5.37
unit weight
Level Location L(m) W(m) t(m) Wi(KN) Xi Yi W*Xi W*Yi
(KN/m3)
C'1' 1.00 0.30 0.30 24.00 2.16 5.00 12.45 10.80 26.89
C1' 1.00 0.30 0.30 24.00 2.16 7.20 12.45 15.55 26.89
A1 1.00 0.30 0.30 24.00 2.16 0.00 10.45 0.00 22.57
B1 1.00 0.30 0.30 24.00 2.16 2.75 10.45 5.94 22.57
C1 1.00 0.30 0.30 24.00 2.16 7.20 10.45 15.55 22.57
A2 1.00 0.30 0.30 24.00 2.16 0.00 6.55 0.00 14.15
Columns
B2 1.00 0.30 0.30 24.00 2.16 2.75 6.55 5.94 14.15
C2 1.00 0.30 0.30 24.00 2.16 7.20 6.55 15.55 14.15
A3 1.00 0.30 0.30 24.00 2.16 0.00 3.65 0.00 7.88
B3 1.00 0.30 0.30 24.00 2.16 2.75 3.65 5.94 7.88
A4 1.00 0.30 0.30 24.00 2.16 0.00 0.00 0.00 0.00
B4 1.00 0.30 0.30 24.00 2.16 2.75 0.00 5.94 0.00
Σ 25.92 81.22 179.71
Xm = ΣWi Xi / ΣWi 3.13
Ym = ΣWi Yi / ΣWi 6.93
Since we don’t have storage & ware house we haven’t use 25% of floor live load
2.3. Distribution of the base shear over the height of the building
( Fb−Ft ) Wihi
Fi =
∑ Wihi
Where,
Fi =the concentrated lateral force acting at floor z
Ft=the concentrated force at the top, which is in addition to Fn
Wi=portion of total weight located at level z.
Hi=height above the base to level i.
( Fb−Ft )Wihi
Fi = ∑ Wihi
T1 = 0.528 sec for our building which is less than 0.7sec. Therefore Ft = 0
Level Fb-Ft =
Descrption Wi (KN) Wi*Hi Fi
Hi(m) Fb
Water tank 57.54 13.48 775.57 238.99 11.85
Roof 168.38 11.18 1,882.47 238.99 28.77
2nd floor 793.11 8.12 6,440.06 238.99 98.41
1st floor 1,050.17 5.06 5,313.88 238.99 81.20
G. floor 614.14 2.00 1,228.29 238.99 18.77
Footing 25.92 - - 238.99 -
15,640.27 238.99
Kcx= Kcy=
Level Floor b h L
b^3h/12L bh^3/12L
footing Col. Footing 0.3 0.3 2.00 0.00034 0.00034
Elevation col. Ground -to- Roof 0.3 0.3 3.06 0.00022 0.00022
Elevation col. Roof- water tank 0.3 0.3 2.30 0.00029 0.00029
Segmen
Kcy= bh*3/12L
Level axis t b h L
1'-1 0.2 0.3 2 0.00023
1-2 0.2 0.3 3.9 0.00012
A, B, C, C'
2-3 0.2 0.3 2.9 0.00016
Grade beam 3-4 0.2 0.3 3.65 0.00012
A 0.2 0.3 0.73 0.00062
1, 4 A-B 0.2 0.3 2.75 0.00016
B-C 0.2 0.3 4.45 0.00010
A 0.2 0.3 1.03 0.00044
2, 3 A-B 0.2 0.3 2.75 0.00016
B-C 0.2 0.3 4.45 0.00010
1'-1 0.2 0.3 2 0.00023
1-2 0.2 0.3 3.9 0.00012
A, B, C, C'
2-3 0.2 0.3 2.9 0.00016
3-4 0.2 0.3 3.65 0.00012
A 0.2 0.3 0.73 0.00062
Floor beam
1, 4 A-B 0.2 0.3 2.75 0.00016
B-C 0.2 0.3 4.45 0.00010
A 0.2 0.3 1.03 0.00044
2, 3 A-B 0.2 0.3 2.75 0.00016
B-C 0.2 0.3 4.45 0.00010
1'-1 0.2 0.3 2 0.00023
1-2 0.2 0.3 3.9 0.00012
Top-tie A, B, C, C'
2-3 0.2 0.3 2.9 0.00016
beam
3-4 0.2 0.3 3.65 0.00012
ROOF
A 0.2 0.3 0.73 0.00062
1, 4
A-B 0.2 0.3 2.75 0.00016
