Structural analysis and design Integrated project on G+2 building at Adama 2017

2. Earth quake load

2.1. Selection of appropriate earth quack design method

Two accepted methods of estimating magnitude and distribution of earth quake induced lateral
force on structure are;
I. Equivalent static (building code) analysis method
II. Dynamic Analysis method (time History, response spectrum)

Equivalent static (building code) analysis method

This type of analysis is applied to buildings whose response is not significantly affected by
contribution from higher modes vibration. These requirements are claimed to be satisfied by
buildings which;

F Meet the criteria for regularity in plan and elevation.


F Have fundamental periods of vibration T1, in the two main directions is less than 2secs.
Dynamic Analysis method (time History, response spectrum)

This type of analysis shall be applied;

F To buildings which do not satisfied the condition given in static analysis.


F For buildings not complying with criteria for regularity significantly to the global
response shall be taken into account.
F To all types of building.
To identify which method is suitable for our building, we have needed to check T 1and regularity
of the structure.

F Height of building, H = 11.48m


F The building is made up of reinforced concrete
T1=C1H3/4; for buildings with height up to 80m

Where, C1=depends on nature of building; (C1=0.075, for RC-moment resisting frames) as per
EBCS-8, page 21and H = height of building above the base in meter; (H = 11.48m)

T1 = 0.075*11.483/4 = 0.528 sec

Therefore our building is analyzed by static method of analysis since T 1=0.528sec < 2sec and our
building is regular in elevation even if it has some irregularity in plan.

ASTU SoCEA Civil Engineering Page 244


Structural analysis and design Integrated project on G+2 building at Adama 2017

2.2. Determination of base shear

Fb=Sd(T1)W, as per EBCS-8,1995 section 2.3.3.2.2

Ordinate of the design spectrum at period T1, Sd(T1)

Sd(T1) = 

-The ratio of the design bed rock acceleration to the acceleration of gravity, g; a=a 0i

0 = the bed rock acceleration ratio for the site and depends on the seismic zone as given in
table 1.1 of EBCS-8, 1995.For zone 4 (from given table 1.3), building located at Adama, 0 =
0.10.

I = the important factor. For ordinary building not belonging to the other categories, I is 1.0 as
per EBCS-1995, Table 2.4.

Therefore, = 0i = 0.1*1 = 0.1

𝛽 - a parameter in the design response factor for the site is

𝛽 =1.2*S/T12/3 ≤ 2.5

S = 1.2, for soil class B - as per EBCS-8, table 1.2

T1=C1H3/4; for buildings with height up to 80m; from the above calculation T1 = 0.528 sec.

Therefore 𝛽= 1.2*1.5/0.5282/3 = 2.205 ≤ 2.5 …OK!

𝛾- the behavior factor to account for energy dissipation

𝛾 =𝛾oKDKRKW≤0.7
Where,o= basic value of behavior factor depends on the structure type.
KD=factor reflecting the ductility class
KR=factor reflecting the structural regularity in elevation.
KW=factor reflecting the prevailing failure mode in structural system with walls.

𝛾o = 0.2, for frame system, as per EBCS-8, table 3.2


KD = 2, for lower ductility, as per EBCS-8 page 38
KR = 1, for regular structure, as per EBCS-8 Page 38
KW = 1, for frame and frame equivalent dual system, as per EBCS-8 Page 38

𝛾 = 0.2*2*1*1=0.4≤0.7 …OK!

Thus, ordinate of the design spectrum at period T1,

ASTU SoCEA Civil Engineering Page 245


Structural analysis and design Integrated project on G+2 building at Adama 2017

Sd(T1) = abg = 0.1*2.205*0.4 = 0.088

∴Sd(T1) = 0.088, which indicates base shear is 8.8% of the weight of the structure.

Computation of weight of structure along with center of mass, W

W=Total permanent load + 25% of floor live load, for storage & ware house occupancies.

W = total permanent load, in other occupancies as per EBCS-8, 1995 section 1.4.3(3).

Calculation of Self weight of the building and center of mass

The horizontal forces at each floor level, Fi, are distributed to lateral load resistive structural
elements in proportion to their rigidities assuming rigid floor diagrams.

Center of mass (Xm, Ym): is a point on a floor level where he whole floor mass and its inertial
effects can be replaced using a lumped equivalent mass.

Σ WiXi Σ WiYi
Xm=
ΣWi
, Ym =
ΣWi

Where: Xm and Ym are the coordinates of the point of application of Fi when the seismic
action is parallel to the Y-direction and X-direction respectively.

ASTU SoCEA Civil Engineering Page 246


Structural analysis and design Integrated project on G+2 building at Adama 2017

Water tank floor Center of Mass

Level Location L(m) W(m) t(m)  (KN/m3) Wi(KN) Xi Yi W*Xi W*Yi


TTB-A 2.90 0.20 0.15 24.00 2.09 0.00 5.10 0.00 10.65
Top-tie TTB-B 2.90 0.20 0.15 24.00 2.09 2.75 5.10 5.74 10.65
beam TTB-2 2.75 0.20 0.15 24.00 1.98 0.86 6.55 1.70 12.97
TTB-3 2.75 0.20 0.15 24.00 1.98 0.86 3.65 1.70 7.23
WT 2.90 2.75 0.15 24.00 28.71 1.38 5.10 39.48 146.42
Slab
WC 2.90 1.03 0.15 24.00 10.75 -0.52 5.10 -5.54 54.84
A2 1.15 0.30 0.30 24.00 2.48 0.00 6.55 0.00 16.27
B2 1.15 0.30 0.30 24.00 2.48 2.75 6.55 6.83 16.27
Columns
A3 1.15 0.30 0.30 24.00 2.48 0.00 3.65 0.00 9.07
B3 1.15 0.30 0.30 24.00 2.48 2.75 3.65 6.83 9.07
Σ 57.54 56.75 293.43
Xm = ΣWi Xi / ΣWi 0.99
Ym = ΣWi Yi / ΣWi 5.10

