A0982 Installations Site Report MW 59 - CW 07 2023.xlsx 20.02.

2023

Contract UUP Descriptions Time Start End X % Start (Real) End (Real) Comments (Delays / Manpower / Progress etc.)
A0982.00. Personnel planning 233 Tage 10.01.2022 07.10.2022 0% NV NV
A0982.00. Supervision for staff of customer 233 Tage 10.01.2022 07.10.2022 0% NV NV
A0982.00. Unloading, storage, in-house transport and guarding 169 Tage 10.01.2022 25.07.2022 0% NV NV
A0982.00. Site opening 6 Tage 10.01.2022 15.01.2022 0% NV NV
A0982.00. Buildings and foundations completely ready for assembly machines (excluding mounting openings for installation) 0 Tage 10.01.2022 10.01.2022 80% 08.01.22 NV Electrical rooms civil work is ongoing
A0982.00. Arrangement on plant site 6 Tage 10.01.2022 15.01.2022 100% 08.01.22 NV
A0982.00. Main longitudinal and cross axes defined 6 Tage 10.01.2022 15.01.2022 90% 24.01.22 NV
A0982.00. Checking from foundation, main axes, marking auxiliary and additional axes 6 Tage 10.01.2022 15.01.2022 100% 08.01.22 13.01.22
A0982.00. Milestones Mechanical/Automation 45 Tage 18.08.2022 07.10.2022 0% NV NV
A0982.00. Mechanical / Start comissioning from ContiRoll®-Press and Forming line 0 Tage 18.08.2022 18.08.2022 0% NV NV
A0982.00. Automation / Start comissioning with Material (Rice Straw) 0 Tage 23.09.2022 23.09.2022 0% NV NV
A0982.00. Ready for First board 0 Tage 07.10.2022 07.10.2022 0% NV NV
A0982.00. 1000 / 1200 Rice Straw Preparation 79 Tage 10.01.2022 16.03.2022 x 99% 30.11.21 NV
Customer Grouting of the foundation finished / Buyer's scope 0 Tage 01.02.2022 01.02.2022 0% NV NV
A0982.00. 1120.100 Installation receiving conveyor 6 Tage 01.02.2022 08.02.2022 90% NV NV
A0982.00. 1130.100 Installation receiving conveyor 6 Tage 04.02.2022 11.02.2022 90% NV NV
Customer Installation rails for shuttle carriage finished / Buyer's scope 0 Tage 10.02.2022 10.02.2022 0% NV NV
A0982.00. 1140.100 Installation receiving conveyor 6 Tage 10.02.2022 17.02.2022 90% NV NV
A0982.00. 1150.000 Setting up shuttle carriage of the rails 2 Tage 17.02.2022 19.02.2022 100% NV NV
A0982.00. 1151.100 Installation receiving conveyor 6 Tage 17.02.2022 24.02.2022 80% NV NV
A0982.00. 1151.000 Setting up shuttle carriage of the rails 2 Tage 24.02.2022 26.02.2022 100% NV NV
Customer Framework from Building finished / Buyer's scope 0 Tage 26.02.2022 26.02.2022 0% NV NV
Customer 1001.000 Start of installation rails and overhead crane / Buyer's scope 0 Tage 28.02.2022 28.02.2022 0% NV NV
A0982.00. 1291.060 Positioning and final assembly from Scraper conveyor 6 Tage 20.01.2022 27.01.2022 90% 14.02.22 NV
A0982.00. 1211 Chipper Line (1) 68 Tage 10.01.2022 03.03.2022 100% 30.01.22 22.02.22
A0982.00. 1271.000 Positioning and final assembly from transfer chain conveyor 5 Tage 27.01.2022 02.02.2022 100% 30.01.22 22.02.22
A0982.00. 1272.000 Positioning and final assembly from feeding conveyor 5 Tage 02.02.2022 08.02.2022 100% 30.01.22 22.02.22
A0982.00. 1273.000 Installation from destringer unit 4 Tage 08.02.2022 12.02.2022 100% 08.01.22 22.02.22
A0982.00. 1280.000 Drum chopper (1) positioning and final assemlby 12 Tage 23.01.2022 26.02.2022 100% 23.01.22 22.02.22
A0982.00. 1220.601 Positioning and connecting servo drive from drum chopper 4 Tage 26.02.2022 03.03.2022 100% 01.02.22 15.02.22
Customer Structural steel work finished / Buyer's scope 0 Tage 03.03.2022 03.03.2022 0% NV NV
A0982.00. 1221.000 Hammer mill (1) positioning and final assembly 6 Tage 10.01.2022 15.01.2022 80% 30.11.21 NV
A0982.00. 1231 Chipper Line (2) 73 Tage 10.01.2022 09.03.2022 100% 14.02.22 22.02.22
A0982.00. 1251.000 Positioning and final assembly from transfer chain conveyor 5 Tage 03.02.2022 09.02.2022 100% 14.02.22 22.02.22
A0982.00. 1252.000 Positioning and final assembly from feeding conveyor 5 Tage 09.02.2022 15.02.2022 100% 14.02.22 22.02.22
A0982.00. 1253.000 Installation from destringer unit 4 Tage 15.02.2022 19.02.2022 100% 14.02.22 22.02.22
A0982.00. 1260.000 Drum chopper (2) positioning and final assemlby 12 Tage 19.02.2022 05.03.2022 100% 23.01.22 22.02.22
A0982.00. 1240.601 Positioning and connecting servo drive from drum chopper 3 Tage 05.03.2022 09.03.2022 100% 01.02.22 15.02.22
Customer Structural steel work finished / Buyer's scope 0 Tage 09.03.2022 09.03.2022 0% NV NV
A0982.00. 1241.000 Hammer mill (2) positioning and final assembly 6 Tage 10.01.2022 15.01.2022 80% 30.11.21 NV
A0982.00. 1251 Chipper Line (3) 79 Tage 10.01.2022 16.03.2022 100% 16.02.22 22.02.22
A0982.00. 1231.000 Positioning and final assembly from transfer chain conveyor 5 Tage 10.02.2022 16.02.2022 100% 16.02.22 22.02.22
A0982.00. 1232.000 Positioning and final assembly from feeding conveyor 5 Tage 16.02.2022 22.02.2022 100% 16.02.22 22.02.22
A0982.00. 1233.000 Installation from destringer unit 4 Tage 22.02.2022 26.02.2022 100% 16.02.22 22.02.22
A0982.00. 1240.000 Drum chopper (3) positioning and final assemlby 12 Tage 26.02.2022 12.03.2022 100% 24.01.22 22.02.22
A0982.00. 1260.601 Positioning and connecting servo drive from drum chopper 3 Tage 12.03.2022 16.03.2022 100% 10.02.22 22.02.22
Customer Structural steel work finished / Buyer's scope 0 Tage 16.03.2022 16.03.2022 0% NV NV
A0982.00. 1261.000 Hammer mill (3) positioning and final assembly 6 Tage 10.01.2022 15.01.2022 80% 30.11.21 NV
A0982.00. 1200 / 1300 Straw bale cleaning area 66 Tage 10.01.2022 26.03.2022 x 67% NV
Customer Grouting of the foundation finished / Buyer's scope 0 Tage 10.01.2022 10.01.2022 0% NV NV
A0982.00. 1392.060 Positioning and final assembly from Scraper conveyor 12 Tage 10.01.2022 22.01.2022 85% 12.12.21 NV
A0982.00. 1394.060 Positioning and assembly from Scraper conveyor (Part 1 of 2) 12 Tage 10.01.2022 22.01.2022 85% 07.12.21 NV
A0982.00. 1358.000 Silicat separation unit (1) Positioning and final assembly 10 Tage 18.01.2022 11.02.2022 95% 18.01.22 NV Flap - bolt for adjustment not fixed yet
Only placed ,because the steel construction platforms
A0982.00. 1288.000 Positioning and final assembly from screw conveyor 4 Tage 11.02.2022 16.02.2022 80% 12.04.22 NV
stairs grating not available
A0982.00. 1298.000 Install shut-off flap 3 Tage 16.02.2022 19.02.2022 60% NV No lifting
Pre assemling not completed , because the firefighting
A0982.00. 1283.000 Positioning and assembly from round filter 6 Tage 19.02.2022 26.02.2022 70% 25.04.22 NV
pipes was damaged - no pipe will be organized onsite Petrojet
A0982.00. 1282.000 Positioning radials fan with drive (Chipper Line 1) 4 Tage 26.02.2022 03.03.2022 40% NV NV Placed
A0982.00. 1318.000 Silicat separation unit (2) Positioning and final assembly 10 Tage 11.02.2022 23.02.2022 95% 19.01.22 NV Flap - bolt for adjustment not fixed yet
Only placed ,because the steel construction platforms
A0982.00. 1248.020 Positioning and final assembly from screw conveyor 4 Tage 23.02.2022 28.02.2022 80% 12.04.22 NV
stairs grating not available
A0982.00. 1258.100 Install shut-off flap 3 Tage 28.02.2022 03.03.2022 60% NV No lifting
A0982.00. 1243.000 Positioning and assembly from round filter 6 Tage 03.03.2022 10.03.2022 70% 25.04.22 NV Pre assemling

C:\Users\Daniel.Cervantes-Jan\Desktop\A0982 Ägypten Wotech\A0982 CW Weekly reports\2023\MW57-59 18.02.2023 CW07\A0982 Installations Site Report MW 59 - CW 07 2023.xlsx 1 / 11
A0982 Installations Site Report MW 59 - CW 07 2023.xlsx 20.02.2023