ASTU SoCEA Civil Engineering Page 255
Structural analysis and design Integrated project on G+2 building at Adama 2017
ai=K’/(2+K’)
Di=ai*Kci
X-direction (Dx)
Dx-value on axis 1
S Dx
Water tank
A B C
A B C
Dx-value on axis 4
S Dx
Water tank
A B C
Y-direction (Dy)
Dy-value on axis A
S Dy
Water tank 0.00016
Kc 0.00029 0.00029
K 0.46095 0.47441
a 0.18731 0.19173
D 0.00005 0.00006 0.00011
1 2 3 4
Dy-value on axis B
S Dy
Water tank 0.00016
Kc 0.00029 0.00029
K 0.72532 0.73878
a 0.26614 0.26975
D 0.00008 0.00008 0.00016
1 2 3 4
Dy-value on axis C
S Dy
Water tank
1 1 2 3 4
Description Xs Ys
Water tank 1.61 5.10
Roof floor 3.67 5.44
2nd floor 3.81 5.16
1st floor 3.99 5.20
G. floor 3.70 5.21
a. Actual eccentricity ei
ex = Xs-Xm&ey = Ys-Ym
Determination of eccentricity
b. Accidental eccentricity
Accounts for uncertainties in locating masses
el = ±0.05Li
Where Li= floor dimensions perpendicular to the direction of seismic action
elx = ±0.05Ly
ely = ±0.05Lx
In our case the building is 8.23m wide and 12.45m long. Thus Lx = 8.23m & Ly = 12.45m
elx=±0.05*12.45 = ± 0.623m&
ely=±0.05*8.23 = ± 0.412m
Design eccentricity
ed=ei-eli i. edx=ex-elx &
edy=ey-ely
Additional
Actual Eccentricity Eccentricity
Design Eccentricity-X Design Eccentricity-Y
Level
ex ey elx ely edx1 edx2 edy1 edy2
roof 0.62 - 0.623 0.412 1.247 0.001 0.41 (0.41)
Roof floor 1.57 (0.26) 0.623 0.412 2.197 0.951 0.15 (0.67)
2nd floor 1.12 (0.86) 0.623 0.412 1.746 0.500 (0.44) (1.27)
1st floor 0.63 (0.18) 0.623 0.412 1.256 0.010 0.24 (0.59)
G. floor 0.35 (0.80) 0.623 0.412 0.975 (0.271) (0.39) (1.21)
ὰy1 = 1+ ὰy2 = 1+
Story axis edx1 edx2 Diy Jr x'
(Diy*edx1)X'/Jr (Diy*edx2)X'/Jr
A 0.975 -0.271 0.00046 0.04 3.70 1.04 0.99
Ground
B 0.975 -0.27 0.00046 0.04 0.95 1.01 1.00
floor
C 0.975 -0.27 0.00062 0.04 (3.50) 0.94 1.02
A 1.256 0.010 0.00023 0.02 3.99 1.05 1.00
1st
B 1.256 0.01 0.00026 0.02 1.24 1.02 1.00
floor
C 1.256 0.01 0.00039 0.02 (3.21) 0.93 1.00
A 1.746 0.500 0.00019 0.02 3.81 1.06 1.02
2nd
B 1.746 0.50 0.00026 0.02 1.06 1.02 1.01
floor
C 1.746 0.50 0.00029 0.02 (3.39) 0.92 0.98
A 2.197 0.951 0.00019 0.02 3.67 1.08 1.03
Roof
B 2.197 0.95 0.00026 0.02 0.92 1.03 1.01
floor
C 2.197 0.95 0.00026 0.02 (3.53) 0.90 0.96
Water A 1.247 0.001 0.00011 0.00 1.61 1.15 1.00
tank B 1.247 0.00 0.00016 0.00 (1.14) 0.85 1.00
ὰx1 = 1+ ὰx2 = 1+
Story axis edy1 edy2 Dix Jr Y' (Dix*edy1)Y' (Dix*edy2)Y'
/Jr /Jr
1 -0.39 -1.21 0.00040 0.04 (5.24) 1.022 1.068
Ground 2 -0.39 -1.21 0.00039 0.04 (1.34) 1.005 1.017
floor 3 -0.39 -1.21 0.00039 0.04 1.56 0.994 0.980
4 -0.39 -1.21 0.00039 0.04 5.21 0.979 0.935