ASTU SoCEA Civil Engineering Page 247


Structural analysis and design Integrated project on G+2 building at Adama 2017

Roof floor Center of Mass

Level Location L(m) W(m) t(m)  (KN/m3) Wi(KN) Xi Yi W*Xi W*Yi


Slab C-2 2.90 1.08 0.21 24.00 15.79 2.20 5.10 34.73 80.50
TB-A1 3.90 0.20 0.15 24.00 2.81 0.00 8.50 0.00 23.87
TB-A2 3.65 0.20 0.15 24.00 2.63 0.00 1.83 0.00 4.80
TB-B 10.45 0.20 0.15 24.00 7.52 2.75 5.23 20.69 39.31
TB-C 3.90 0.20 0.15 24.00 2.81 7.20 8.50 20.22 23.87
Toptie beam
TB-1 7.93 0.20 0.15 24.00 5.71 3.24 10.45 18.47 59.67
TB-2 8.23 0.20 0.15 24.00 5.93 3.09 6.55 18.28 38.81
TB-3 3.78 0.20 0.15 24.00 2.72 0.86 3.65 2.34 9.93
TB-4 2.75 0.20 0.15 24.00 1.98 1.38 0.00 2.72 0.00
Pa-1 7.93 1.00 0.20 14.00 22.20 2.27 10.45 50.29 232.03
Pa-2 3.90 1.00 0.20 14.00 10.92 -0.85 7.60 -9.28 82.99
Paraphet
Pa-3 6.55 1.00 0.20 14.00 18.34 1.70 3.28 31.18 60.06
Wall
Pa-4 6.55 1.00 0.20 14.00 18.34 0.00 3.28 0.00 60.06
Pa-5 2.75 1.00 0.20 14.00 7.70 8.45 0.00 65.07 0.00
A1 1.53 0.30 0.30 24.00 3.30 0.00 10.45 0.00 34.54
B1 1.53 0.30 0.30 24.00 3.30 2.75 10.45 9.09 34.54
C1 1.53 0.30 0.30 24.00 3.30 7.20 10.45 23.79 34.54
A2 2.68 0.30 0.30 24.00 5.79 0.00 6.55 0.00 37.92
B2 2.68 0.30 0.30 24.00 5.79 2.75 6.55 15.92 37.92
Columns
C2 1.53 0.30 0.30 24.00 3.30 7.20 6.55 23.79 21.65
A3 2.68 0.30 0.30 24.00 5.79 0.00 3.65 0.00 21.13
B3 2.68 0.30 0.30 24.00 5.79 2.75 3.65 15.92 21.13
A4 1.53 0.30 0.30 24.00 3.30 0.00 0.00 0.00 0.00
B4 1.53 0.30 0.30 24.00 3.30 2.75 0.00 9.09 0.00
Σ 168.38 352.31 959.26
Xm = ΣWi Xi / ΣWi 2.09
Ym = ΣWi Yi / ΣWi 5.70

ASTU SoCEA Civil Engineering Page 248


Structural analysis and design Integrated project on G+2 building at Adama 2017

Second floor Center of Mass

unit weight
Level Location L(m) W(m) t(m) Wi(KN) Xi Yi W*Xi W*Yi
(KN/m3)
C-1 3.90 0.75 0.21 24.00 14.74 -0.37 8.50 -5.38 125.31
S-1 3.90 2.75 0.21 24.00 54.05 1.38 8.50 74.32 459.46
Slab S-2 3.90 4.45 0.21 24.00 87.47 4.98 8.50 435.16 743.49
C-2 2.90 1.10 0.21 24.00 16.08 2.20 5.10 35.37 82.00
S-3 3.65 2.75 0.21 24.00 50.59 1.38 1.83 69.56 92.32
FB-A1 3.90 0.20 0.15 24.00 2.81 0.00 8.50 0.00 23.87
FB-A2 3.65 0.20 0.15 24.00 2.63 0.00 1.83 0.00 4.80
FB-B 10.45 0.20 0.15 24.00 7.52 2.75 5.23 20.69 39.31
FB-C 10.45 0.20 0.15 24.00 7.52 7.20 5.23 54.17 39.31
Floor beam
FB-1 7.93 0.20 0.15 24.00 5.71 3.24 10.45 18.47 59.67
FB-2 8.23 0.20 0.15 24.00 5.93 3.09 6.55 18.28 38.81
FB-3 8.23 0.20 0.15 24.00 5.93 3.09 3.65 18.28 21.63
FB-4 7.20 0.20 0.15 24.00 5.18 3.60 0.00 18.66 0.00
HCB-1 7.93 2.76 0.20 14.00 61.28 3.24 10.45 198.25 640.41
HCB-2 10.45 2.76 0.20 14.00 80.76 0.00 5.23 0.00 421.96
HCB-3 10.45 2.76 0.20 14.00 80.76 2.75 5.23 222.08 421.96
HCB-4 8.23 2.76 0.20 14.00 63.60 3.09 6.55 196.21 416.59
HCB
HCB-5 8.23 2.76 0.20 14.00 63.60 3.09 3.65 196.21 232.15
HCB-6 3.90 2.76 0.20 14.00 30.14 7.20 8.50 217.00 256.18
HCB-7 6.55 1.00 0.20 14.00 18.34 7.20 3.28 132.05 60.06
HCB-8 2.75 2.76 0.20 14.00 21.25 1.38 0.00 29.22 0.00
Columns A1 3.06 0.30 0.30 24.00 6.61 0.00 10.45 0.00 69.07
B1 3.06 0.30 0.30 24.00 6.61 2.75 10.45 18.18 69.07
C1 3.06 0.30 0.30 24.00 6.61 7.20 10.45 47.59 69.07
A2 3.06 0.30 0.30 24.00 6.61 0.00 6.55 0.00 43.29
B2 3.06 0.30 0.30 24.00 6.61 2.75 6.55 18.18 43.29
C2 3.06 0.30 0.30 24.00 6.61 7.20 6.55 47.59 43.29

ASTU SoCEA Civil Engineering Page 249


Structural analysis and design Integrated project on G+2 building at Adama 2017

A3 3.06 0.30 0.30 24.00 6.61 0.00 3.65 0.00 24.13


B3 3.06 0.30 0.30 24.00 6.61 2.75 3.65 18.18 24.13
A4 3.06 0.30 0.30 24.00 6.61 0.00 0.00 0.00 0.00
B4 3.06 0.30 0.30 24.00 6.61 2.75 0.00 18.18 0.00
Flight-1 2.14 1.20 0.21 24.00 12.94 0.75 5.95 9.71 77.01
Stair case &
Landing 1.03 2.90 0.21 24.00 15.05 -0.52 5.10 -7.75 76.78
Landing
Flight-2 2.17 1.20 0.21 24.00 13.12 0.75 4.25 9.84 55.78
Σ 793.11 2,128.30 4,774.18
Xm = ΣWi Xi / ΣWi 2.68
Ym = ΣWi Yi / ΣWi 6.02

First floor Center of Mass

unit weight
Level Location L(m) W(m) t(m) Wi(KN) Xi Yi W*Xi W*Yi
(KN/m3)
C-1 3.90 0.75 0.21 24.00 14.74 -0.37 8.50 -5.38 125.31
S-1 3.90 2.75 0.21 24.00 54.05 1.38 8.50 74.32 459.46
S-2 3.90 4.45 0.21 24.00 87.47 4.98 8.50 435.16 743.49
C-2 2.90 1.10 0.21 24.00 16.08 2.20 5.10 35.37 82.00
Slab
S-3 2.90 4.45 0.21 24.00 65.04 4.98 5.10 323.58 331.71
S-4 3.65 2.75 0.21 24.00 50.59 1.38 1.83 69.56 92.32
S-5 3.65 4.45 0.21 24.00 81.86 4.98 1.83 407.26 149.40
C-3 3.20 1.15 0.21 24.00 18.55 5.15 -0.58 95.52 -10.66
FB-A1 3.90 0.20 0.15 24.00 2.81 0.00 8.50 0.00 23.87
FB-A2 3.65 0.20 0.15 24.00 2.63 0.00 1.83 0.00 4.80
FB-B 10.45 0.20 0.15 24.00 7.52 2.75 5.23 20.69 39.31
Floor beam FB-C' 2.00 0.20 0.15 24.00 1.44 5.00 11.45 7.20 16.49
FB-C 12.45 0.20 0.15 24.00 8.96 7.20 6.23 64.54 55.80
FB-1 7.93 0.20 0.15 24.00 5.71 3.24 10.45 18.47 59.67
FB-2 8.23 0.20 0.15 24.00 5.93 3.09 6.55 18.28 38.81