A0982.00. 1242.000 Positioning radials fan with drive (Chipper Line 2) 4 Tage 10.03.2022 15.03.2022 40% NV NV Placed
A0982.00. 1338.000 Silicat separation unit (3) Positioning and final assembly 10 Tage 23.02.2022 07.03.2022 95% 30.01.22 NV Flap - bolt for adjustment not fixed yet
Only placed ,because the steel construction platforms
A0982.00. 1268.020 Positioning and final assembly from screw conveyor 4 Tage 07.03.2022 11.03.2022 60% 12.04.22 NV
stairs grating not available
A0982.00. 1278.100 Install shut-off flap 3 Tage 11.03.2022 15.03.2022 60% NV No lifting
A0982.00. 1263.000 Positioning and assembly from round filter 6 Tage 15.03.2022 22.03.2022 60% 25.04.22 NV Pre assemling
A0982.00. 1262.000 Positioning radials fan with drive (Chipper Line 3) 4 Tage 22.03.2022 26.03.2022 40% 26.04.22 NV Placed
A0982.00. 1300 / 1500 Filter unit (Silicate separation unit / Straw bunker) 39 Tage 26.03.2022 11.05.2022 0% NV NV
A0982.00. 1341.000 Positioning radials fan with drive (Silicate separation unit 1) 3 Tage 26.03.2022 30.03.2022 60% 13.03.22 NV Only placed
A0982.00. 1321.000 Positioning radials fan with drive (Silicate separation unit 2) 3 Tage 30.03.2022 02.04.2022 60% 13.03.22 NV Only placed
A0982.00. 1331.000 Positioning radials fan with drive (Silicate separation unit 3) 3 Tage 02.04.2022 06.04.2022 60% 13.03.22 NV Only placed
A0982.00. 1531.000 Positioning radials fan with drive (Straw bunker) 4 Tage 05.04.2022 09.04.2022 60% 13.03.22 NV Only placed
A0982.00. 1398.050 Positioning and final assembly from trough chain conveyor 6 Tage 06.04.2022 13.04.2022 80% 22.05.22 NV
A0982.00. 1342.000 Positioning and assembly from filter unit (Silicate separation unit 1) 8 Tage 13.04.2022 22.04.2022 90% NV NV
A0982.00. 1322.000 Positioning and assembly from filter unit (Silicate separation unit 2) 8 Tage 22.04.2022 02.05.2022 90% NV NV
A0982.00. 1332.000 Positioning and assembly from filter unit (Silicate separation unit 3) 8 Tage 02.05.2022 11.05.2022 90% NV NV
A0982.00. 1532.000 Positioning and assembly from filter unit (Straw bunker) 10 Tage 09.04.2022 21.04.2022 50% NV NV
Customer Start of piping and connecting 0 Tage 21.04.2022 21.04.2022 0% NV NV steel structure is not completed
A0982.00. 1300 / 1500 Straw bunker area 61 Tage 22.03.2022 01.06.2022 72% NV
Customer Grouting of the foundation finished / Buyer's scope 0 Tage 22.03.2022 22.03.2022 100% 15.03.22 20.03.22
A0982.00. 1530.300 Installation from Straw Bunker 12 Tage 22.03.2022 05.04.2022 70% 01.02.22 NV
A0982.00. 1530.310 Straw bunker 12 Tage 22.03.2022 05.04.2022 80% 01.02.22 NV
Burned plastic guide - Wotech will be organize
A0982.00. 1530.320 Rake conveyor 12 Tage 22.03.2022 05.04.2022 80% 21.03.22 NV
Burned plastic guide Petrojet damaged 2 pieces during welding
A0982.00. 1530.340 Discharge rollers 12 Tage 22.03.2022 05.04.2022 100% 22.03.22 05.04.22 Installed
A0982.00. 1530.330 Bottom belt 12 Tage 22.03.2022 05.04.2022 50% 28.02.22 NV Chain and holder is installed - Belt installation open
A0982.00. 1530.350 Bunker level indicators 12 Tage 22.03.2022 05.04.2022 20% 12.04.22 NV no progress
Customer Structural steel work finished / Buyer's scope 0 Tage 05.04.2022 05.04.2022 60% 08.01.22 NV continues steel installation
A0982.00. 1556.060 Positioning and final assembly from Scraper conveyor 6 Tage 05.04.2022 12.04.2022 70% 12.09.22 NV Steel construction not ready
A0982.00. 1555.060 Positioning and final assembly from Scraper conveyor 6 Tage 12.04.2022 19.04.2022 80% 07.09.22 NV Steel construction not ready
Installation not possible missing steel construction until 18 March
A0982.00. 1551.020 Positioning and final assembly from screw conveyor 4 Tage 19.04.2022 23.04.2022 90% 18.03.22 NV
Placed on 18 March - finial fixing open
A0982.00. 1552.010 Positioning and final assembly from belt conveyor 6 Tage 23.04.2022 30.04.2022 50% 29.04.22 NV Start with pre assembling incl installation
A0982.00. 1554.090 Install diverter flap 4 Tage 30.04.2022 05.05.2022 90% 21.05.22 NV Installiert / fixed
A0982.00. 1553.000 Install metal detector 3 Tage 05.05.2022 09.05.2022 90% NV NV no progress
A0982.00. 1394.060 Final assembly from Scraper conveyor (Part 2 of 2) 5 Tage 09.05.2022 14.05.2022 60% NV NV
A0982.00. 1395.100 Install moisture analyser 3 Tage 14.05.2022 18.05.2022 0% NV NV
A0982.00. 1557.010 Positioning and final assembly from belt conveyor 6 Tage 18.05.2022 25.05.2022 50% NV NV pre-installation
A0982.00. 1558.050 Positioning and final assembly from trough chain conveyor 6 Tage 25.05.2022 01.06.2022 0% NV NV not excisting
Customer Start of piping and connecting 0 Tage 01.06.2022 01.06.2022 10% NV NV
A0982.00. 1500 / 2300 Refiner (A0982 WOTECH 2310 2332 - PALLMANN-Schedule) 117 Tage 10.01.2022 25.05.2022 38% NV NV
A0982.00. 1565.000 Positioning from 3 pump racks with accessories (Conditioning and dilution water system) 3 Tage 11.04.2022 13.04.2022 0% NV NV
A0982.00. 2300.000 Assembly-start Refiner system 1 & 2 0 Tage 10.01.2022 10.01.2022 0% NV NV
Main motor frames incorrect manufacture -
reclamation to customer on 27 February 2022
Replcement of the motor frame on 13 March
Steel construction level 9000 is adjust -ready for rails installation 20
May
A0982.00. 2310.000 Refiner system 1 99 Tage 17.01.2022 11.05.2022 38% 10.01.22 NV Rails on the Harbor Alexandria -will be delivered CW 21 / 2022
14 March no Pallmann personal - because the steel construction
/ rails not ready for digester installation
// 22.06.2022 Rails onsite since 6 June until not installed because the
steel construction still not crrect fixed - lose bolt

Main motor frames incorrect manufacture -


reclamation to customer on 27 February 2022
Replacement of the motor frame on 17 March
Steel construction level 9000 is adjust -ready for rails installation 20
May
A0982.00. 2332.000 Refiner system 2 99 Tage 31.01.2022 25.05.2022 38% 12.01.22 NV Rails on the Harbor Alexandria -will be delivered CW 21 / 2022
14 March no Pallmann personal - because the steel construction
/ rails not ready for digester installation

// 22.06.2022 Rails onsite since 6 June until not installed because the
steel construction still not correct fixed - los bolt
A0982.00. 2400 Dryer (1.00399 - Wotech - Dryer - BÜTTNER-Schedule) 81 Tage 02.04.2022 06.07.2022 55% NV NV
A0982.00. 2420.000 Assembly-start Dryer 0 Tage 02.04.2022 02.04.2022 0% NV NV

C:\Users\Daniel.Cervantes-Jan\Desktop\A0982 Ägypten Wotech\A0982 CW Weekly reports\2023\MW57-59 18.02.2023 CW07\A0982 Installations Site Report MW 59 - CW 07 2023.xlsx 2 / 11
A0982 Installations Site Report MW 59 - CW 07 2023.xlsx 20.02.2023

Duct manufacture incorrect / without inspection doors nozzles etc.


Dryer duct bottom installation 12 week interupted - no personal restart
A0982.00. 2420.000 Dryer Area 81 Tage 04.04.2022 06.07.2022 x 55% 21.01.22 NV
installation 16 May and is ongoing / installed is main fan ,
mixingchamber not completd , Flue gas damper-flap

A0982.00. 2550 Straw fibre preparation 106 Tage 10.01.2022 16.06.2022 x 55% 15.12.21 NV
A0982.00. 2592.010 Positioning from troughed belt conveyor under the blenders (Part 1) / After finishing Sifter system complete the installation from troughed belt conveyor (Part 2) 34 Tage 16.04.2022 16.06.2022 76% 16.06.22 NV
A0982.00. 2593.000 Install metal detector 3 Tage 13.06.2022 16.06.2022 90% NV NV
A0982.00. 2591.080 Positioning and final assembly from flat belt conveyor under the blenders 4 Tage 10.01.2022 17.02.2022 75% 15.12.21 NV Insterupted because the rails -for blender installation not available
A0982.00. 2551 Blender Line (1) 29 Tage 17.02.2022 23.03.2022 0% NV NV
A0982.00. 2551.000 Positioning and final assembly from blender (1) 3 Tage 17.02.2022 21.02.2022 20% NV NV Building / Foundation still not ready for installation, only pre assembly
A0982.00. 2551.601 Positioning and connecting drive with blender 2 Tage 21.02.2022 23.02.2022 0% NV NV
Customer Steel construction (Level-, Fix- and Grouting to the amount of: + 3.770 ) 0 Tage 23.02.2022 23.02.2022 0% 20.04.22 NV Start with steel construction
A0982.00. 2541.000 Straw Fibre belt scales bunker (1) Positioning and final assembly 5 Tage 23.02.2022 01.03.2022 70% 28.05.22 NV Lifting in postion (placed only )without centerlines marking
A0982.00. 2541.110 Install belt scale 3 Tage 01.03.2022 04.03.2022 100% 28.05.22 31.05.22
A0982.00. 2548.100 Install moisture analyser 3 Tage 04.03.2022 08.03.2022 0% NV NV
Customer Steel construction (Level-, Fix- and Grouting to the amount of: + 7.570 ) 0 Tage 08.03.2022 08.03.2022 0% 20.04.22 NV Start with steel construction
A0982.00. 2520.000 Silicat separation unit (1) Positioning and final assembly 10 Tage 08.03.2022 19.03.2022 70% 12.06.22 NV
A0982.00. 2531.000 Positioning radials fan with drive (Pneumatic transport system) 3 Tage 19.03.2022 23.03.2022 30% 28.04.22 NV Fan only placed
A0982.00. 2552 Blender Line (2) 26 Tage 19.02.2022 22.03.2022 0% NV NV
A0982.00. 2552.000 Positioning and final assembly from blender (2) 3 Tage 19.02.2022 23.02.2022 20% NV NV Building / Foundation still not ready for installation, only pre assembly
A0982.00. 2552.601 Positioning and connecting drive with blender 2 Tage 23.02.2022 25.02.2022 0% NV NV
Customer Steel construction (Level-, Fix- and Grouting to the amount of: + 3.770 ) 0 Tage 25.02.2022 25.02.2022 70% 20.04.22 NV Start with steel construction
A0982.00. 2542.000 Straw Fibre belt scales bunker (2) Positioning and final assembly 5 Tage 25.02.2022 03.03.2022 70% 28.05.22 NV Lifting in postion (placed only )without centerlines marking
A0982.00. 2542.110 Install belt scale 3 Tage 03.03.2022 07.03.2022 100% 28.05.22 31.05.22
Customer Steel construction (Level-, Fix- and Grouting to the amount of: + 7.570 ) 0 Tage 07.03.2022 07.03.2022 0% 20.04.22 NV Start with steel construction
A0982.00. 2522.000 Silicat separation unit (2) Positioning and final assembly 10 Tage 07.03.2022 18.03.2022 70% 12.06.22 NV
A0982.00. 2532.000 Positioning radials fan with drive (Pneumatic transport system) 3 Tage 18.03.2022 22.03.2022 30% 28.04.22 NV Fan only placed
A0982.00. 2553 Blender Line (3) 29 Tage 22.02.2022 28.03.2022 0% NV NV
A0982.00. 2553.000 Positioning and final assembly from blender (3) 3 Tage 22.02.2022 25.02.2022 20% NV NV Building / Foundation still not ready for installation, only pre assembly
A0982.00. 2553.601 Positioning and connecting drive with blender 2 Tage 25.02.2022 28.02.2022 0% NV NV
Customer Steel construction (Level-, Fix- and Grouting to the amount of: + 3.770 ) 0 Tage 28.02.2022 28.02.2022 40% 20.04.22 NV Start with steel construction
A0982.00. 2543.000 Straw Fibre belt scales bunker (3) Positioning and final assembly 5 Tage 28.02.2022 05.03.2022 70% 28.05.22 NV Lifting in postion (placed only )without centerlines marking
A0982.00. 2543.110 Install belt scale 3 Tage 05.03.2022 09.03.2022 100% 28.05.22 31.05.22
A0982.00. 2549.100 Install moisture analyser 3 Tage 09.03.2022 12.03.2022 0% NV NV
Customer Steel construction (Level-, Fix- and Grouting to the amount of: + 7.570 ) 0 Tage 12.03.2022 12.03.2022 0% NV NV Start with steel construction
A0982.00. 2525.000 Silicat separation unit (3) Positioning and final assembly 10 Tage 12.03.2022 24.03.2022 70% 12.06.22 NV
A0982.00. 2533.000 Positioning radials fan with drive (Pneumatic transport system) 3 Tage 24.03.2022 28.03.2022 30% 28.04.22 NV Fan only placed
A0982.00. 2554 Blender Line (4) 26 Tage 24.02.2022 26.03.2022 0% NV NV
A0982.00. 2554.000 Positioning and final assembly from blender (4) 3 Tage 24.02.2022 28.02.2022 20% NV NV Building / Foundation still not ready for installation, only pre assembly
A0982.00. 2554.601 Positioning and connecting drive with blender 2 Tage 28.02.2022 02.03.2022 0% NV NV
Customer Steel construction (Level-, Fix- and Grouting to the amount of: + 3.770 ) 0 Tage 02.03.2022 02.03.2022 70% 20.04.22 NV Start with steel construction
A0982.00. 2544.000 Straw Fibre belt scales bunker (4) Positioning and final assembly 5 Tage 02.03.2022 08.03.2022 70% 28.05.22 NV Lifting in postion (placed only )without centerlines marking
A0982.00. 2544.110 Install belt scale 3 Tage 08.03.2022 11.03.2022 100% 28.05.22 31.05.22
Customer Steel construction (Level-, Fix- and Grouting to the amount of: + 7.570 ) 0 Tage 11.03.2022 11.03.2022 70% NV NV Start with steel construction
A0982.00. 2528.000 Silicat separation unit (4) Positioning and final assembly 10 Tage 11.03.2022 23.03.2022 70% 12.06.22 NV
A0982.00. 2534.000 Positioning radials fan with drive (Pneumatic transport system) 3 Tage 23.03.2022 26.03.2022 10% NV NV fan only placed
Customer Steel construction (Level-, Fix- and Grouting to the amount of: + 18.970 ) 0 Tage 18.03.2022 18.03.2022 70% NV NV
Installation not possible missing steel construction
A0982.00. 2500 On Top of Silicat separation units 26 Tage 18.03.2022 18.04.2022 x 70% NV NV
platforms - handrails stairs
A0982.00. 2511.030 Twin screw conveyor between Silicat separation unit 1 & 2 3 Tage 18.03.2022 22.03.2022 70% 01.08.22 NV
A0982.00. 2505.100 Distributing flap on Silicat separation unit 1 & 2 4 Tage 22.03.2022 26.03.2022 70% 08.08.22 NV
A0982.00. 2512.030 Twin screw conveyor between Silicat separation unit 3 & 4 3 Tage 23.03.2022 26.03.2022 70% 01.08.22 NV
A0982.00. 2506.100 Distributing flap on Silicat separation unit 3 & 4 4 Tage 26.03.2022 31.03.2022 70% 09.08.22 NV
Customer Steel construction (Level-, Fix- and Grouting to the amount of: + 22.390 ) 0 Tage 26.03.2022 26.03.2022 0% NV NV no steel construction available
A0982.00. 2502.030 Twin screw conveyor for Blender line 1 & 2 4 Tage 26.03.2022 31.03.2022 70% 11.08.22 NV
A0982.00. 2503.030 Twin screw conveyor for Blender line 3 & 4 4 Tage 31.03.2022 05.04.2022 70% 13.08.22 NV
A0982.00. 2501.030 Twin screw conveyor for separation to the blender lines (1 & 2 / 3 & 4) 3 Tage 05.04.2022 08.04.2022 70% 16.08.22 NV
Customer Steel construction (Level-, Fix- and Grouting to the amount of: + 26.570 ) 0 Tage 18.04.2022 18.04.2022 0% NV NV no steel construction available
A0982.00. 2590 On Top of sifter system 18 Tage 18.04.2022 09.05.2022 x 66% NV NV
Customer Steel construction (Level-, Fix- and Grouting to the amount of: + 2.130 ) 0 Tage 18.04.2022 18.04.2022 0% NV NV
A0982.00. 2597.000 Positioning rotary airlock with drive 3 Tage 18.04.2022 21.04.2022 80% NV NV
A0982.00. 2598.000 Positioning rotary airlock with drive 3 Tage 21.04.2022 25.04.2022 80% NV NV
Customer Steel construction (Level-, Fix- and Grouting to the amount of: + 5.170 ) 0 Tage 25.04.2022 25.04.2022 0% NV NV
A0982.00. 2596.030 Twin screw conveyor between Sifter unit 1 & 2 4 Tage 25.04.2022 29.04.2022 60% NV NV
A0982.00. 2595.100 Distributing flap for separation to sifter unit 1 or 2 4 Tage 29.04.2022 04.05.2022 60% 06.09.22 NV