1 0.24 -0.59 0.00026 0.02 (5.25) 0.986 1.035
1st 2 0.24 -0.59 0.00025 0.02 (1.35) 0.997 1.009
floor 3 0.24 -0.59 0.00025 0.02 1.55 1.004 0.990
4 0.24 -0.59 0.00026 0.02 5.20 1.013 0.966
1 -0.44 -1.27 0.00026 0.02 (5.29) 1.028 1.081
2nd 2 -0.44 -1.27 0.00025 0.02 (1.39) 1.007 1.020
floor 3 -0.44 -1.27 0.00025 0.02 1.51 0.992 0.978
4 -0.44 -1.27 0.00026 0.02 5.16 0.972 0.921
ASTU SoCEA Civil Engineering Page 270
Structural analysis and design Integrated project on G+2 building at Adama 2017
Q Q
Q Q
Story axis ὰxi(max) (previou Story axis ὰyi(max) (previou
(new) (new)
s s
1 1.07 6.49 6.94 A 1.04 5.64 5.89
2 1.02 6.26 6.36 ground B 1.01 5.64 5.71
ground
3 0.99 6.26 6.22 C 1.02 7.48 7.60
4 0.98 6.26 6.13 A 1.05 21.20 22.24
1st
1 1.03 28.27 29.26 B 1.02 24.25 24.67
floor
2 1.01 26.80 27.03 C 1.00 35.75 35.73
1st floor
3 1.00 26.80 26.91 A 1.06 24.86 26.28
2nd
4 1.01 27.59 27.97 B 1.02 34.83 35.60
floor
1 1.08 33.98 36.73 C 0.98 38.72 37.84
2 1.02 32.22 32.86 A 1.08 7.57 8.14
2nd floor Roof
3 0.99 32.22 31.97 B 1.03 10.60 10.88
floor
4 0.97 33.98 33.04 C 0.96 10.60 10.13
1 1.04 10.65 11.12 Water A 1.15 4.91 5.67
2 1.01 10.10 10.19 tank B 1.00 6.94 6.94
Roof floor
3 1.00 10.10 10.13
4 1.01 8.57 8.64
Water 2 1.09 5.93 6.48
tank 3 1.09 5.93 6.48
Major
FLOOR Axis A B C
Axis
0.0001
D 0.00018 0.00013 0.00040
1 0
Qii 3.03 2.16 1.75 6.94
0.0001
D 0.00016 0.00013 0.00039
2 0
Ground Qii 2.65 2.05 1.66 6.36
floor 0.0001
D 0.00016 0.00013 0.00039
3 0
Qii 2.59 2.01 1.63 6.22
0.0001
D 0.00016 0.00013 0.00039
4 0
Qii 2.55 1.98 1.60 6.13
0.0000
D 0.00014 0.00008 0.00026
1 4
Qii 15.57 9.14 4.55 29.26
0.0000
D 0.00013 0.00008 0.00025
2 4
Qii 13.69 8.91 4.43 27.03
1st floor
0.0000
D 0.00013 0.00008 0.00025
3 4
Qii 13.63 8.87 4.41 26.91
0.0000
D 0.00013 0.00008 0.00026
4 4
Qii 14.56 8.95 4.45 27.97
2nd floor 0.0000
D 0.00014 0.00008 0.00026
1 4
Qii 19.55 11.48 5.71 36.73
0.0000
D 0.00013 0.00008 0.00025
2 4
Qii 16.65 10.83 5.39 32.86
0.0000
D 0.00013 0.00008 0.00025
3 4
Qii 16.19 10.54 5.24 31.97
4 D 0.00014 0.00008 0.0000 0.00026
4
FLOO Major
Axis 1 2 3 4
R Axis
0.0001 0.0001 0.0001 0.0001
D 0.00046
A 0 3 3 1
Qii 1.32 1.61 1.62 1.34 5.89
0.0001 0.0001 0.0001 0.0001
Ground D 0.00046
B 0 3 3 1
floor
Qii 1.28 1.56 1.57 1.30 5.71
0.0001 0.0001 0.0001 0.0001
D 0.00050
C 4 3 3 1
Qii 2.08 1.94 1.96 1.62 7.60
0.0000 0.0000 0.0000 0.0000
D 0.00023
A 5 7 7 5
Qii 4.42 6.49 6.67 4.66 22.24
0.0000 0.0000 0.0000 0.0000
D 0.00026
1st floor B 5 8 9 5
Qii 4.29 7.86 8.00 4.52 24.67
0.0001 0.0000 0.0000 0.0000
D 0.00031
C 0 8 9 5
Qii 10.95 9.56 9.73 5.49 35.73