ASTU SoCEA Civil Engineering Page 250


Structural analysis and design Integrated project on G+2 building at Adama 2017

FB-3 8.23 0.20 0.15 24.00 5.93 3.09 3.65 18.28 21.63
FB-4 7.20 0.20 0.15 24.00 5.18 3.60 0.00 18.66 0.00
HCB-1 7.93 2.76 0.20 14.00 61.28 3.24 10.45 198.25 640.41
HCB-2 10.45 2.76 0.20 14.00 80.76 0.00 5.23 0.00 421.96
HCB-3 10.45 2.76 0.20 14.00 80.76 2.75 5.23 222.08 421.96
HCB HCB-4 12.45 2.76 0.20 14.00 96.21 7.20 6.23 692.74 598.93
HCB-5 8.23 2.76 0.20 14.00 63.60 3.09 6.55 196.21 416.59
HCB-6 8.23 2.76 0.20 14.00 63.60 3.09 3.65 196.21 232.15
HCB-7 7.20 2.76 0.20 14.00 55.64 3.60 0.00 200.31 0.00
C'1' 1.53 0.30 0.30 24.00 3.30 5.00 12.45 16.52 41.14
C1' 1.53 0.30 0.30 24.00 3.30 7.20 12.45 23.79 41.14
A1 3.06 0.30 0.30 24.00 6.61 0.00 10.45 0.00 69.07
B1 3.06 0.30 0.30 24.00 6.61 2.75 10.45 18.18 69.07
C1 3.06 0.30 0.30 24.00 6.61 7.20 10.45 47.59 69.07
A2 3.06 0.30 0.30 24.00 6.61 0.00 6.55 0.00 43.29
Columns
B2 3.06 0.30 0.30 24.00 6.61 2.75 6.55 18.18 43.29
C2 3.06 0.30 0.30 24.00 6.61 7.20 6.55 47.59 43.29
A3 3.06 0.30 0.30 24.00 6.61 0.00 3.65 0.00 24.13
B3 3.06 0.30 0.30 24.00 6.61 2.75 3.65 18.18 24.13
A4 3.06 0.30 0.30 24.00 6.61 0.00 0.00 0.00 0.00
B4 3.06 0.30 0.30 24.00 6.61 2.75 0.00 18.18 0.00
Flight-1 2.14 1.20 0.21 24.00 12.94 0.75 5.95 9.71 77.01
Stair case &
Landing 1.03 2.90 0.21 24.00 15.05 -0.52 5.10 -7.75 76.78
Landing
Flight-2 2.17 1.20 0.21 24.00 13.12 0.75 4.25 9.84 55.78
Σ 1050.17 3527.32 5642.57
Xm = ΣWi Xi / ΣWi 3.36
Ym = ΣWi Yi / ΣWi 5.37

ASTU SoCEA Civil Engineering Page 251


Structural analysis and design Integrated project on G+2 building at Adama 2017

Ground floor Center of Mass


unit weight
Level Location L(m) W(m) t(m) Wi(KN) Xi Yi W*Xi W*Yi
(KN/m3)
GB-A 10.45 0.20 0.30 24.00 15.05 0.00 5.23 0.00 78.63
GB-B 10.45 0.20 0.30 24.00 15.05 2.75 5.23 41.38 78.63
GB-C' 2.00 0.20 0.30 24.00 2.88 5.00 11.45 14.40 32.98
GB-C 12.45 0.20 0.30 24.00 17.93 7.20 6.23 129.08 111.60
Floor beam
GB-1 7.93 0.20 0.30 24.00 11.42 3.24 10.45 36.94 119.33
GB-2 8.23 0.20 0.30 24.00 11.85 3.09 6.55 36.56 77.63
GB-3 8.23 0.20 0.30 24.00 11.85 3.09 3.65 36.56 43.26
GB-4 7.20 0.20 0.30 24.00 10.37 3.60 0.00 37.32 0.00
HCB-1 7.93 2.76 0.20 14.00 61.28 3.24 10.45 198.25 640.41
HCB-2 5.90 2.76 0.20 14.00 45.60 0.00 6.60 0.00 300.93
HCB-3 10.45 2.76 0.20 14.00 80.76 2.75 5.23 222.08 421.96
HCB HCB-4 12.45 2.76 0.20 14.00 96.21 7.20 6.23 692.74 598.93
HCB-5 8.23 2.76 0.20 14.00 63.60 3.09 6.55 196.21 416.59
HCB-6 3.78 2.76 0.20 14.00 29.21 0.86 3.65 25.12 106.62
HCB-7 4.45 2.76 0.20 14.00 34.39 4.98 0.00 171.09 0.00
C'1' 2.53 0.30 0.30 24.00 5.46 5.00 12.45 27.32 68.04
C1' 2.53 0.30 0.30 24.00 5.46 7.20 12.45 39.35 68.04
A1 2.53 0.30 0.30 24.00 5.46 0.00 10.45 0.00 57.11
B1 2.53 0.30 0.30 24.00 5.46 2.75 10.45 15.03 57.11
C1 2.53 0.30 0.30 24.00 5.46 7.20 10.45 39.35 57.11
Columns
A2 2.53 0.30 0.30 24.00 5.46 0.00 6.55 0.00 35.79
B2 2.53 0.30 0.30 24.00 5.46 2.75 6.55 15.03 35.79
C2 2.53 0.30 0.30 24.00 5.46 7.20 6.55 39.35 35.79
A3 2.53 0.30 0.30 24.00 5.46 0.00 3.65 0.00 19.95
B3 2.53 0.30 0.30 24.00 5.46 2.75 3.65 15.03 19.95