C:\Users\Daniel.Cervantes-Jan\Desktop\A0982 Ägypten Wotech\A0982 CW Weekly reports\2023\MW57-59 18.02.2023 CW07\A0982 Installations Site Report MW 59 - CW 07 2023.xlsx 3 / 11
A0982 Installations Site Report MW 59 - CW 07 2023.xlsx 20.02.2023

Customer Steel construction (Level-, Fix- and Grouting to the amount of: + 8.590 ) 0 Tage 04.05.2022 04.05.2022 0% NV NV
A0982.00. 2594.090 Diverter flap on top of the sifter system 4 Tage 04.05.2022 09.05.2022 50% 06.09.22 NV
A0982.00. 2600 / 2700 Sifter system 73 Tage 26.03.2022 20.06.2022 x 77% 06.03.22 NV
A0982.00. 2615.000 Sifter unit (1) 61 Tage 26.03.2022 06.06.2022 x 60% 23.03.22 NV
Customer Steel construction (Level-, Fix- and Grouting to the amount of: + 3.610 ) 0 Tage 26.03.2022 26.03.2022 0% 06.03.22 NV Start with the steel construction installation
2780.000 /
A0982.00. Positioning and leveling from heat exchanger 3 Tage 26.03.2022 30.03.2022 40% NV NV
2616.115
Customer Steel construction cyclon tower up to level sifter ready 0 Tage 26.03.2022 26.03.2022 0% NV NV
A0982.00. 2615.000 Place and connect sifter bottom,middle and top part 12 Tage 26.03.2022 09.04.2022 80% 21.03.22 NV
Customer Steel construction (Level-, Fix- and Grouting to the amount of: + 7.380 ) 0 Tage 09.04.2022 09.04.2022 50% NV NV
A0982.00. 2615.601 Positioning radials fan with drive 3 Tage 09.04.2022 13.04.2022 50% 30.05.22 NV fans only placed without top cover
Customer Connect pipes between sifter and cyclone above matformer 48 Tage 09.04.2022 04.06.2022 0% NV NV
Customer Steelsructure above matformer ready by customer for placing sifter cyclone 0 Tage 06.06.2022 06.06.2022 0% NV NV
A0982.00. 2616.000 Sifter unit (2) 66 Tage 04.04.2022 20.06.2022 x 60% 23.03.22 NV
Customer Steel construction (Level-, Fix- and Grouting to the amount of: + 3.610 ) 0 Tage 04.04.2022 04.04.2022 0% 06.03.22 NV Start with steel construction
Customer Steel construction cyclon tower up to level sifter ready 0 Tage 04.04.2022 04.04.2022 0% NV NV
A0982.00. 2616.000 Place and connect sifter bottom,middle and top part 12 Tage 04.04.2022 18.04.2022 80% 21.03.22 NV
Customer Steel construction (Level-, Fix- and Grouting to the amount of: + 7.380 ) 0 Tage 18.04.2022 18.04.2022 0% NV NV
A0982.00. 2616.601 Positioning radials fan with drive 3 Tage 18.04.2022 21.04.2022 50% 12.03.22 NV 4 fans are placed only
Customer Connect pipes between sifter and cyclone above matformer 48 Tage 18.04.2022 13.06.2022 0% NV
Customer Steel construction (Level-, Fix- and Grouting to the amount of: + 20.850 ) 0 Tage 13.06.2022 13.06.2022 0% NV NV
Customer Steel construction (Level-, Fix- and Grouting to the amount of: + 21.583 ) 0 Tage 20.06.2022 20.06.2022 70% NV NV
Customer Steelsructure above matformer ready by customer for placing sifter cyclone 0 Tage 14.06.2022 14.06.2022 0% NV NV
A0982.00. 2700 Extraction unit 34 Tage 09.05.2022 17.06.2022 x 49% 10.03.22 NV
A0982.00. 2771.000 Positioning and assembly from filter unit 4 Tage 09.05.2022 13.05.2022 50% NV NV
A0982.00. 2770.000 Positioning radials fan with drive (Pneumatic transport system) 3 Tage 13.05.2022 17.05.2022 50% NV NV only placed
A0982.00. 2782.000 HP blower unit with filter 3 Tage 17.05.2022 20.05.2022 10% NV NV only placed
A0982.00. 2783.000 HP rotary airlock with drive 4 Tage 20.05.2022 25.05.2022 50% NV NV
A0982.00. 2781.050 Positioning and final assembly from trough chain conveyor 5 Tage 25.05.2022 31.05.2022 80% 10.03.22 NV Complete installation of conveyor not possible , steel structure missing
A0982.00. 2784.000 Positioning from pulverizer 3 Tage 31.05.2022 03.06.2022 50% 30.03.22 NV Only placed
A0982.00. 2785.000 Positioning radials fan with drive (Pneumatic transport system) 3 Tage 03.06.2022 07.06.2022 100% 14.04.22 NV
A0982.00. 2786.000 Positioning and assembly from round filter for Silo (7140) 5 Tage 07.06.2022 13.06.2022 45% NV NV
A0982.00. 2787.090 Diverter flap on top of the Silo (7140) 4 Tage 13.06.2022 17.06.2022 10% NV NV
A0982.00. 3200 Glue preparation system 25 Tage 26.04.2022 24.05.2022 x 15% NV
A0982.00. 3200.100 Danger and information signs 2 Tage 23.05.2022 24.05.2022 0% NV NV
A0982.00. 3211 PMDI-storage and transfer system 0 Tage 26.04.2022 26.04.2022 0% NV NV
A0982.00. 3211.000 PMDI-storage and transfer system. Tanks/bins installation level and align. 9 Tage 26.04.2022 05.05.2022 100% 15.01.22 01.04.22
A0982.00. 3211.000 PMDI-storage and transfer system. Installation of aggregat and preheating device 6 Tage 06.05.2022 12.05.2022 10% 18.04.22 Parts only in placed
Customer 3211.000 PMDI-storage and transfer system. Installation of piping for glueing system 0 Tage 12.05.2022 12.05.2022 0% NV NV
Customer 3213.000 Raw glue preparation system (Buyer's scope) 0 Tage 12.05.2022 12.05.2022 0% NV NV
A0982.00. 3215 Water-storage and transfer system 0 Tage 13.05.2022 13.05.2022 1% NV NV only placed
A0982.00. 3215.000 Water-storage and transfer system consist of following components 2 Tage 13.05.2022 14.05.2022 5% NV NV
A0982.00. 3215.201 Components transfer system. Installation level and align 1 Tag 16.05.2022 16.05.2022 0% NV NV
A0982.00. 3215.205 Components transfer system. Installation level and align 1 Tag 17.05.2022 17.05.2022 0% NV NV
Customer 3216.000 Hardener preparation system (Buyer's scope) 0 Tage 17.05.2022 17.05.2022 0% NV NV
A0982.00. 3226 Emulsion-storage and transfer systems 0 Tage 18.05.2022 18.05.2022 5% NV NV
A0982.00. 3226.101 Truck discharging station. Installation level and align 4 Tage 18.05.2022 21.05.2022 0% NV NV
A0982.00. 3226.102 Tanks/bins of emulsion. Installation level and align 6 Tage 29.04.2022 05.05.2022 60% NV NV
A0982.00. 3226.103 Tanks/bins - accessories 0 Tage 05.05.2022 05.05.2022 5% NV NV
A0982.00. 3226.200 Components transfer system. Installation level and align 2 Tage 11.05.2022 12.05.2022 5% NV NV
Customer 3226.200 Components transfer system. Installation of piping for emulsion 0 Tage 12.05.2022 12.05.2022 0% NV NV
A0982.00. 3300 Glue dosing system 24 Tage 25.05.2022 17.06.2022 x 6% NV NV
A0982.00. 3300.100 Danger and information signs 2 Tage 25.05.2022 26.05.2022 0% NV NV
A0982.00. 3311 Dosing PMDI 0 Tage 26.05.2022 26.05.2022 0% NV NV
A0982.00. 3311.211 Components dosing system to dynamic mixer. Installation level and align 2 Tage 31.05.2022 01.06.2022 0% NV NV
A0982.00. 3311.212 Components dosing system to dynamic mixer. Installation level and align 2 Tage 02.06.2022 03.06.2022 0% NV NV
A0982.00. 3311.213 Components dosing system to dynamic mixer. Installation level and align 2 Tage 04.06.2022 06.06.2022 0% NV NV
A0982.00. 3311.214 Components dosing system to dynamic mixer. Installation level and align 2 Tage 07.06.2022 08.06.2022 0% NV NV
A0982.00. 3311.215 Components dosing system to refiner system. Installation level and align 2 Tage 09.06.2022 10.06.2022 5% NV NV
A0982.00. 3311.216 Components dosing system to refiner system. Installation level and align 2 Tage 11.06.2022 13.06.2022 5% NV NV
A0982.00. 3312 Dosing polyol 0 Tage 31.05.2022 31.05.2022 0% NV NV
A0982.00. 3312.211 Components dosing system to dynamic mixer. Installation level and align 2 Tage 31.05.2022 01.06.2022 0% NV NV
A0982.00. 3312.212 Components dosing system to dynamic mixer. Installation level and align 2 Tage 02.06.2022 03.06.2022 0% NV NV
A0982.00. 3312.213 Components dosing system to dynamic mixer. Installation level and align 2 Tage 04.06.2022 06.06.2022 0% NV NV
A0982.00. 3312.214 Components dosing system to dynamic mixer. Installation level and align 2 Tage 07.06.2022 08.06.2022 0% NV NV

C:\Users\Daniel.Cervantes-Jan\Desktop\A0982 Ägypten Wotech\A0982 CW Weekly reports\2023\MW57-59 18.02.2023 CW07\A0982 Installations Site Report MW 59 - CW 07 2023.xlsx 4 / 11
A0982 Installations Site Report MW 59 - CW 07 2023.xlsx 20.02.2023

Customer 3313.000 Raw glue dosing system (Buyer's scope) 0 Tage 08.06.2022 08.06.2022 0% NV NV
A0982.00. 3315 Dosing water 0 Tage 30.05.2022 30.05.2022 0% NV NV
A0982.00. 3315.101 Tanks/bins installation level and align 2 Tage 27.05.2022 28.05.2022 60% 21.03.22 NV Pump / Station only placed
A0982.00. 3315.105 Tanks/bins installation level and align 2 Tage 27.05.2022 28.05.2022 60% 21.03.22 NV Pump / Station only placed
A0982.00. 3315.211 Components dosing system to dynamic mixer. Installation level and align 2 Tage 30.05.2022 31.05.2022 0% NV NV
A0982.00. 3315.212 Components dosing system to dynamic mixer. Installation level and align 2 Tage 01.06.2022 02.06.2022 0% NV NV
A0982.00. 3315.213 Components dosing system to dynamic mixer. Installation level and align 2 Tage 03.06.2022 04.06.2022 0% NV NV
A0982.00. 3315.214 Components dosing system to dynamic mixer. Installation level and align 2 Tage 06.06.2022 07.06.2022 0% NV NV
A0982.00. 3315.215 Components dosing system to refiner system. Installation level and align 2 Tage 08.06.2022 09.06.2022 5% NV NV
A0982.00. 3315.216 Components dosing system to refiner system. Installation level and align 2 Tage 10.06.2022 11.06.2022 5% NV NV
Customer 3316.000 Hardener dosing system (Buyer's scope) 0 Tage 11.06.2022 11.06.2022 0% NV NV
Customer 3323.000 Release agent (Buyer's scope) 0 Tage 11.06.2022 11.06.2022 0% NV NV
A0982.00. 3326 Dosing emulsion 0 Tage 01.06.2022 01.06.2022 0% NV NV
A0982.00. 3326.100 Tanks/bins. Installation level and align 2 Tage 30.05.2022 31.05.2022 60% 21.03.22 NV Only placed
A0982.00. 3326.215 Components dosing system 2 Tage 01.06.2022 02.06.2022 5% NV NV
A0982.00. 3326.216 Components dosing system 2 Tage 01.06.2022 02.06.2022 5% NV NV
A0982.00. 3330 Cleaning agent 0 Tage 14.06.2022 14.06.2022 0% NV NV
A0982.00. 3330.210 Components dosing system. Installation level and align 2 Tage 14.06.2022 15.06.2022 0% NV NV
A0982.00. 3331 Protection agent 0 Tage 16.06.2022 16.06.2022 0% NV NV
A0982.00. 3331.210 Components dosing system. Installation level and align 2 Tage 16.06.2022 17.06.2022 0% NV NV
A0982.00. 3380 Dynamic mixer (PMDI & Polyol) 0 Tage 27.05.2022 27.05.2022 0% NV NV
A0982.00. 3380.211 Dynamic mixer. Installation level and align 6 Tage 27.05.2022 02.06.2022 0% NV NV
A0982.00. 3380.212 Dynamic mixer. Installation level and align 6 Tage 31.05.2022 06.06.2022 0% NV NV
A0982.00. 3380.213 Dynamic mixer. Installation level and align 6 Tage 03.06.2022 09.06.2022 0% NV NV
A0982.00. 3380.214 Dynamic mixer. Installation level and align 6 Tage 07.06.2022 13.06.2022 0% NV NV
Customer 3381.000 Static mixer (Buyer's scope) 0 Tage 13.06.2022 13.06.2022 0% NV NV
A0982.00. 3390 Glue injection 0 Tage 01.06.2022 08.06.2022 0% NV NV
A0982.00. 3390.220 PMDI injection 6 Tage 01.06.2022 08.06.2022 0% NV NV
A0982.00. 3390.210 Glue injection pipes (Connecting parts for refiner) 0 Tage 08.06.2022 08.06.2022 0% NV NV
A0982.00. 3390.540 PMDI injection pipes (Components glue distribution Refiner 1 & 2) 0 Tage 08.06.2022 08.06.2022 0% NV NV
A0982.00. 3390.550 Blowline Components (2 blowline, 2 nozzle) 0 Tage 08.06.2022 08.06.2022 0% NV NV
A0982.00. 3900 Extraction system 0 Tage 26.04.2022 17.06.2022 x 6% NV NV
A0982.00. 3900.000 Pneumatic and mechanical conveyors 9 Tage 21.05.2022 01.06.2022 1% 15.07.22 NV Oly single pipe placed
A0982.00. 3905.000 Pneumatic conveyor 1 Tag 01.06.2022 01.06.2022 10% 15.07.22 NV Fan only placed
Customer 3905.000 Structural steelwork, cyclone separator, piping, bends, flanges, chutes, burst disc, etc. Buyer's scope 0 Tage 17.06.2022 17.06.2022 0% NV NV
Customer Supplies and services to be provided by the buyer 46 Tage 26.04.2022 17.06.2022 0% NV NV
Customer Appendix No.3 list of supplies and services to be provided by the buyer 0 Tage 26.04.2022 26.04.2022 0% NV NV
Customer Installation of pipes and connection between all components 0 Tage 17.06.2022 17.06.2022 0% NV NV
A0982.00. 4200/4300 Forming line 108 Tage 19.01.2022 24.05.2022 x 44% 19.01.22 NV
A0982.00. 4300 Stations under matformer 22 Tage 19.01.2022 12.02.2022 x 87% NV NV
A0982.00. 4399.100 Lay foundation plates of forming line (measuring, adjusting and fixing by dowels) 6 Tage 19.01.2022 25.01.2022 70% 19.01.22 Foundation plate , not completed because of hot platen puling
A0982.00. 4310.111 Tensioning station installation level and align 4 Tage 26.01.2022 29.01.2022 100% 24.03.22 01.08.22
A0982.00. 4310.211 Table for bottom spraying divice (dependent of space in mat former area) 1 Tag 31.01.2022 31.01.2022 70% 24.03.22 NV
A0982.00. 4310.311 Intermediat stations under the mat former 9 Tage 01.02.2022 10.02.2022 95% 27.03.22 NV
A0982.00. 4320.000 Belt scale 2 Tage 11.02.2022 12.02.2022 100% 17.07.22 28.08.22
A0982.00. 4200 Matformer MDF 86 Tage 14.02.2022 24.05.2022 x 87% 18.02.22 NV
A0982.00. 4220.856 General assembly aids 0 Tage 14.02.2022 14.02.2022 100% 14.03.22 NV
Customer Steel structure of foming line (buyer´s scope of supply) has to be installed parallel with Siempelkamp equipment 86 Tage 14.02.2022 24.05.2022 30% 01.12.21 NV
Customer Steel construction (Level-, Fix- and Grouting to the amount of: +4375 ) 0 Tage 05.03.2022 05.03.2022 70% 01.12.21 NV Steel construction ready without platforms stairs -gratings -hand rails
A0982.00. 4220.200 Preassembling of bunker parts 16 Tage 05.03.2022 23.03.2022 95% 05.02.22 NV
A0982.00. 4220.200 Place bunker parts (to consist of bin housing, bin bottom belt, leveling sys, accessouries, discharge front,…) 2 Tage 24.03.2022 25.03.2022 90% 13.03.22 NV
Customer Structure with stairs, hand rails, gratings for level of forming head, equalising unit, matformer, distributor chute and douple screw 86 Tage 14.02.2022 24.05.2022 0% NV NV Not completed , grating handrails stair not available
Customer Steel construction (Level-, Fix- and Grouting to the amount of: +3875 ) 0 Tage 15.02.2022 15.02.2022 70% NV NV Not completed , grating handrails stair not available
A0982.00. 4220.424 Place forming head on top of intermediate station (position to connect with steel structure) 1 Tag 15.02.2022 15.02.2022 100% 01.03.22 01.03.22
A0982.00. 4220.321 Chute under matformer 0 Tage 15.02.2022 15.02.2022 100% 01.03.22 22.03.22
A0982.00. 4220.500 Install Spindle element (2x) for the mat equalising into the steel structure 1 Tag 16.02.2022 16.02.2022 100% 18.02.22 22.03.22
A0982.00. 4220.528 Place mat equalising unit on top of intermediate station (position to connect with steel structure) 1 Tag 17.02.2022 17.02.2022 100% 01.03.22 08.03.22
A0982.00. 4220.400 Install Spindle element for the forming head into the steel structure 1 Tag 18.02.2022 18.02.2022 100% 18.02.22 08.03.22
A0982.00. 4220.424 Forming head (starformer) level and align 3 Tage 18.02.2022 21.02.2022 100% 25.02.22 08.03.22
A0982.00. 4220.826 Discharge screw 1 Tag 21.02.2022 21.02.2022 100% 18.02.22 NV
A0982.00. 4220.300 Feeding chute to supply fibre to the forming head 1 Tag 22.02.2022 22.02.2022 100% 09.03.22 24.03.22
A0982.00. 4220.528 Mat equalising unit level and align 3 Tage 23.02.2022 25.02.2022 100% 11.03.22 24.03.22
A0982.00. 4310.412 Side walls for mat forming upstream of prepress 6 Tage 26.02.2022 04.03.2022 90% 20.07.22 NV
A0982.00. 4220.261 Limit switches, filling level monitoring 1 Tag 23.03.2022 23.03.2022 100% 10.04.22 NV

C:\Users\Daniel.Cervantes-Jan\Desktop\A0982 Ägypten Wotech\A0982 CW Weekly reports\2023\MW57-59 18.02.2023 CW07\A0982 Installations Site Report MW 59 - CW 07 2023.xlsx 5 / 11
A0982 Installations Site Report MW 59 - CW 07 2023.xlsx 20.02.2023