ASTU SoCEA Civil Engineering Page 252


Structural analysis and design Integrated project on G+2 building at Adama 2017

A4 2.53 0.30 0.30 24.00 5.46 0.00 0.00 0.00 0.00


B4 2.53 0.30 0.30 24.00 5.46 2.75 0.00 15.03 0.00
Flight-1 2.14 1.20 0.21 24.00 12.94 0.75 5.95 9.71 77.01
Stair case &
Landing 1.03 2.90 0.21 24.00 15.05 -0.52 5.10 -7.75 76.78
Landing
Flight-2 2.17 1.20 0.21 24.00 13.12 0.75 4.25 9.84 55.78
Σ 614.14 2055.02 3691.72
Xm = ΣWi Xi / ΣWi 3.35
Ym = ΣWi Yi / ΣWi 6.01
Footing floor Center of Mass

unit weight
Level Location L(m) W(m) t(m) Wi(KN) Xi Yi W*Xi W*Yi
(KN/m3)
C'1' 1.00 0.30 0.30 24.00 2.16 5.00 12.45 10.80 26.89
C1' 1.00 0.30 0.30 24.00 2.16 7.20 12.45 15.55 26.89
A1 1.00 0.30 0.30 24.00 2.16 0.00 10.45 0.00 22.57
B1 1.00 0.30 0.30 24.00 2.16 2.75 10.45 5.94 22.57
C1 1.00 0.30 0.30 24.00 2.16 7.20 10.45 15.55 22.57
A2 1.00 0.30 0.30 24.00 2.16 0.00 6.55 0.00 14.15
Columns
B2 1.00 0.30 0.30 24.00 2.16 2.75 6.55 5.94 14.15
C2 1.00 0.30 0.30 24.00 2.16 7.20 6.55 15.55 14.15
A3 1.00 0.30 0.30 24.00 2.16 0.00 3.65 0.00 7.88
B3 1.00 0.30 0.30 24.00 2.16 2.75 3.65 5.94 7.88
A4 1.00 0.30 0.30 24.00 2.16 0.00 0.00 0.00 0.00
B4 1.00 0.30 0.30 24.00 2.16 2.75 0.00 5.94 0.00
Σ 25.92 81.22 179.71
Xm = ΣWi Xi / ΣWi 3.13
Ym = ΣWi Yi / ΣWi 6.93

ASTU SoCEA Civil Engineering Page 253


Structural analysis and design Integrated project on G+2 building at Adama 2017

Summary of floor load and corresponding center of mass

Description level hi(m) Wi (KN) Xm (m) Ym (m)


Water tank 13.48 57.54 0.99 5.10
Roof 11.18 168.38 2.09 5.70
2nd floor 8.12 793.11 2.68 6.02
1st floor 5.06 1050.17 3.36 5.37
G. floor 2.00 614.14 3.35 6.01
Footing 0.00 25.92 3.13 6.93
Total 2709.26

Since we don’t have storage & ware house we haven’t use 25% of floor live load

Fb= Sd(T1)W=0.088*2709.26 ≈ 238.99 KN

2.3. Distribution of the base shear over the height of the building

( Fb−Ft ) Wihi
Fi =
∑ Wihi
Where,
Fi =the concentrated lateral force acting at floor z
Ft=the concentrated force at the top, which is in addition to Fn
Wi=portion of total weight located at level z.
Hi=height above the base to level i.

( Fb−Ft )Wihi

Fi = ∑ Wihi
T1 = 0.528 sec for our building which is less than 0.7sec. Therefore Ft = 0

Level Fb-Ft =
Descrption Wi (KN) Wi*Hi Fi
Hi(m) Fb
Water tank 57.54 13.48 775.57 238.99 11.85
Roof 168.38 11.18 1,882.47 238.99 28.77
2nd floor 793.11 8.12 6,440.06 238.99 98.41
1st floor 1,050.17 5.06 5,313.88 238.99 81.20
G. floor 614.14 2.00 1,228.29 238.99 18.77
Footing 25.92 - - 238.99 -
 15,640.27 238.99

ASTU SoCEA Civil Engineering Page 254


Structural analysis and design Integrated project on G+2 building at Adama 2017

2.4. Determination of center of stiffness (Xs, Ys) of the floor

It is a point where the stiffness or strength of the floor is concentrated.

Column Stiffness (Kxc & Kyc

Kcx= Kcy=
Level Floor b h L
b^3h/12L bh^3/12L
footing Col. Footing 0.3 0.3 2.00 0.00034 0.00034
Elevation col. Ground -to- Roof 0.3 0.3 3.06 0.00022 0.00022
Elevation col. Roof- water tank 0.3 0.3 2.30 0.00029 0.00029

Beam Stiffness (Kb)

Segmen
Kcy= bh*3/12L
Level axis t b h L
1'-1 0.2 0.3 2 0.00023
1-2 0.2 0.3 3.9 0.00012
A, B, C, C'
2-3 0.2 0.3 2.9 0.00016
Grade beam 3-4 0.2 0.3 3.65 0.00012
A 0.2 0.3 0.73 0.00062
1, 4 A-B 0.2 0.3 2.75 0.00016
B-C 0.2 0.3 4.45 0.00010
A 0.2 0.3 1.03 0.00044
2, 3 A-B 0.2 0.3 2.75 0.00016
B-C 0.2 0.3 4.45 0.00010
1'-1 0.2 0.3 2 0.00023
1-2 0.2 0.3 3.9 0.00012
A, B, C, C'
2-3 0.2 0.3 2.9 0.00016
3-4 0.2 0.3 3.65 0.00012
A 0.2 0.3 0.73 0.00062
Floor beam
1, 4 A-B 0.2 0.3 2.75 0.00016
B-C 0.2 0.3 4.45 0.00010
A 0.2 0.3 1.03 0.00044
2, 3 A-B 0.2 0.3 2.75 0.00016
B-C 0.2 0.3 4.45 0.00010
1'-1 0.2 0.3 2 0.00023
1-2 0.2 0.3 3.9 0.00012
Top-tie A, B, C, C'
2-3 0.2 0.3 2.9 0.00016
beam
3-4 0.2 0.3 3.65 0.00012
ROOF
A 0.2 0.3 0.73 0.00062
1, 4
A-B 0.2 0.3 2.75 0.00016
ASTU SoCEA Civil Engineering Page 255
Structural analysis and design Integrated project on G+2 building at Adama 2017

B-C 0.2 0.3 4.45 0.00010


A 0.2 0.3 1.03 0.00044
2, 3 A-B 0.2 0.3 2.75 0.00016
B-C 0.2 0.3 4.45 0.00010
Top-tie A, B 2-3 0.2 0.3 2.9 0.00016
beam A 0.2 0.3 1.03 0.00044
Water tank 2,3
A-B 0.2 0.3 2.75 0.00016

4.2.4.1 D-Value Calculation

K’=∑Kbj(upper & lower beam)/2Kci

ai=K’/(2+K’)

Di=ai*Kci

ASTU SoCEA Civil Engineering Page 256


Structural analysis and design Integrated project on G+2 building at Adama 2017

X-direction (Dx)

Dx-value on axis 1
S Dx
Water tank

Roof floor 0.00062 0.00016 0.00010


Kc 0.00022 0.00022 0.00022
K 3.53634 1.20025 0.45843
a 0.63875 0.37505 0.18647
D 0.00014 0.00008 0.00004 0.00026

2nd floor 0.00062 0.00016 0.00010


Kc 0.00022 0.00022 0.00022
K 3.53634 1.20025 0.45843
a 0.63875 0.37505 0.18647
D 0.00014 0.00008 0.00004 0.00026