A0982.00. 4220.200 Final assembly of bunker and adjustment in centre and level 2 Tage 26.03.2022 28.03.2022 90% 06.04.22 NV Not completed
A0982.00. 4220.213 Bunker leveling system 1 Tag 29.03.2022 29.03.2022 90% 30.03.22 2 chain guides missing
A0982.00. 4220.261 Drive for bunker belt 1 Tag 30.03.2022 30.03.2022 85% 10.08.22 NV no tensioning possible
A0982.00. 4220.116 Fibre retarder (for gentle transfer and equalizing) in top of matformer. Level and align 2 Tage 31.03.2022 01.04.2022 90% 11.04.22 NV Not completed -greasing pipe open
A0982.00. 4220.115 Distributor chute with drive level and align 2 Tage 02.04.2022 04.04.2022 90% 07.04.22 NV Not completed- greasing pipe open
A0982.00. 4210.030 Douple screw placing on steel structure, leveling and adjustment 4 Tage 05.04.2022 08.04.2022 90% NV NV Missing covers of the flaps
A0982.00. 4210.130 Explosion protection system negativ pressure flapps 4 Tage 09.04.2022 13.04.2022 0% NV NV
A0982.00. 4210.781 Explosion protection system 4 Tage 14.04.2022 18.04.2022 0% NV NV
A0982.00. 4220.781 Explosion protection system 4 Tage 19.04.2022 22.04.2022 0% NV NV
A0982.00. 4220.730 Customer supply explosion protection 1 Tag 23.04.2022 23.04.2022 0% NV NV
A0982.00. 4220.210 Bunker belt (installation after welding and grinding works) 1 Tag 25.04.2022 25.04.2022 90% 20.08.22 NV
A0982.00. 4300 Forming line after matformer 99 Tage 26.04.2022 18.08.2022 x 22% NV NV
A0982.00. 4330 Pre-press 32 Tage 26.04.2022 01.06.2022 75% NV NV
A0982.00. 4330.110 Foundation plates of pre-press (level and align according metering points and tolerances given by Siempelkamp) 2 Tage 26.04.2022 27.04.2022 x 100% 20.08.22 NV
Customer After leveling pour the anchor bolts, fine adjustment of plates and grouting the plates with non shrinking concrete 1 Tag 28.04.2022 28.04.2022 0% NV NV
A0982.00. 4330.856 General assembly aids 0 Tage 26.04.2022 26.04.2022 80% NV NV
A0982.00. 4330.100 Installation bottom part of pre press (Pre-assembling, align to centre line and reference point) 10 Tage 26.04.2022 06.05.2022 100% 29.08.22 12.09.22
A0982.00. 4330.140 Guide of pre- press (between lower and upper part) 1 Tag 07.05.2022 07.05.2022 100% 05.09.22 NV
A0982.00. 4330.300 Installation upper part of pre- press (Pre-assembling and put on the bottom part) 10 Tage 07.05.2022 18.05.2022 100% 06.09.22 NV
A0982.00. 4330.210 Main hydraulic cylinder (for lift up upper part of pre- press) 1 Tag 19.05.2022 19.05.2022 90% NV NV
A0982.00. 4330.530 Gear boxes for pre- press (incl. accessories gear box) 2 Tage 20.05.2022 21.05.2022 100% 26.10.22 NV
A0982.00. 4330.520 Main drives pre- press 1 Tag 23.05.2022 23.05.2022 80% 28.11.22 NV
A0982.00. 4330.400 Air evacuation area 3 Tage 24.05.2022 26.05.2022 90% 22.09.22 NV
A0982.00. 4330.450 Side walls evacuation area 1 Tag 27.05.2022 27.05.2022 90% NV NV
A0982.00. 4330.160 Side walls of pre- press 3 Tage 28.05.2022 31.05.2022 100% NV NV
A0982.00. 4330.853 Limit switches, sensors 1 Tag 01.06.2022 01.06.2022 80% NV NV
A0982.00. 4332 Hydrailic system for pre-press 2 Tage 19.05.2022 20.05.2022 50% NV NV
A0982.00. 4332.100 Hydraulic aggregat 1 Tag 19.05.2022 19.05.2022 0% NV NV
A0982.00. 4332.700 Hydraulic connecting pipes 1 Tag 20.05.2022 20.05.2022 60% NV NV
A0982.00. 4336 Edge trimming saw forming line 6 Tage 02.06.2022 08.06.2022 0% NV NV
A0982.00. 4336.100 Saw unit (consist of gantry across the forming line, 2 moveable carriage, 2 trimming units) level and align 4 Tage 02.06.2022 06.06.2022 0% NV NV
A0982.00. 4336.200 Collecting hogger for extraction system 1 Tag 07.06.2022 07.06.2022 0% NV NV
A0982.00. 4336.853 Limit switch of saw unit 1 Tag 08.06.2022 08.06.2022 0% NV NV
A0982.00. 4336.800 Accessories for trimming saw 0 Tage 08.06.2022 08.06.2022 0% NV NV
A0982.00. Forming line 11 Tage 09.06.2022 21.06.2022 0% NV NV
A0982.00. 4310.411 Tables for ancillary equipment (pre-assemble level and align according metering points) 8 Tage 09.06.2022 17.06.2022 0% NV NV
A0982.00. 4342.000 Metal detector 1 Tag 18.06.2022 18.06.2022 0% NV NV
A0982.00. 4341.000 Density gauge mat scanner NEO 2 Tage 20.06.2022 21.06.2022 0% NV NV
A0982.00. 4350 Reject mat hopper 6 Tage 22.06.2022 28.06.2022 0% NV NV
Customer Steel construction (Steel support for Suction system incl. Pipe) 0 Tage 22.06.2022 22.06.2022 0% NV NV
A0982.00. 4350.014 Disintegrating rollers with drives level and align 2 Tage 22.06.2022 23.06.2022 50% NV NV
A0982.00. 4350.010 Reject mat hopper with track for reject mat nose level and align 4 Tage 24.06.2022 28.06.2022 20% NV NV
A0982.00. 4310 Drive station 10 Tage 28.06.2022 09.07.2022 0% NV NV
A0982.00. 4310.556 Transport aids 0 Tage 28.06.2022 28.06.2022 0% NV NV
A0982.00. 4310.520 Frame of drive station. Assembling level and align 8 Tage 29.06.2022 07.07.2022 0% NV NV
A0982.00. 4310.511 Gearbox for drive station level and align 2 Tage 08.07.2022 09.07.2022 0% NV NV
A0982.00. 4310.561 Servo drive (forming belt) 2 Tage 08.07.2022 09.07.2022 0% NV NV
A0982.00. 4380 Intermediate belt 9 Tage 11.07.2022 20.07.2022 0% NV NV
Customer Steel construction (Steel support under the intermediate belt) 0 Tage 11.07.2022 11.07.2022 0% NV NV
A0982.00. 4380.100 Intermediate belt station 4 Tage 11.07.2022 14.07.2022 0% NV NV
A0982.00. 4380.115 Drive parts 1 Tag 15.07.2022 15.07.2022 0% NV NV
A0982.00. 4380.120 Gearbox 1 Tag 16.07.2022 16.07.2022 0% NV NV
A0982.00. 4380.161 Servo motor 1 Tag 18.07.2022 18.07.2022 0% NV NV
A0982.00. 4380.853 Limit switches, sensors 1 Tag 19.07.2022 19.07.2022 0% NV NV
A0982.00. 4380.110 Belt for intermediate station (installation after welding and grinding works) 1 Tag 20.07.2022 20.07.2022 0% NV NV
A0982.00. Forming line accessories 0 Tage 20.07.2022 20.07.2022 0% NV NV
A0982.00. 4399.400 Interface drawings steelwork 0 Tage 20.07.2022 20.07.2022 0% NV NV
A0982.00. 4399.430 Interface drawing steelwork intermediate belt 0 Tage 20.07.2022 20.07.2022 0% NV NV
A0982.00. Finalisation forming line / forming belt 46 Tage 09.06.2022 01.08.2022 0% NV NV
A0982.00. 4328.010 Peak detector upstream metal detector between trimming saw and metal detector 2 Tage 09.06.2022 10.06.2022 0% NV NV
A0982.00. 4382.010 Peak detector on intermediate belt 2 Tage 20.07.2022 21.07.2022 0% NV NV
A0982.00. 4322.100 Infrared moisture analyser 1 Tag 22.07.2022 22.07.2022 0% NV NV
A0982.00. 4327.200 Belt spraying device 4 Tage 23.07.2022 27.07.2022 0% NV NV
A0982.00. 4344.200 Mat spraying device 4 Tage 28.07.2022 01.08.2022 0% NV NV

C:\Users\Daniel.Cervantes-Jan\Desktop\A0982 Ägypten Wotech\A0982 CW Weekly reports\2023\MW57-59 18.02.2023 CW07\A0982 Installations Site Report MW 59 - CW 07 2023.xlsx 6 / 11
A0982 Installations Site Report MW 59 - CW 07 2023.xlsx 20.02.2023

A0982.00. Measurement stage II 10 Tage 02.08.2022 12.08.2022 0% NV NV


A0982.00. VS Measuring of the ContiRoll press and forming line 10 Tage 02.08.2022 12.08.2022 0% NV NV
A0982.00. Forming belt 5 Tage 13.08.2022 18.08.2022 0% NV NV
A0982.00. 4310.600 Lay on and vulcanize forming line belt 5 Tage 13.08.2022 18.08.2022 0% NV NV
A0982.00. Technical safety requirements (Forming line) / Start of Installation 67 Tage 01.06.2022 18.08.2022 0% NV NV
A0982.00. 4220.852 Technical safety requirements for mat former 0 Tage 18.08.2022 18.08.2022 0% NV NV
A0982.00. 4399.352 Safety equipment / fences for forming line 0 Tage 01.08.2022 01.08.2022 0% NV NV
A0982.00. 4399.353 Safety sensors for forming line 0 Tage 01.08.2022 01.08.2022 0% NV NV
A0982.00. 4336.852 Safety equipment / fences for trimming saw 0 Tage 08.06.2022 08.06.2022 0% NV NV
A0982.00. 4330.852 Safety equipment / fences for prepress 0 Tage 01.06.2022 01.06.2022 0% NV NV
A0982.00. 4310.852 Safety equipment / fences for drive station 0 Tage 09.07.2022 09.07.2022 0% NV NV
A0982.00. 4380.852 Safety equipment / fences for intermediate belt station 0 Tage 20.07.2022 20.07.2022 0% NV NV
A0982.00. 4520 ContiRoll® (8' x 48,7 m) 171 Tage 10.01.2022 17.08.2022 x 39% NV NV
A0982.00. 4520.630 Special tools 0 Tage 15.01.2022 15.01.2022 50% NV NV
A0982.00. 4520.629 General assembly aids 0 Tage 15.01.2022 15.01.2022 60% NV NV
A0982.00. 4550.001 Positioning of sludge tank in the press pit (see also group 4550) 1 Tag 17.01.2022 17.01.2022 70% 17.01.22 NV Only placed
A0982.00. 4520.110 Pre-assembly and positioning from the Foundation beams (IPBv/HEM-Beam) 6 Tage 10.01.2022 07.02.2022 100% 13.12.21 01.02.22
4520.327 /
A0982.00. Cleaning brush in outfeed area / Foundation plates for outfeed drum 1 Tag 08.02.2022 08.02.2022 80% 02.02.22 NV Grasing pipes / safety covers open
4520.110
A0982.00. 4520.324 Bottom belt support rolles (Leveling and align) 3 Tage 17.01.2022 11.02.2022 80% 17.01.22 NV Greasing pipes / sensors installation open
A0982.00. 4520.334 Insolations tunnel bottom 16 Tage 19.01.2022 26.02.2022 70% 19.01.22 NV
A0982.00. 4520.326 Bottom belt tracking unit (Installation with substructure) 3 Tage 11.02.2022 15.02.2022 80% 09.02.22 NV
A0982.00. 4520.313 Drive shaft for bottom chain return system 1 Tag 15.02.2022 16.02.2022 90% 10.02.22 NV Greasing pipes open
A0982.00. 4520.310 Chain return guide bottom (Leveling and align) 5 Tage 16.02.2022 22.02.2022 100% 02.02.22 30.03.22
A0982.00. 4520.320 Pre-assembling of outfeed frame (Leveling and align) 5 Tage 22.02.2022 28.02.2022 100% 03.03.22 08.03.22
A0982.00. 4520.322 Outfeed drum (Installation from bottom and top drum) 2 Tage 28.02.2022 02.03.2022 100% 06.03.22 17.03.22
A0982.00. 4520.111 Press frames (59 Pieces), measure height and position to reference point and center line 16 Tage 02.03.2022 21.03.2022 100% 16.02.22 17.04.22
Start pre assembling / pulling start on 22 May 2022
A0982.00. 4520.112 Pressure distribution plates 3 Tage 21.03.2022 24.03.2022 100% 08.05.22 29.05.22
8 Days use for the installation to much
A0982.00. 4520.314 Chain spanner on the last press frame 3 Tage 24.03.2022 28.03.2022 50% 06.04.22 NV
A0982.00. VS Measurement stage I (Measuring of the Press frames from ContiRoll press and checking from main axes, marking auxiliary and additional axes) 6 Tage 28.03.2022 04.04.2022 100% 15.03.22 21.03.22
Customer Pouring sliding plates of the foundation beams and foundation plates from outfeed drum 0 Tage 04.04.2022 04.04.2022 90% 01.05.22 NV Foundation beam completed - out feed drum 90%
A0982.00. 4520.351 Installation of "Sandwich" pulling device 3 Tage 04.04.2022 07.04.2022 100% 21.03.22 NV
A0982.00. 4520.119 Collectors for secondary heating puting into the press frames 1 Tag 04.04.2022 05.04.2022 100% 29.05.22 01.06.22
A0982.00. 4520.315 Oil tray for chain guide also puting into the press frames 1 Tag 05.04.2022 06.04.2022 100% 15.06.22 15.06.22
A0982.00. 4520.123 Center guide on the pressure distribution plates 1 Tag 06.04.2022 07.04.2022 100% 30.03.22 31.05.22
A0982.00. 4520.110 Foundation beams on top of the Press (Stiffening girder) 4 Tage 04.04.2022 08.04.2022 100% 14.03.22 25.04.22
A0982.00. 4520.324 Upper belt support rolles on the foundation beams 3 Tage 08.04.2022 12.04.2022 90% 18.04.22 NV Grasing pipes open
4520.117 / .113 /
A0982.00. Pulling of hot plates - As a Sandwich with press cylinders (.113/.114) and chain guide (.315) 12 Tage 12.04.2022 26.04.2022 100% 10.01.23 12.02.23
.114 / .315
A0982.00. 4520.113 Press cylinder 12 Tage 12.04.2022 26.04.2022 50% 01.04.22 NV
A0982.00. 4520.114 Press cylinder mounting parts 12 Tage 12.04.2022 26.04.2022 70% 01.06.22 NV
A0982.00. 4520.315 Installation of chain guide (bottom and upper hot platen) 12 Tage 12.04.2022 26.04.2022 90% NV NV
A0982.00. 4520.137 Installation of isolation for hot plates 3 Tage 26.04.2022 29.04.2022 70% 02.03.22 NV
A0982.00. 4520.210 Infeed head (Installation from bottom and upper part) 4 Tage 29.04.2022 04.05.2022 0% NV NV
A0982.00. 4520.313 Drive shaft for upper chain return system 1 Tag 04.05.2022 05.05.2022 0% NV NV
A0982.00. 4520.319 Installtion of Infeed frame left and right 4 Tage 05.05.2022 10.05.2022 0% NV NV
A0982.00. 4520.326 Upper belt tracking unit (Installation with substructure) 3 Tage 10.05.2022 13.05.2022 0% NV NV
A0982.00. 4520.321 Infeed drum (Installation from bottom and top drum) 2 Tage 13.05.2022 16.05.2022 0% NV NV
A0982.00. 4520.325 Installation of walk ways and handrails 9 Tage 16.05.2022 26.05.2022 70% 08.05.22 NV
A0982.00. 4520.316 Chain return guide upper (Leveling and align) 5 Tage 26.05.2022 01.06.2022 100% 22.04.22 03.06.22
A0982.00. 4520.333 Isolation tunnel on the top of the Press 6 Tage 01.06.2022 08.06.2022 60% 22.04.22 NV
A0982.00. 4520.318 Cleaning brush in Infeed area 2 Tage 08.06.2022 10.06.2022 0% NV NV
A0982.00. 4520.118 Hydraulic pipes 11 Tage 10.06.2022 23.06.2022 0% NV NV
A0982.00. 4520.335 Gearbox mounting parts for main drives and for chain drives 1 Tag 28.03.2022 29.03.2022 x 90% 09.08.22 NV
A0982.00. 4520.360 Mounting gearboxes with torque support on lower and upper outfeed drum 3 Tage 29.03.2022 01.04.2022 x 90% 09.08.22 NV
A0982.00. 4520.312 Mounting gearboxes for chain drives 3 Tage 01.04.2022 05.04.2022 0% NV NV
A0982.00. 4520.361 Mounting main drives and chain drives 3 Tage 05.04.2022 08.04.2022 0% NV NV
A0982.00. 4520.216 Infeed adjusting system 2 Tage 08.04.2022 11.04.2022 0% NV NV
A0982.00. 4520.221 Roller-rod-guide 4 Tage 11.04.2022 15.04.2022 0% NV NV
A0982.00. 4520.212 Infeed steel sheet covering 1 Tag 15.04.2022 16.04.2022 0% NV NV
A0982.00. 4520.314 Placement of pneumatic cabinets for Outfeed-Site 1 Tag 16.04.2022 18.04.2022 0% NV NV
A0982.00. 4520.314 Pneumatic piping for Roller-rod-chain (Chain -tensioning, -greasing, -cleaning) 9 Tage 18.04.2022 28.04.2022 0% NV NV
A0982.00. 4520.314 Pneumatic piping for steel belt tracking unit 6 Tage 28.04.2022 05.05.2022 0% NV NV
A0982.00. 4520.314 Pneumatic piping for brake of main drive 4 Tage 05.05.2022 10.05.2022 0% NV NV
A0982.00. 4520.314 Lubrication piping for Chain spanner (Bearings) 9 Tage 10.05.2022 20.05.2022 0% NV NV