1st floor 0.00062 0.00016 0.00010


Kc 0.00022 0.00022 0.00022
K 3.53634 1.20025 0.45843
a 0.63875 0.37505 0.18647
D 0.00014 0.00008 0.00004 0.00026

G. floor 0.00062 0.00016 0.00010


Kc 0.00034 0.00034 0.00034
K 1.15567 0.39224 0.14981
a 0.52466 0.37297 0.30226
D 0.00018 0.00013 0.00010 0.00040

A B C

ASTU SoCEA Civil Engineering Page 257


Structural analysis and design Integrated project on G+2 building at Adama 2017

Dx-value on axis 2 & 3


S Dx
Water tank 0.00044 0.00016
Kc 0.00029 0.00029
K 2.04625 0.72986
a 0.50572 0.26736
D 0.00015 0.00008 0.00023

Roof floor 0.00044 0.00016 0.00010


Kc 0.00022 0.00022 0.00022
K 2.72240 1.20025 0.45843
a 0.57649 0.37505 0.18647
D 0.00013 0.00008 0.00004 0.00025

2nd floor 0.00044 0.00016 0.00010


Kc 0.00022 0.00022 0.00022
K 2.72240 1.20025 0.45843
a 0.57649 0.37505 0.18647
D 0.00013 0.00008 0.00004 0.00025

1st floor 0.00044 0.00016 0.00010


Kc 0.00022 0.00022 0.00022
K 2.72240 1.20025 0.45843
a 0.57649 0.37505 0.18647
D 0.00013 0.00008 0.00004 0.00025

G. floor 0.00044 0.00016 0.00010


Kc 0.00034 0.00034 0.00034
K 0.88967 0.39224 0.14981
a 0.48091 0.37297 0.30226
D 0.00016 0.00013 0.00010 0.00039

A B C

ASTU SoCEA Civil Engineering Page 258


Structural analysis and design Integrated project on G+2 building at Adama 2017

Dx-value on axis 4
S Dx
Water tank

Roof floor 0.00062 0.00016


Kc 0.00022 0.00022
K 3.53634 0.97103
a 0.63875 0.32683
D 0.00014 0.00007 0.00021

2nd floor 0.00062 0.00016 0.00010


Kc 0.00022 0.00022 0.00022
K 3.53634 1.20025 0.45843
a 0.63875 0.37505 0.18647
D 0.00014 0.00008 0.00004 0.00026

1st floor 0.00062 0.00016 0.00010


Kc 0.00022 0.00022 0.00022
K 3.12937 1.20025 0.45843
a 0.61009 0.37505 0.18647
D 0.00013 0.00008 0.00004 0.00026

G. floor 0.00044 0.00016 0.00010


Kc 0.00034 0.00034 0.00034
K 0.88967 0.39224 0.14981
a 0.48091 0.37297 0.30226
D 0.00016 0.00013 0.00010 0.00039

A B C

ASTU SoCEA Civil Engineering Page 259


Structural analysis and design Integrated project on G+2 building at Adama 2017

Y-direction (Dy)

Dy-value on axis A
S Dy
Water tank 0.00016
Kc 0.00029 0.00029
K 0.46095 0.47441
a 0.18731 0.19173
D 0.00005 0.00006 0.00011

Roof 0.00012 0.00012


Kc 0.00022 0.00022 0.00022 0.00022
K 0.52308 0.52308 0.55890 0.55890
a 0.20732 0.20732 0.21842 0.21842
D 0.00005 0.00005 0.00005 0.00005 0.00019

2nd floor 0.00012 0.00012


Kc 0.00022 0.00022 0.00022 0.00022
K 0.52308 0.52308 0.55890 0.55890
a 0.20732 0.20732 0.21842 0.21842
D 0.00005 0.00005 0.00005 0.00005 0.00019

1st floor 0.00012 0.00012


Kc 0.00022 0.00022 0.00022 0.00022
K 0.52308 0.87480 0.91063 0.55890
a 0.20732 0.30430 0.31286 0.21842
D 0.00005 0.00007 0.00007 0.00005 0.00023

G. floor 0.00012 0.00016 0.00012


Kc 0.00034 0.00034 0.00034 0.00034
K 0.17094 0.40083 0.41253 0.18265
a 0.30906 0.37521 0.37825 0.31276
D 0.00010 0.00013 0.00013 0.00011 0.00046

1 2 3 4

ASTU SoCEA Civil Engineering Page 260


Structural analysis and design Integrated project on G+2 building at Adama 2017

Dy-value on axis B
S Dy
Water tank 0.00016
Kc 0.00029 0.00029
K 0.72532 0.73878
a 0.26614 0.26975
D 0.00008 0.00008 0.00016

Roof 0.00012 0.00016 0.00012


Kc 0.00022 0.00022 0.00022 0.00022
K 0.52308 1.22653 1.26235 0.55890
a 0.20732 0.38014 0.38695 0.21842
D 0.00005 0.00008 0.00009 0.00005 0.00026

2nd floor 0.00012 0.00016 0.00012


Kc 0.00022 0.00022 0.00022 0.00022
K 0.52308 1.22653 1.26235 0.55890
a 0.20732 0.38014 0.38695 0.21842
D 0.00005 0.00008 0.00009 0.00005 0.00026

1st floor 0.00012 0.00016 0.00012


Kc 0.00022 0.00022 0.00022 0.00022
K 0.52308 1.22653 1.26235 0.55890
a 0.20732 0.38014 0.38695 0.21842
D 0.00005 0.00008 0.00009 0.00005 0.00026

G. floor 0.00012 0.00016 0.00012


Kc 0.00034 0.00034 0.00034 0.00034
K 0.17094 0.40083 0.41253 0.18265
a 0.30906 0.37521 0.37825 0.31276
D 0.00010 0.00013 0.00013 0.00011 0.00046

1 2 3 4

ASTU SoCEA Civil Engineering Page 261


Structural analysis and design Integrated project on G+2 building at Adama 2017

Dy-value on axis C
S Dy
Water tank

Roof 0.00012 0.00016 0.00012


Kc 0.00022 0.00022 0.00022 0.00022
K 0.52308 1.22653 1.26235 0.55890
a 0.20732 0.38014 0.38695 0.21842
D 0.00005 0.00008 0.00009 0.00005 0.00026

2nd floor 0.00012 0.00016 0.00012


Kc 0.00022 0.00022 0.00022 0.00022
K 1.03308 1.22653 1.26235 0.55890
a 0.34060 0.38014 0.38695 0.21842
D 0.00008 0.00008 0.00009 0.00005 0.00029

1st floor 0.00023 0.00012 0.00016 0.00012


Kc 0.00022 0.00022 0.00022 0.00022 0.00022
K 1.02000 1.54308 1.22653 1.26235 0.55890
a 0.33775 0.43552 0.38014 0.38695 0.21842
D 0.00007 0.00010 0.00008 0.00009 0.00005 0.00039