C:\Users\Daniel.Cervantes-Jan\Desktop\A0982 Ägypten Wotech\A0982 CW Weekly reports\2023\MW57-59 18.02.2023 CW07\A0982 Installations Site Report MW 59 - CW 07 2023.xlsx 7 / 11
A0982 Installations Site Report MW 59 - CW 07 2023.xlsx 20.02.2023

A0982.00. 4520.328 Placement of oil aggregate for Lubrication system 1 Tag 20.05.2022 21.05.2022 0% NV NV
A0982.00. 4520.328 Lubrication piping for Roller-rod and Roller-rod-chain 9 Tage 21.05.2022 01.06.2022 0% NV NV
A0982.00. 4520.323 Suction and covering at outfeed area 8 Tage 01.06.2022 10.06.2022 0% NV NV
A0982.00. 4520.331 Transfer roller conveyor 3 Tage 10.06.2022 14.06.2022 0% NV NV
A0982.00. 4520.125 Remaining parts (Signboard) 1 Tag 14.06.2022 15.06.2022 0% NV NV
A0982.00. 4520.400 Automation (Sensors and encoder) 2 Tage 15.06.2022 17.06.2022 0% NV NV
A0982.00. 4520.253 Roller-rod control (Sensors for infeed and oufeed) 3 Tage 17.06.2022 21.06.2022 0% NV NV
A0982.00. 4520.410 Limit switches and position encoder (Bolt control, chain guide tracking, steel belt tracking unit outfeed etc.) 3 Tage 21.06.2022 24.06.2022 0% NV NV
A0982.00. 4520.415 Temperature sensor (PT100) for hot plates and bearings of infeed and outfeed drums 2 Tage 24.06.2022 27.06.2022 0% NV NV
A0982.00. 4520.417 Mounting parts position encoder (Steel belt tracking unit for infeed drum and in the middel of the press, infeed head, chain spanner, steel belt tensioning system) 6 Tage 27.06.2022 04.07.2022 0% NV NV
A0982.00. 4520.424 Mounting parts position encoder (Press distance) 6 Tage 04.07.2022 11.07.2022 0% NV NV
A0982.00. *.424/.430 Measuring frame for control system 6 Tage 11.07.2022 18.07.2022 0% NV NV
A0982.00. 4520.330 Steelbelt surface control system 5 Tage 18.07.2022 23.07.2022 0% NV NV
A0982.00. 4520.317 Roller-rod chain install 6 Tage 10.06.2022 17.06.2022 0% NV NV
A0982.00. 4520.317 Roller-rod install (10.350 Pieces delivered) 12 Tage 17.06.2022 01.07.2022 0% NV NV
A0982.00. 4520.350 Steel belt pulling device 3 Tage 01.07.2022 05.07.2022 0% NV NV
A0982.00. 4520.363 Steel belt pulling 6 Tage 05.07.2022 12.07.2022 0% NV NV
A0982.00. 4579.000 Steel belt repair welding apparatus 0 Tage 12.07.2022 12.07.2022 0% NV NV
A0982.00. 4520.363 Steel belt welding 3 Tage 12.07.2022 15.07.2022 0% NV NV
A0982.00. *.333/.334 Isolation tunnel complement after Steel belt welding 6 Tage 15.07.2022 22.07.2022 0% NV NV
A0982.00. 4520.000 Technical safety equipment (Press line) 12 Tage 22.07.2022 05.08.2022 0% NV NV
A0982.00. 4520.329 Safety fences along the ContiRoll-press 12 Tage 22.07.2022 05.08.2022 0% NV NV
A0982.00. 4540.000 Hydraulic for ContiRoll® (8'x 48,7 m) 119 Tage 10.01.2022 18.06.2022 90% NV NV
A0982.00. 4540.010 Positioning of the hydraulic unit 1 Tag 10.01.2022 10.01.2022 80% 26.02.22 NV Only placed
A0982.00. 4540.014 Hydraulic beams on the stairway along the press 3 Tage 10.06.2022 14.06.2022 100% 18.06.22 01.08.22
A0982.00. 4540.013 Connection hydraulic pipes between hydraulic unit and ContiRoll-press 4 Tage 14.06.2022 18.06.2022 90% 15.07.22 NV
A0982.00. 4571 Steel belt cleaning device (Bravo-Tech) 16 Tage 12.07.2022 30.07.2022 0% NV NV
A0982.00. 4571.000 Positioning and installation of steel belt cleaning device 10 Tage 12.07.2022 23.07.2022 0% NV NV
A0982.00. 4572.000 Installation of release agent application device 6 Tage 23.07.2022 30.07.2022 0% NV NV
A0982.00. 4592.000 Fire extinguishing system (MiniMax) 40 Tage 01.07.2022 17.08.2022 0% NV NV
A0982.00. 4592.000 Positioning of the valve stations for fire extinguishing 1 Tag 01.07.2022 02.07.2022 0% NV NV
A0982.00. 4592.000 Fire extinguishing pipes and fire detection along the ContiRoll-Press 11 Tage 02.07.2022 15.07.2022 0% NV NV
A0982.00. 4592.000 Fire extinguishing pipes and fire detection in the heating pipe channel 11 Tage 15.07.2022 28.07.2022 0% NV NV
A0982.00. 4592.000 Fire extinguishing pipes and fire detection in the secondary heating room 11 Tage 28.07.2022 10.08.2022 0% NV NV
A0982.00. 4592.000 Connection fire extinguishing pipes between vale stations and ContiRoll-press 6 Tage 10.08.2022 17.08.2022 0% NV NV
A0982.00. 4720.000 Secondary heating 113,56 Tage 08.02.2022 20.06.2022 54% NV NV
A0982.00. 4720.120 Positioning of the pump station from secondary heating 2 Tage 08.02.2022 09.02.2022 90% 15.02.22 NV Pumps in position - grouting open
Steel construction not available
A0982.00. 4720.140 Steel structural and supports for heating pipes 0 Tage 01.04.2022 01.04.2022 85% 15.07.22 NV
start with supports incl. Pipe clamps installation CW 22
A0982.00. 4520.120 Connecting heating pipes between collectors and hot plates 27 Tage 01.04.2022 03.05.2022 35% 01.06.22 NV
A0982.00. 4720.130 Connecting heating pipes (Secondary site) 22 Tage 03.05.2022 28.05.2022 90% 10.05.22 NV Pipes are installed - welded only at channel without fix / lose point
A0982.00. 4720.110 Connecting heating pipes (Primary site) 6 Tage 28.05.2022 04.06.2022 80% 15.07.22 NV Start pre assembling / installation
A0982.00. 4720.002 Connecting purging pipes and pneumatic pipe for rapid-acting valve (Schematic plan) 11 Tage 04.06.2022 17.06.2022 0% NV NV
A0982.00. 4720.000 Pressure test of secondary heating circuit 2 Tage 17.06.2022 20.06.2022 0% NV NV
A0982.00. 4550 Press fume extraction system for ContiRoll® 123 Tage 15.01.2022 22.06.2022 x 57% 15.01.22 NV
A0982.00. 4550.015 Technical documents (layout etc.) 0 Tage 04.05.2022 04.05.2022 0% NV NV
A0982.00. 4550.000 Installation of extraction system 42 Tage 04.05.2022 22.06.2022 0% NV NV
Customer Steel construction (Steel support for Sludge tank) 0 Tage 15.01.2022 17.01.2022 100% 15.01.22 20.01.22
A0982.00. 4550.001 Positioning of sludge tank in the press pit (4520.000) 1 Tag 17.01.2022 17.01.2022 x 70% 17.01.22 NV
A0982.00. 4550.012 Positioning of the radial fan with support stucture (4550.016) 1 Tag 04.05.2022 05.05.2022 100% 22.05.22 NV Only placed
Customer 4550.010 Noise protected cabin for radial fan 0 Tage 05.05.2022 05.05.2022 0% NV NV
A0982.00. 4550.002 Positioning and installation of sedimentation tank 2 Tage 05.05.2022 07.05.2022 70% 22.05.22 NV
A0982.00. 4550.004 Installation platform on sedimentation tank 4 Tage 07.05.2022 12.05.2022 100% 30.05.22 31.07.22
Customer 4550.010 Container for discharge Sedimentation tank 0 Tage 12.05.2022 12.05.2022 0% NV NV
A0982.00. 4550.003 Positioning and installation of final separator 1 Tag 05.05.2022 06.05.2022 70% 21.05.22 NV
A0982.00. 4550.005 Positioning and installation of preseparator 1 Tag 06.05.2022 07.05.2022 30% 15.07.22 NV
A0982.00. 4550.017 Positioning and installation of pumps 1 Tag 07.05.2022 09.05.2022 70% 15.07.22 NV
A0982.00. 4550.016 Installation of modular component accessories 10 Tage 09.05.2022 20.05.2022 0% NV NV
A0982.00. 4550.013 Installation screens 3 Tage 20.05.2022 24.05.2022 100% 06.06.22 18.06.22
A0982.00. 4550.009 Installation of chutes for screens 4 Tage 24.05.2022 28.05.2022 100% 31.05.22 04.06.22
A0982.00. 4550.006 Connecting of air pipes 18 Tage 09.05.2022 30.05.2022 x 55% NV NV
A0982.00. 4550.007 Connecting of water pipes 18 Tage 09.05.2022 30.05.2022 15% 15.07.22 NV
A0982.00. 4550.903 Installation support structure for catwalk 9 Tage 30.05.2022 09.06.2022 90% NV NV
A0982.00. 4550.008 Installation of water injection system (nozzle lances) 4 Tage 09.06.2022 14.06.2022 0% NV NV

C:\Users\Daniel.Cervantes-Jan\Desktop\A0982 Ägypten Wotech\A0982 CW Weekly reports\2023\MW57-59 18.02.2023 CW07\A0982 Installations Site Report MW 59 - CW 07 2023.xlsx 8 / 11
A0982 Installations Site Report MW 59 - CW 07 2023.xlsx 20.02.2023

A0982.00. 4550.014 Installation of sensors 4 Tage 14.06.2022 18.06.2022 0% NV NV


A0982.00. 4550.097 Connecting pipes to WESP 24 Tage 09.05.2022 06.06.2022 50% 29.04..22 NV Start with duct installation top of roof (building )
A0982.00. 4900 Extraction system for Forming line, Trimming and DD-saw 54 Tage 11.07.2022 10.09.2022 x 62% NV NV
A0982.00. 4910.000 Positioning radials fan with drive for Forming line 2 Tage 11.07.2022 12.07.2022 25% 01.06.22 NV fan only placed
A0982.00. 4911.000 Positioning and assembly from filter unit 4 Tage 13.07.2022 16.07.2022 90% 18.07.22 NV Start pre assembling / installation
A0982.00. 4920.000 Positioning radials fan with drive for trimming and cross-cut 2 Tage 18.07.2022 19.07.2022 50% 18.07.22 NV fan only placed
A0982.00. 4946.000 Positioning radials fan with drive for rejected material 2 Tage 20.07.2022 21.07.2022 50% 01.06.22 NV fan only placed
A0982.00. 4947.000 Positioning and assembly from filter unit 4 Tage 22.07.2022 26.07.2022 80% 15.07.22 NV Start pre assembling / installation
A0982.00. 4949.090 Diverter flap on top of the Silo (7120) 2 Tage 27.07.2022 28.07.2022 50% 18.09.22 NV
A0982.00. 4970.000 Positioning radials fan with drive for diagonal saw 2 Tage 29.07.2022 30.07.2022 25% 15.07.22 NV
A0982.00. 4971.000 Positioning and assembly from round filter (DD- and trimming saw) 5 Tage 01.08.2022 05.08.2022 80% 15.08.22 NV
A0982.00. 4975.000 Positioning radials fan with drive 2 Tage 06.08.2022 08.08.2022 50% 01.06.22 NV fan only placed
A0982.00. 4976.000 Positioning and assembly from round filter 5 Tage 09.08.2022 13.08.2022 50% 20.08.22 NV
Customer Connection pipes and chutes (Steel structural, pipes, bends and flanges, chutes etc.) Buyer's scope 24 Tage 15.08.2022 10.09.2022 25% 01.06.22 NV Start with some ducts only - continues
Customer 4998.000 Radials fan with drive for press fume extraction 0 Tage 13.08.2022 13.08.2022 20% 15.07.22 NV fan only placed
Customer 4999.000 Radials fan with drive for cooling-turner fume extraction 0 Tage 13.08.2022 13.08.2022 20% 15.07.22 NV fan only placed
A0982.00. 5200 Cool- and stacking line 131 Tage 10.01.2022 10.06.2022 x 79% NV NV
A0982.00. Checking foundations and axes 2 Tage 10.01.2022 11.01.2022 100% 03.02.22 05.02.22
A0982.00. 5200.000 Steel structure in the pit for roller conveyor ready 0 Tage 11.01.2022 11.01.2022 100% 05.03.22 18.05.22 Steel construction unfinished delivered - onsite finializing
A0982.00. 5253.000 Support steel structure for cooling-turner 1 (Level and align) 2 Tage 12.01.2022 13.01.2022 100% 15.02.22 05.03.22
A0982.00. 5256.000 Support steel structure for cooling-turner 2 (Level and align) 2 Tage 14.01.2022 15.01.2022 100% 15.02.22 05.03.22
A0982.00. 5259.000 Support steel structure for cooling-turner 3 (Level and align) 2 Tage 17.01.2022 18.01.2022 100% 15.02.22 05.03.22
A0982.00. 5253.100 Setting the Cooling-turner-core 1 with bearings on steel structure and align 1 Tag 19.01.2022 19.01.2022 100% 14.03.22 10.04.22
A0982.00. 5256.100 Setting the Cooling-turner-core 2 with bearings on steel structure and align 1 Tag 20.01.2022 20.01.2022 100% 15.03.22 10.04.22
A0982.00. 5259.100 Setting the Cooling-turner-core 3 with bearings on steel structure and align 1 Tag 21.01.2022 21.01.2022 100% 16.03.22 10.04.22
A0982.00. 5253.000 Mounting Gear boxes with Servo drive (Alignment to gear wheel off cooling-turner 1) 2 Tage 22.01.2022 24.01.2022 80% 31.03.22 NV
A0982.00. 5256.000 Mounting Gear boxes with servo drive (Alignment to gear wheel off cooling-turner 2) 2 Tage 25.01.2022 26.01.2022 80% 31.03.22 NV
A0982.00. 5259.000 Mounting Gear boxes with servo drive (Alignment to gear wheel off cooling-turner 3) 2 Tage 27.01.2022 28.01.2022 80% 31.03.22 NV
A0982.00. 5252.000 Roller conveyor into cooling-turner 1 leveling and align (Infeed) 3 Tage 29.01.2022 01.02.2022 100% 16.03.22 NV
A0982.00. 5254.000 Roller conveyor into cooling-turner 1 (Level and align) 3 Tage 02.02.2022 04.02.2022 100% 16.03.22 04.06.22
A0982.00. 5255.000 Roller conveyor into cooling-turner 2 (Level and align) 3 Tage 05.02.2022 08.02.2022 100% 16.03.22 04.06.22
A0982.00. 5257.000 Roller conveyor into cooling-turner 2 (Level and align) 3 Tage 09.02.2022 11.02.2022 100% 16.03.22 04.06.22
A0982.00. 5258.000 Roller conveyor into cooling-turner 3 (Level and align) 3 Tage 12.02.2022 15.02.2022 100% 21.03.22 04.06.22
A0982.00. 5260.000 Roller conveyor into cooling-turner 3 leveling and align (Outfeed) 3 Tage 16.02.2022 18.02.2022 100% 21.03.22 04.06.22
A0982.00. 5253.200 Install Cooling-turner-arms (1) and align (Caution! - Pay close attention to the instructions of the supervisor) 12 Tage 19.02.2022 04.03.2022 0% 01.08.22 NV Arms are still not manufactured correct
A0982.00. 5256.200 Install Cooling-turner-arms (2) and align (Caution! - Pay close attention to the instructions of the supervisor) 12 Tage 05.03.2022 18.03.2022 x 50% 01.08.22 NV Arms are still not manufactured correct
A0982.00. 5259.200 Install Cooling-turner-arms (3) and align (Caution! - Pay close attention to the instructions of the supervisor) 12 Tage 19.03.2022 01.04.2022 x 80% 01.08.22 NV Arms are still not manufactured correct
A0982.00. 5250.000 Board pusher for cooling-turner 3 Tage 19.02.2022 22.02.2022 100% 28.03.22 10.04.22
A0982.00. 5269.100 Roller conveyor after cooling-turner 2 Tage 23.02.2022 24.02.2022 100% 28.03.22 10.04.22
A0982.00. 5269.200 Roller conveyor before stacking table 2 Tage 25.02.2022 26.02.2022 100% 22.03.22 10.04.22
A0982.00. 5270.000 Stacking table 4 Tage 28.02.2022 03.03.2022 70% 06.03.22 NV
A0982.00. 5271.100 Gripper carriage 11 Tage 04.03.2022 16.03.2022 70% 11.01.22 NV
A0982.00. 5271.200 Runway for gripper carriage 6 Tage 17.03.2022 23.03.2022 100% 23.02.22 14.03.22
A0982.00. 5293.000 Chain conveyor for masterboard stacks 3 Tage 24.03.2022 26.03.2022 0% NV NV
A0982.00. 5294.000 Chain conveyor for masterboard stacks 3 Tage 28.03.2022 30.03.2022 0% NV NV
A0982.00. 5211.000 Roller conveyor after ContiRoll-press outfeed 4 Tage 19.02.2022 23.02.2022 20% 18.02.23 NV
A0982.00. 5212.000 Longitudinal trimming saw with individually adjustable trimming units (assembling leveling and align 6 Tage 24.02.2022 02.03.2022 0% NV NV
A0982.00. 5216.000 Saw table for Multi-diagonal saw 4 Tage 03.03.2022 07.03.2022 0% NV NV
A0982.00. 5214.100 Multiple-diagonal saw 8 Tage 08.03.2022 16.03.2022 0% NV NV
A0982.00. 5214.700 Noise protected cabinet 11 Tage 17.03.2022 29.03.2022 0% NV NV
A0982.00. 5218.000 Thickness gauge 3 Tage 30.03.2022 01.04.2022 0% NV NV
A0982.00. 5219.000 Delamination detector 3 Tage 02.04.2022 05.04.2022 0% NV NV
A0982.00. 5217.000 Acceleration roller conveyor after Multi-diagonal saw 4 Tage 06.04.2022 09.04.2022 0% NV NV
A0982.00. 5221.000 Belt conveyor on raw board scale 4 Tage 11.04.2022 14.04.2022 0% NV NV
A0982.00. 5222.100 Raw board scale 4 Tage 15.04.2022 19.04.2022 0% NV NV
A0982.00. 5226.000 Stacking roller conveyor under reject board station 6 Tage 20.04.2022 26.04.2022 90% 03.06.33 NV
A0982.00. 5225.000 Reject board station 8 Tage 27.04.2022 05.05.2022 90% 04.06.22 NV
A0982.00. 5227.000 Roller conveyor for recject board station 4 Tage 06.05.2022 10.05.2022 90% 04.06.22 NV
A0982.00. 5200.040 Limit switches equipment 9 Tage 11.05.2022 20.05.2022 0% NV NV
Customer 5271.000 Installation support structure on Gripper carriage for catwalk 6 Tage 24.03.2022 30.03.2022 0% NV NV
A0982.00. 5200.040 Technical safety equipment (Cool- and stacking line) 18 Tage 21.05.2022 10.06.2022 0% NV NV
A0982.00. 5200.042 Safety fences for cool- and stacking line 12 Tage 21.05.2022 03.06.2022 0% NV NV
A0982.00. 5200.043 Safety equipment 6 Tage 04.06.2022 10.06.2022 0% NV NV
A0982.00. 5300 Storage system 63 Tage 01.03.2022 12.05.2022 x 22% NV NV

C:\Users\Daniel.Cervantes-Jan\Desktop\A0982 Ägypten Wotech\A0982 CW Weekly reports\2023\MW57-59 18.02.2023 CW07\A0982 Installations Site Report MW 59 - CW 07 2023.xlsx 9 / 11
A0982 Installations Site Report MW 59 - CW 07 2023.xlsx 20.02.2023