G. floor 0.00023 0.00012 0.00016 0.00012


Kc 0.00034 0.00034 0.00034 0.00034 0.00034
K 0.33333 0.50427 0.40083 0.41253 0.18265
a 0.35714 0.40102 0.37521 0.37825 0.31276
D 0.00012 0.00014 0.00013 0.00013 0.00011 0.00062

1 1 2 3 4

ASTU SoCEA Civil Engineering Page 262


Structural analysis and design Integrated project on G+2 building at Adama 2017

4.2.4.2 Center of stiffness calculation

Level Axis Dy Xi Dy.Xi Axis Dx Yi Dx.Yi


A 0.00046 - 0.0000 1 0.00040 10.45 0.0042
B 0.00046 2.75 0.0013 2 0.00039 6.55 0.0026
Gr. floor
C 0.00062 7.20 0.0044 3 0.00039 3.65 0.0014
4 0.00039 0.00 0.0000
 0.0015 0.0057 0.0016 0.0082
Xs 3.70 Ys 5.21

Level Axis Dy Xi Dy.Xi Axis Dx Yi Dx.Yi


A 0.00023 - 0.0000 1 0.00026 10.45 0.0028
B 0.00026 2.75 0.0007 2 0.00025 6.55 0.0016
1st floor
C 0.00039 7.20 0.0028 3 0.00025 3.65 0.0009
0.00026 0.00 0.0000
 0.0009 0.0035 0.0010 0.0053
Xs 3.99 Ys 5.20

Level Axis Dy Xi Dy.Xi Axis Dx Yi Dx.Yi


A 0.00019 - 0.0000 1 0.00026 10.45 0.0028
B 0.00026 2.75 0.0007 2 0.00025 6.55 0.0016
2nd floor
C 0.00029 7.20 0.0021 3 0.00025 3.65 0.0009
4 0.00026 0.00 0.0000
 0.0007 0.0028 0.0010 0.0053
Xs 3.81 Ys 5.16

Level Axis Dy Xi Dy.Xi Axis Dx Yi Dx.Yi


A 0.00019 - 0.0000 1 0.00026 10.45 0.0028
Roof B 0.00026 2.75 0.0007 2 0.00025 6.55 0.0016
floor C 0.00026 7.20 0.0019 3 0.00025 3.65 0.0009
4 0.00021 0.00 0.0000
 0.0007 0.0026 0.0010 0.0053
Xs 3.67 Ys 5.44

Level Axis Dy Xi Dy.Xi Axis Dx Yi Dx.Yi


Water
A 0.00011 - 0.0000 2 0.00023 6.55 0.0015
tank
B 0.00016 2.75 0.0004 3 0.00023 3.65 0.0008
 0.0003 0.0004 0.0005 0.0023
Xs 1.61 Ys 5.10

ASTU SoCEA Civil Engineering Page 263


Structural analysis and design Integrated project on G+2 building at Adama 2017

Summary of center of stiffness

Description Xs Ys
Water tank 1.61 5.10
Roof floor 3.67 5.44
2nd floor 3.81 5.16
1st floor 3.99 5.20
G. floor 3.70 5.21

2.5. Computation of frame shear, Qi

Where, Fi=story shear.

Computation of frame shear, Qi-X Direction

Level Axis D-Value Story shear Qi


1 0.00040 18.77 6.49
2 0.00039 18.77 6.26
Ground floor
3 0.00039 18.77 6.26
4 0.00039 18.77 6.26
0.00117

Level Axis D-Value Story shear Qi


1 0.00026 81.20 28.27
2 0.00025 81.20 26.80
1st floor
3 0.00025 81.20 26.80
4 0.00026 81.20 27.59
0.00076

Level Axis D-Value Story shear Qi


1' 0.00026 98.41 33.98
1 0.00025 98.41 32.22
2nd floor
2 0.00025 98.41 32.22
4 0.00026 98.41 33.98
0.00077

Level Axis D-Value Story shear Qi


ASTU SoCEA Civil Engineering Page 264
Structural analysis and design Integrated project on G+2 building at Adama 2017

1' 0.00026 28.77 10.65


1 0.00025 28.77 10.10
Roof
2 0.00025 28.77 10.10
4 0.00021 28.77 8.57
0.00072

Level Axis D-Value Story shear Qi


2 0.00023 11.85 5.93
Water tank
3 0.00023 11.85 5.93
0.00045

Computation of frame shear, Qi-Y Direction

Level Axis D-Value Story shear Qi


A 0.00046 18.77 5.64
Ground floor B 0.00046 18.77 5.64
C 0.00062 18.77 7.48
0.00154

Level Axis D-Value Story shear Qi


A 0.00023 81.20 21.20
1st floor B 0.00026 81.20 24.25
C 0.00039 81.20 35.75
0.00088

Level Axis D-Value Story shear Qi


A 0.00019 98.41 24.86
2nd floor B 0.00026 98.41 34.83
C 0.00029 98.41 38.72
0.00074

Level Axis D-Value Story shear Qi


A 0.00019 28.77 7.57
Roof B 0.00026 28.77 10.60
C 0.00026 28.77 10.60
0.00071

Level Axis D-Value Story shear Qi


ASTU SoCEA Civil Engineering Page 265
Structural analysis and design Integrated project on G+2 building at Adama 2017

A 0.00011 11.85 4.91


Water tank
B 0.00016 11.85 6.94
0.00027

2.6. Determination of eccentricities

a. Actual eccentricity ei

ex = Xs-Xm&ey = Ys-Ym

Where Xs&Ys are center of stiffness about x and y-axis respectively

Xm and Ym are Centers of Masses about the x and y axes respectively

Determination of eccentricity

Ceneter of stiffness Mass Ceneter ecentricity


Level Xs Ys Xm Ym ex ey
Water tank 1.61 5.10 0.99 5.10 0.62 -
Roof floor 3.67 5.44 2.09 5.70 1.57 (0.26)
2nd floor 3.81 5.16 2.68 6.02 1.12 (0.86)
1st floor 3.99 5.20 3.36 5.37 0.63 (0.18)
G. floor 3.70 5.21 3.35 6.01 0.35 (0.80)

b. Accidental eccentricity
Accounts for uncertainties in locating masses
el = ±0.05Li
Where Li= floor dimensions perpendicular to the direction of seismic action

elx = ±0.05Ly
ely = ±0.05Lx
In our case the building is 8.23m wide and 12.45m long. Thus Lx = 8.23m & Ly = 12.45m
elx=±0.05*12.45 = ± 0.623m&

ely=±0.05*8.23 = ± 0.412m

Design eccentricity
ed=ei-eli i. edx=ex-elx &

ASTU SoCEA Civil Engineering Page 266


Structural analysis and design Integrated project on G+2 building at Adama 2017

edy=ey-ely

Hence the design eccentricity is:

Additional
Actual Eccentricity Eccentricity
Design Eccentricity-X Design Eccentricity-Y
Level
ex ey elx ely edx1 edx2 edy1 edy2
roof 0.62 - 0.623 0.412 1.247 0.001 0.41 (0.41)
Roof floor 1.57 (0.26) 0.623 0.412 2.197 0.951 0.15 (0.67)
2nd floor 1.12 (0.86) 0.623 0.412 1.746 0.500 (0.44) (1.27)
1st floor 0.63 (0.18) 0.623 0.412 1.256 0.010 0.24 (0.59)
G. floor 0.35 (0.80) 0.623 0.412 0.975 (0.271) (0.39) (1.21)

2.7. Determination of shear correction factor

ASTU SoCEA Civil Engineering Page 267


Structural analysis and design Integrated project on G+2 building at Adama 2017

X'=Xs- Y'=Ys- Jr=∑Dix*Y’2+


Level Axis Diy Xs Xi Diy*(X')^2 Dix Ys Yi Dix*(Y')^2
Xi Y ∑Diy*X’2
A 0.00046 3.70 0.00 3.70 0.01 0.01
B 0.00046 3.70 2.75 0.95 0.00 0.00
C 0.00062 3.70 7.20 (3.50) 0.01 0.01
Ground
1 0.00040 5.21 10.45 (5.24) 0.01 0.01
floor
2 0.00039 5.21 6.55 (1.34) 0.00 0.00
3 0.00039 5.21 3.65 1.56 0.00 0.00
4 0.00039 5.21 0.00 5.21 0.01 0.01
SUM 0.04

X'=Xs- Y'=Ys- Jr=∑Dix*Y’2+


Level Axis Diy Xs Xi Diy*(X')^2 Dix Ys Yi Dix*(Y')^2
Xi Y ∑Diy*X’2
A 0.00023 3.99 0.00 3.99 0.00 0.00
B 0.00026 3.99 2.75 1.24 0.00 0.00
C 0.00039 3.99 7.20 (3.21) 0.00 0.00
1st floor 1 0.00026 5.20 10.45 (5.25) 0.01 0.01
2 0.00025 5.20 6.55 (1.35) 0.00 0.00
3 0.00025 5.20 3.65 1.55 0.00 0.00
4 0.00026 5.20 0.00 5.20 0.01 0.01
SUM 0.02

X'=Xs- Y'=Ys- Jr=∑Dix*Y’2+


Level Axis Diy Xs Xi Diy*(X')^2 Dix Ys Yi Dix*(Y')^2
Xi Y ∑Diy*X’2
A 0.00019 3.81 0.00 3.81 0.00 0.00
B 0.00026 3.81 2.75 1.06 0.00 0.00
C 0.00029 3.81 7.20 (3.39) 0.00 0.00
2nd
1 0.00026 5.16 10.45 (5.29) 0.01 0.01
floor
2 0.00025 5.16 6.55 (1.39) 0.00 0.00
2 0.00025 5.16 3.65 1.51 0.00 0.00
4 0.00026 5.16 0.00 5.16 0.01 0.01
SUM 0.02

ASTU SoCEA Civil Engineering Page 268


Structural analysis and design Integrated project on G+2 building at Adama 2017

X'=Xs- Y'=Ys- Jr=∑Dix*Y’2+


Level Axis Diy Xs Xi Diy*(X')^2 Dix Ys Yi Dix*(Y')^2
Xi Y ∑Diy*X’2
A 0.00019 3.67 0.00 3.67 0.00 0.00
B 0.00026 3.67 2.75 0.92 0.00 0.00
C 0.00026 3.67 7.20 (3.53) 0.00 0.00
Roof
1 0.00026 5.44 10.45 (5.01) 0.01 0.01
floor
2 0.00025 5.44 6.55 (1.11) 0.00 0.00
3 0.00025 5.44 3.65 1.79 0.00 0.00
4 0.00021 5.44 0.00 5.44 0.01 0.01
SUM 0.02

X'=Xs- Y'=Ys- Jr=∑Dix*Y’2+


Level Axis Diy Xs Xi Diy*(X')^2 Dix Ys Yi Dix*(Y')^2
Xi Y ∑Diy*X’2
A 0.00011 1.61 0.00 1.61 0.00 0.00
Water B 0.00016 1.61 2.75 (1.14) 0.00 0.00
tank 2 0.00023 5.10 6.55 (1.45) 0.00 0.00
3 0.00023 5.10 3.65 1.45 0.00 0.00
SUM 0.00

ASTU SoCEA Civil Engineering Page 269


Structural analysis and design Integrated project on G+2 building at Adama 2017

Correction factor ὰxi

ὰy1 = 1+ ὰy2 = 1+
Story axis edx1 edx2 Diy Jr x'
(Diy*edx1)X'/Jr (Diy*edx2)X'/Jr
A 0.975 -0.271 0.00046 0.04 3.70 1.04 0.99
Ground
B 0.975 -0.27 0.00046 0.04 0.95 1.01 1.00
floor
C 0.975 -0.27 0.00062 0.04 (3.50) 0.94 1.02
A 1.256 0.010 0.00023 0.02 3.99 1.05 1.00
1st
B 1.256 0.01 0.00026 0.02 1.24 1.02 1.00
floor
C 1.256 0.01 0.00039 0.02 (3.21) 0.93 1.00
A 1.746 0.500 0.00019 0.02 3.81 1.06 1.02
2nd
B 1.746 0.50 0.00026 0.02 1.06 1.02 1.01
floor
C 1.746 0.50 0.00029 0.02 (3.39) 0.92 0.98
A 2.197 0.951 0.00019 0.02 3.67 1.08 1.03
Roof
B 2.197 0.95 0.00026 0.02 0.92 1.03 1.01
floor
C 2.197 0.95 0.00026 0.02 (3.53) 0.90 0.96
Water A 1.247 0.001 0.00011 0.00 1.61 1.15 1.00
tank B 1.247 0.00 0.00016 0.00 (1.14) 0.85 1.00

Correction factor ὰyi

ὰx1 = 1+ ὰx2 = 1+
Story axis edy1 edy2 Dix Jr Y' (Dix*edy1)Y' (Dix*edy2)Y'
/Jr /Jr
1 -0.39 -1.21 0.00040 0.04 (5.24) 1.022 1.068
Ground 2 -0.39 -1.21 0.00039 0.04 (1.34) 1.005 1.017
floor 3 -0.39 -1.21 0.00039 0.04 1.56 0.994 0.980
4 -0.39 -1.21 0.00039 0.04 5.21 0.979 0.935
1 0.24 -0.59 0.00026 0.02 (5.25) 0.986 1.035
1st 2 0.24 -0.59 0.00025 0.02 (1.35) 0.997 1.009
floor 3 0.24 -0.59 0.00025 0.02 1.55 1.004 0.990
4 0.24 -0.59 0.00026 0.02 5.20 1.013 0.966
1 -0.44 -1.27 0.00026 0.02 (5.29) 1.028 1.081
2nd 2 -0.44 -1.27 0.00025 0.02 (1.39) 1.007 1.020
floor 3 -0.44 -1.27 0.00025 0.02 1.51 0.992 0.978
4 -0.44 -1.27 0.00026 0.02 5.16 0.972 0.921
ASTU SoCEA Civil Engineering Page 270
Structural analysis and design Integrated project on G+2 building at Adama 2017

1 0.15 -0.67 0.00026 0.02 (5.01) 0.990 1.044


Roof 2 0.15 -0.67 0.00025 0.02 (1.11) 0.998 1.009
floor 3 0.15 -0.67 0.00025 0.02 1.79 1.003 0.985
4 0.15 -0.67 0.00021 0.02 5.44 1.009 0.961
Water 2 0.41 -0.41 0.00023 0.00 (1.45) 0.906 1.094
tank 3 0.41 -0.41 0.00023 0.00 1.45 1.094 0.906

2.8. Corrected Frame Shear

Adjusted Earthquake joint Forces

Corrected frame shear- in X-direction Corrected frame shear- in Y-direction

Q Q
Q Q
Story axis ὰxi(max) (previou Story axis ὰyi(max) (previou
(new) (new)
s s
1 1.07 6.49 6.94 A 1.04 5.64 5.89
2 1.02 6.26 6.36 ground B 1.01 5.64 5.71
ground
3 0.99 6.26 6.22 C 1.02 7.48 7.60
4 0.98 6.26 6.13 A 1.05 21.20 22.24
1st
1 1.03 28.27 29.26 B 1.02 24.25 24.67
floor
2 1.01 26.80 27.03 C 1.00 35.75 35.73
1st floor
3 1.00 26.80 26.91 A 1.06 24.86 26.28
2nd
4 1.01 27.59 27.97 B 1.02 34.83 35.60
floor
1 1.08 33.98 36.73 C 0.98 38.72 37.84
2 1.02 32.22 32.86 A 1.08 7.57 8.14
2nd floor Roof
3 0.99 32.22 31.97 B 1.03 10.60 10.88
floor
4 0.97 33.98 33.04 C 0.96 10.60 10.13
1 1.04 10.65 11.12 Water A 1.15 4.91 5.67
2 1.01 10.10 10.19 tank B 1.00 6.94 6.94
Roof floor
3 1.00 10.10 10.13
4 1.01 8.57 8.64
Water 2 1.09 5.93 6.48
tank 3 1.09 5.93 6.48

ASTU SoCEA Civil Engineering Page 271


Structural analysis and design Integrated project on G+2 building at Adama 2017

2.9. Joint Shear


Di∗Qi
Qii =
Dtotal
Joint shear- in X-direction: EQx

Major
FLOOR Axis A B C 
Axis
0.0001
D 0.00018 0.00013 0.00040
1 0
Qii 3.03 2.16 1.75 6.94
0.0001
D 0.00016 0.00013 0.00039
2 0
Ground Qii 2.65 2.05 1.66 6.36
floor 0.0001
D 0.00016 0.00013 0.00039
3 0
Qii 2.59 2.01 1.63 6.22
0.0001
D 0.00016 0.00013 0.00039
4 0
Qii 2.55 1.98 1.60 6.13
0.0000
D 0.00014 0.00008 0.00026
1 4
Qii 15.57 9.14 4.55 29.26
0.0000
D 0.00013 0.00008 0.00025
2 4
Qii 13.69 8.91 4.43 27.03
1st floor
0.0000
D 0.00013 0.00008 0.00025
3 4
Qii 13.63 8.87 4.41 26.91
0.0000
D 0.00013 0.00008 0.00026
4 4
Qii 14.56 8.95 4.45 27.97
2nd floor 0.0000
D 0.00014 0.00008 0.00026
1 4
Qii 19.55 11.48 5.71 36.73
0.0000
D 0.00013 0.00008 0.00025
2 4
Qii 16.65 10.83 5.39 32.86
0.0000
D 0.00013 0.00008 0.00025
3 4
Qii 16.19 10.54 5.24 31.97
4 D 0.00014 0.00008 0.0000 0.00026
4

ASTU SoCEA Civil Engineering Page 272


Structural analysis and design Integrated project on G+2 building at Adama 2017

Qii 17.58 10.32 5.13 33.04


0.0000
D 0.00014 0.00008 0.00026
1 4
Qii 5.92 3.48 1.73 11.12
0.0000
D 0.00013 0.00008 0.00025
2 4
Roof floor Qii 5.16 3.36 1.67 10.19
0.0000
D 0.00013 0.00008 0.00025
3 4
Qii 5.13 3.34 1.66 10.13
D 0.00014 0.00007 - 0.00021
4
Qii 5.72 2.93 - 8.64
D 0.00015 0.00008 - 0.00023
2
Qii 4.24 2.24 - 6.48
Water tank
D 0.00015 0.00008 - 0.00023
3
Qii 4.24 2.24 - 6.48

Joint shear- in Y-direction: EQy

FLOO Major
Axis 1 2 3 4 
R Axis
0.0001 0.0001 0.0001 0.0001
D 0.00046
A 0 3 3 1
Qii 1.32 1.61 1.62 1.34 5.89
0.0001 0.0001 0.0001 0.0001
Ground D 0.00046
B 0 3 3 1
floor
Qii 1.28 1.56 1.57 1.30 5.71
0.0001 0.0001 0.0001 0.0001
D 0.00050
C 4 3 3 1
Qii 2.08 1.94 1.96 1.62 7.60
0.0000 0.0000 0.0000 0.0000
D 0.00023
A 5 7 7 5
Qii 4.42 6.49 6.67 4.66 22.24
0.0000 0.0000 0.0000 0.0000
D 0.00026
1st floor B 5 8 9 5
Qii 4.29 7.86 8.00 4.52 24.67
0.0001 0.0000 0.0000 0.0000
D 0.00031
C 0 8 9 5
Qii 10.95 9.56 9.73 5.49 35.73

ASTU SoCEA Civil Engineering Page 273


Structural analysis and design Integrated project on G+2 building at Adama 2017

0.0000 0.0000 0.0000 0.0000


D 0.00019
A 5 5 5 5
Qii 6.40 6.40 6.74 6.74 26.28
0.0000 0.0000 0.0000 0.0000
2nd D 0.00026
B 5 8 9 5
floor
Qii 6.19 11.35 11.55 6.52 35.60
0.0000 0.0000 0.0000 0.0000
D 0.00029
C 8 8 9 5
Qii 9.72 10.85 11.04 6.23 37.84
0.0000 0.0000 0.0000 0.0000
D 0.00019
A 5 5 5 5
Qii 1.98 1.98 2.09 2.09 8.14
0.0000 0.0000 0.0000 0.0000
Roof D 0.00026
B 5 8 9 5
floor
Qii 1.89 3.47 3.53 1.99 10.88
0.0000 0.0000 0.0000 0.0000
D 0.00026
C 5 8 9 5
Qii 1.76 3.23 3.29 1.86 10.13
0.0000 0.0000
D - - 0.00011
A 5 6
Water Qii - 2.80 2.87 - 5.67
tank 0.0000 0.0000
D - - 0.00016
B 8 8
Qii - 3.45 3.49 - 6.94