A0982.00. Checking foundations and axes 2 Tage 01.03.2022 02.03.2022 100% 03.02.22 05.02.22 Measuring control and marking is done
Customer 5390.000 Rails for storage system including grouting 30 Tage 03.03.2022 06.04.2022 38% NV NV
A0982.00. 5311.000 Base vehicle 3 Tage 07.04.2022 09.04.2022 60% 09.01.23 NV
A0982.00. 5312.000 Basic carriage SFG 1 4 Tage 11.04.2022 14.04.2022 0% NV NV
A0982.00. 5313.000 Basic carriage SFG 2 4 Tage 11.04.2022 14.04.2022 0% NV NV
A0982.00. 5390.100 Limit switches equipment 24 Tage 15.04.2022 12.05.2022 0% NV NV
A0982.00. 5300.040 Technical safety equipment (Storage system) 24 Tage 15.04.2022 12.05.2022 0% NV NV
A0982.00. 5300.042 Safety fences for storage 24 Tage 15.04.2022 12.05.2022 0% NV NV
A0982.00. 5300.043 Safety sensors 24 Tage 15.04.2022 12.05.2022 0% NV NV
A0982.00. 5400 Sanding line 49 Tage 07.04.2022 02.06.2022 x 80% NV NV
A0982.00. Checking foundations and axes 2 Tage 07.04.2022 08.04.2022 100% 03.02.22 05.02.22
Customer 5491.000 Rails for conveyor with fixing materials 7 Tage 09.04.2022 16.04.2022 0% 15.07.22 10.11.22
Customer 5492.000 Rails for conveyor with fixing materials 7 Tage 09.04.2022 16.04.2022 0% 15.07.22 10.11.22
A0982.00. 5442.100 Sanding machine system 7 Tage 09.04.2022 16.04.2022 95% 07.02.22 NV finial checking from Imeas open
A0982.00. 5443.000 Roller conveyor 2 Tage 18.04.2022 19.04.2022 100% 25.04.22 03.06.22
A0982.00. 5439.000 Roller conveyor 2 Tage 20.04.2022 21.04.2022 100% 25.04.22 31.05.22
A0982.00. 5447.000 Roller conveyor 2 Tage 22.04.2022 23.04.2022 100% 12.05.22 03.06.22
A0982.00. 5448.000 Roller conveyor 2 Tage 25.04.2022 26.04.2022 100% 12.05.22 03.06.22
A0982.00. 5445.000 Inspection station 3 Tage 22.04.2022 25.04.2022 100% 16.05.22 03.06.22
A0982.00. 5458.000 Board cleaning unit 3 Tage 27.04.2022 29.04.2022 70% 18.07.22 NV
A0982.00. 5452.100 Longitudinal saw 3 Tage 30.04.2022 03.05.2022 95% 10.05.22 NV
A0982.00. 5459.000 Roller conveyor 2 Tage 04.05.2022 05.05.2022 95% 30.05.22 NV
A0982.00. 5461.000 Feeding table 2 Tage 06.05.2022 07.05.2022 95% 22.05.22 NV
A0982.00. 5462.100 Cross-cut saw 9 Tage 06.05.2022 16.05.2022 95% 21.05.22 NV Grouting incorrect
A0982.00. 5465.000 Roller conveyor before angular station 4 Tage 17.05.2022 20.05.2022 90% 05.06.22 NV
A0982.00. 5466.000 Angular station 4 Tage 21.05.2022 25.05.2022 95% 05.06.22 NV
A0982.00. 5467.000 Roller conveyor 3 Tage 26.05.2022 28.05.2022 95% 07.06.22 NV
A0982.00. 5468.000 Board cleaning unit 2 Tage 30.05.2022 31.05.2022 90% 08.06.22 NV
A0982.00. 5469.000 Roller conveyor 2 Tage 01.06.2022 02.06.2022 90% 08.06.22 NV
A0982.00. 5441.000 Roller conveyor (upstream part of sanding machine) 3 Tage 18.04.2022 20.04.2022 100% 25.04.22 30.05.22
A0982.00. 5416.000 Stack roller conveyor with lifting platform and hydraulic 4 Tage 18.04.2022 21.04.2022 90% 21.03.22 NV
A0982.00. 5417.000 Roller conveyor 4 Tage 19.04.2022 22.04.2022 100% 11.04.22 20.05.22
A0982.00. 5419.000 Feeding station 2 Tage 21.04.2022 22.04.2022 100% 04.04.22 20.05.22
A0982.00. 5411(5412) Chain conveyor 2 Tage 23.04.2022 25.04.2022 100% 11.04.22 20.05.22
A0982.00. 5425.100 Suction carriage 7 Tage 23.04.2022 30.04.2022 95% 26.05.22 NV
A0982.00. 5425.200 Suction carriage track 7 Tage 23.04.2022 30.04.2022 100% 06.06.22 NV
A0982.00. 5470.000 Stack station under roller conveyor (3 pieces) 14 Tage 29.04.2022 14.05.2022 90% 21.06.22 NV
A0982.00. 5474/5473 Intermediate roller conveyor, stack conveyor discharge, stacking station 7 Tage 30.04.2022 07.05.2022 90% 21.06.22 NV
A0982.00. 5479/5478 Intermediate roller conveyor, stack conveyor discharge, stacking station 7 Tage 05.05.2022 13.05.2022 90% 21.06.22 NV
A0982.00. 5484/5483 Intermediate roller conveyor, stack conveyor discharge, stacking station 7 Tage 11.05.2022 19.05.2022 60% 21.06.22 NV
A0982.00. 5491.000 Transfer carriage- stack 4 Tage 19.05.2022 24.05.2022 80% NV NV
A0982.00. 5492.000 Transfer carriage- stack 4 Tage 19.05.2022 24.05.2022 80% NV NV
A0982.00. 5490.000 Protection board feeder 2 Tage 19.05.2022 21.05.2022 80% 15.07.22 NV
A0982.00. 5493.000 Stack chain conveyor 2 Tage 21.05.2022 24.05.2022 90% 15.07.22 NV
A0982.00. 5494.000 Stack roller conveyor 2 Tage 24.05.2022 26.05.2022 90% 15.07.22 NV
A0982.00. 5442.700 Noise protected cabin sanding machine 7 Tage 02.05.2022 09.05.2022 0% NV NV
A0982.00. 5452.700 Noise protected cabin Longitudinal saw 5 Tage 10.05.2022 14.05.2022 0% NV NV
A0982.00. 5462.700 Noise protected cabin Cross-cut saw 5 Tage 16.05.2022 20.05.2022 0% NV NV
A0982.00. 5400.100 Limit switches equipment 24 Tage 04.05.2022 31.05.2022 0% NV NV
Customer Installation of Service platforms at sanding line 24 Tage 04.05.2022 31.05.2022 0% NV NV
A0982.00. 5400.040 Technical safety equipment (Sanding line) 24 Tage 04.05.2022 31.05.2022 0% NV NV
A0982.00. 5400.042 Safety fences for sanding line 24 Tage 04.05.2022 31.05.2022 0% NV NV
A0982.00. 5400.043 Safety sensors 24 Tage 04.05.2022 31.05.2022 0% NV NV
A0982.00. 5700 Packing line 36 Tage 01.06.2022 12.07.2022 x 74% NV NV
A0982.00. Checking foundations and axes 2 Tage 01.06.2022 02.06.2022 x 100% 08.03.22 NV
A0982.00. 5711.000 Stack roller conveyor 3 Tage 03.06.2022 06.06.2022 x 100% 05.06.22 NV
A0982.00. 5725.000 Longitudinal strapping system 2 Tage 07.06.2022 08.06.2022 x 95% 05.06.22 NV
A0982.00. 5724.000 Stack chain conveyor 3 Tage 08.06.2022 10.06.2022 x 100% 05.06.22 NV
A0982.00. 5729.000 Stack chain conveyor 3 Tage 11.06.2022 14.06.2022 x 100% 05.06.22 NV
A0982.00. 5730.000 Cross strapping system 2 Tage 15.06.2022 16.06.2022 x 95% 05.06.22 NV
A0982.00. 5731.000 Stack chain conveyor 3 Tage 16.06.2022 18.06.2022 x 100% 05.06.22 NV
A0982.00. 5732.000 Stack chain conveyor 3 Tage 20.06.2022 22.06.2022 x 100% 05.06.22 NV
A0982.00. 5700.100 Limit switches equipment 20 Tage 20.06.2022 12.07.2022 x 100% 05.09.22 18.09.22
A0982.00. 5700.040 Technical safety equipment (Packing line) 20 Tage 20.06.2022 12.07.2022 0% NV NV

C:\Users\Daniel.Cervantes-Jan\Desktop\A0982 Ägypten Wotech\A0982 CW Weekly reports\2023\MW57-59 18.02.2023 CW07\A0982 Installations Site Report MW 59 - CW 07 2023.xlsx 10 / 11
A0982 Installations Site Report MW 59 - CW 07 2023.xlsx 20.02.2023

A0982.00. 5700.042 Safety fences for packing line 20 Tage 20.06.2022 12.07.2022 0% NV NV
A0982.00. 5700.043 Safety sensors 20 Tage 20.06.2022 12.07.2022 0% NV NV
A0982.00. 5900 Extraction system for Finishing line, sanding maschine, trimming saw at sanding line 54 Tage 26.05.2022 28.07.2022 x 65% NV NV
A0982.00. 5910.000 Positioning radials fan with drive for sanding machine 2 Tage 26.05.2022 28.05.2022 50% 15.07.22 NV
A0982.00. 5911.000 Positioning and assembly from filter unit 4 Tage 28.05.2022 02.06.2022 90% 01.08.22 NV
A0982.00. 5917.000 Positioning and assembly HP-rotary airlock with drive for Silo (7110) 4 Tage 02.06.2022 07.06.2022 20% 01.08.22 NV Only placed
A0982.00. 5918.000 Positioning and assembly from round filter (sanding dust) 6 Tage 07.06.2022 14.06.2022 55% 20.10.22 NV
A0982.00. 5920.000 Positioning radials fan with drive for cut-to-size 2 Tage 14.06.2022 16.06.2022 60% 01.08.22 NV
A0982.00. 5921.000 Positioning and assembly from round filter 6 Tage 16.06.2022 23.06.2022 85% NV NV
Customer Connection pipes and chutes (Steel structural, pipes, bends and flanges, chutes etc.) Buyer's scope 30 Tage 23.06.2022 28.07.2022 30% 01.06.22 NV Start with duct installation inside building
A0982.00. 7100 Silo extraction systems 79 Tage 16.04.2022 18.07.2022 x 40% NV NV
Customer Steel construction (Install the steelwork at the same time of group 2550) 0 Tage 16.04.2022 16.04.2022 0% NV NV Start with steel construction - continues
A0982.00. 7110.000 Sanding dust silo 11 Tage 16.04.2022 29.04.2022 80% NV NV Start with the walls segment - welding
A0982.00. 7110.100 Discharge device under the silo 4 Tage 16.04.2022 21.04.2022 30% NV NV
A0982.00. 7110.202 Components to the silo casing 3 Tage 21.04.2022 25.04.2022 0% NV NV
A0982.00. 7112.000 HP rotary airlock with drive 4 Tage 25.04.2022 29.04.2022 10% NV NV only placed
A0982.00. 7120.000 Reject fiber silo 7 Tage 29.04.2022 07.05.2022 70% 30.05.22 NV Pre assemling - segment parts - welding
A0982.00. 7120.100 Discharge device under the silo 4 Tage 29.04.2022 04.05.2022 60% NV NV
A0982.00. 7120.202 Components to the silo casing 3 Tage 04.05.2022 07.05.2022 0% NV NV
A0982.00. 7130.000 Saw dust silo 20 Tage 07.05.2022 31.05.2022 70% 15.07.22 NV Start with installation - continues
A0982.00. 7130.100 Discharge device under the silo 4 Tage 07.05.2022 12.05.2022 80% NV NV
A0982.00. 7130.202 Components to the silo casing 3 Tage 12.05.2022 16.05.2022 0% NV NV
A0982.00. 7131.020 Screw conveyor straw fibre 4 Tage 16.05.2022 20.05.2022 80% 03.08.22 NV
A0982.00. 7132.000 HP rotary airlock with drive 4 Tage 20.05.2022 25.05.2022 10% NV NV
A0982.00. 7136.000 Positioning and assembly from round filter 5 Tage 25.05.2022 31.05.2022 60% NV NV
A0982.00. 7140.000 Pulverizer silo 11 Tage 31.05.2022 13.06.2022 50% 01.05.22 NV Start with silo installation partly - continues
A0982.00. 7140.100 Discharge device under the silo 4 Tage 31.05.2022 04.06.2022 80% NV NV
A0982.00. 7140.202 Components to the silo casing 3 Tage 04.06.2022 08.06.2022 0% NV NV
A0982.00. 7141.000 HP rotary airlock with drive 4 Tage 08.06.2022 13.06.2022 0% NV NV
Customer Connection pipes and chutes (Steel structural, pipes, bends and flanges, chutes etc.) Buyer's scope 30 Tage 13.06.2022 18.07.2022 0% NV NV
A0982.00. 7300 (1.00399 - Wotech - EP - BÜTTNER-Schedule) 101 Tage 15.01.2022 12.05.2022 x 44% NV
Flue gas area incl. Cyclones only repairing works is ongoing
A0982.00. 7385.000 Combustion 101 Tage 15.01.2022 12.05.2022 x 55% 15.01.22 NV
because all parts duct etc . Incorrect installed
A0982.00. 7390.000 Thermal fluid system 80 Tage 03.02.2022 06.05.2022 x 47% 25.02.22 NV Start with pumps installation
A0982.00. 7390.000 Steam system 46 Tage 26.02.2022 20.04.2022 x 30% 21.04.22 NV
A0982.00. 7400 WESP 84 Tage 19.01.2022 11.05.2022 85% NV
A0982.00. 7410.000 Installation of wet electrostatic precipitator 84 Tage 19.01.2022 11.05.2022 x 85% 19.01.22 NV
A0982.00. 7500 Cooling water supply 23 Tage 21.04.2022 17.05.2022 0% NV NV
A0982.00. 7580.000 Positioning and assembly from Cooling unit 3 Tage 21.04.2022 23.04.2022 0% NV NV
Customer Connecting pipes to refiner motor and blenders 20 Tage 25.04.2022 17.05.2022 0% NV NV
A0982.00. 7600/7700 Explosion protection system and Spark detection 20 Tage 25.04.2022 17.05.2022 0% NV NV
A0982.00. 7601.000 Installation of explosion protection system for sifter, blenders, matformer, reject-mat etc. 10 Tage 25.04.2022 05.05.2022 0% NV NV
A0982.00. 7730.000 Installation of spark detection and extinguishing in the production process 10 Tage 30.04.2022 11.05.2022 1% NV NV
A0982.00. 7750.000 Installation of anti-clogging device for the cyclone 10 Tage 06.05.2022 17.05.2022 0% NV NV
A0982.00. 8000 Additional equipment (options) 0 Tage 18.08.2022 18.08.2022 0% NV NV
A0982.00. 8110.000 Standard lab equipment (Delivery components) 0 Tage 18.08.2022 18.08.2022 0% NV NV
A0982.00. 8110.001 Test machine 0 Tage 18.08.2022 18.08.2022 0% NV NV
A0982.00. 8110.002 Circular hand saw 0 Tage 18.08.2022 18.08.2022 0% NV NV
A0982.00. 8110.003 Circular table saw 0 Tage 18.08.2022 18.08.2022 0% NV NV
A0982.00. 8110.004 Precision scales 0 Tage 18.08.2022 18.08.2022 0% NV NV