You are on page 1of 37

The Report is Generated by DrillBit Plagiarism Detection Software

Submission Information

Author Name Doc 8


Title Doc 8
Paper/Submission ID 790880
Submission Date 2023-06-29 11:38:30
Total Pages 32
Document type Thesis

Result Information

Similarity 19 %
1 10 20 30 40 50 60 70 80 90

Sources Type Report Content

Student Quotes
Paper 0.74%
3.63%
Ref/Bib
Journal/ 0.8%
Publicatio
n 2.82% Internet
Words <
12.55%
14,
5.08%

Exclude Information

Quotes Not Excluded


References/Bibliography Not Excluded
Sources: Less than 14 Words Similarity Not Excluded
Excluded Source 0%
Excluded Phrases Not Excluded

A Unique QR Code use to View/Download/Share Pdf File


DrillBit Similarity Report

A-Satisfactory (0-10%)
B-Upgrade (11-40%)

19 35 B C-Poor (41-60%)
D-Unacceptable (61-100%)
SIMILARITY % MATCHED SOURCES GRADE

LOCATION MATCHED DOMAIN % SOURCE TYPE

1 docu.tips Internet Data


7

2 PRODUCT DEVELOPMENT LIFE CYCLE ICICI BANK BY Student Paper


2
19UE1E0019 Yr-2021 SUBMITTED TO JNTU

3 A STUDY ON EMPLOYEE AND EMPLOYER MOTIVATION AT Student Paper


2
KESORAM CEMENTS BY 18E41E0042, YR 2020, JNTUH

4 en.wikipedia.org Internet Data


1

5 www.creaform3d.com Internet Data


1

6 www.scribd.com Internet Data


1

7 www.ilo.org Publication
<1

8 www.publicartonline.org.uk Internet Data


<1

9 HIV testing intervention development among men who have sex with Publication
<1
men in the deve by Flowers-2017

10 docplayer.net Internet Data


<1

11 ve.org.za Internet Data


<1

12 biomedcentral.com Internet Data


<1

13 moam.info Internet Data


<1
14 Bringing Public Opinion and Electoral Politics Back In Explaining the Publication
<1
Fate of by Shoch-2008

15 www.industr.com Internet Data


<1

16 A STUDY ON HUMAN RESOURCES INFORMATION SYSTEM Student Paper


<1
WITH REFERENCE TO NTPC BY 18UE1E0084, YR 2020, JNTUH

17 www.eecs.ucf.edu Publication
<1

18 www.plm-conference.org Publication
<1

19 www.researchsquare.com Publication
<1

20 anotherangrywoman.com Internet Data


<1

21 educationdocbox.com Internet Data


<1

22 Gain optimization of a Kerr-lens mode-locked Crforsterite laser in the Publication


<1
CW regim by G-1997

23 How Should the Internal Structure of Personality Inventories Be Publication


<1
Evaluated by Hopwood-2010

24 repository.up.ac.za Publication
<1

25 us.socialdc.org Internet Data


<1

26 www.dx.doi.org Publication
<1

27 acc.com Internet Data


<1

28 apollo-wordvirus.blogspot.com Internet Data


<1

29 coek.info Internet Data


<1

30 documents.mx Internet Data


<1

31 dokumen.pub Internet Data


<1
32 index-of.es Publication
<1

33 Mercury Reduction at the Largest Municipal Incineration Facility in Publication


<1
North Americ by Nunes-2012

34 pt.scribd.com Internet Data


<1

35 www.dx.doi.org Publication
<1
15
and disposal, is known as product life cycle
management (PLM). Product lifecycle
management (PLM) acts as the "information
backbone" of a company by bridging the gap
between personnel, data, processes, and
CHAPTER-I other business systems.

INTRODUCTION
Product lifecycle management (PLM) differs
from product life cycle management
2
(PLCM) in that PLM is concerned with the
management of product descriptions and
properties throughout the product's
development and useful life, whereas PLCM
is concerned with the management of
4
business/commercial costs and sales
measures.
1
Product lifecycle management is one of the
four pillars of a company's IT
system.Managing a company's connections
to its clients, vendors, internal assets, and
strategic planning is known as customer
relationship management (CRM), supply
chain management (SCM), enterprise
resource planning (ERP), and systems
development life cycle (SDLC). Companies
engaged in manufacturing engineering have
the additional responsibility of developing,
describing, managing, and disseminating
product-related information.

One subset of PLM is people-oriented PLM.


People-centric PLM is at its best during the
INTRODUCTION design phase, as opposed to the release
Product lifecycle management: period when it has traditionally been
employed.
Management of a product's whole life cycle
from genesis to retirement, encompassing all Incorporating sensor data and real-time
phases of design, manufacturing, marketing, 'lifecycle event data' into PLM and making
1
10
this information available to different Primary sources include interviews with
players in the total lifecycle of a single employees and observations made in the
product (closing the information loop) has workplace.
been possible since 2011 (EU funded
PROMISE project 2004-2008). The result is Secondary sources include things like
an emerging field that builds on PLM: manuals, archives, brochures, books,
Closed Loop Lifecycle Management standards, the World Wide Web, and so on.
(CL2M). SCOPE In our inquiry, we focused only on
products manufactured by Kesoram
industries and made an attempt to get insight
INTEREST IN THE STUDY into the inner workings of the Fund
manager's workplace. The scope of the study
KESORAM Cement industrys Ltd. relies is limited to the kesoram firm, and it is
17
heavily on the Product Life Cycle to written from the point of view of a single
estimate when a product will reach its employee (the product life cycle comprises
growth stage. the stages at which the business may
Knowing how long development will take is manufacture the product).
important. ORIGIN OF DATA:
29
To be aware of how much time must pass The following sources provide the data
until the product reaches the promised point. needed for this project:
I need to know the marketing parameters for 31
All of these details are drawn from
launching a new product into the world secondary sources (1).
market.
The theoretical data is derived entirely from
Assess the level of excellence of various reliable resources.
products.
Third, we get much of our information about
the company's finances from the annual
Research Methods report.

Internet resources, books, and periodicals on


the topic of financial services and money, as
EXCEPTIONS TO THE STUDY'S
well as corporate brochures, have all RESULTS
contributed to my study.
The survey's given time is too short to get
Direct Experiences
useful responses from customers.
Differences between primary and secondary
sources.
2
The sample size is too little to make any
definitive statements.

Due to the project's portfolio structure or


other limitations, the data collected may not
be representative of the full picture. As a
30
result, products and management practices
may change over time in response to DISCUSSION OF PRIOR WORK
changing market conditions and competitive
1 Product lifecycle management has several
pressures, as well as to new developments
recognized benefits, one of which is a
and innovations in the field.
shorter time to market.

Identifying potential income sources and


sales possibilities in real time Better quality
overall Save money on prototypes Better
and quicker RFQ generation

Full engineering process integration, data


CHAPTER-II reuse, a framework for product
improvement, less waste, and lower costs
REVIEW OF LITERATURE will all contribute to a lower bottom line.

The Roles of PLM

PLM is broken down into the following five


areas: Product Architecture (CAx), Portfolio
and Product Management (PPM), and
Systems Engineering (SE) Managing the
Manufacturing Procedure (MPM)

Product Data Management (PDM)


12
Systems Engineering is concerned with
ensuring that all requirements, most
particularly those of the customer, are met
26
throughout the Systems Design process,
which involves all relevant disciplines.
Managing resources and keeping tabs on
24
how well they're being used is essential for
new product development projects that are
3
presently ongoing or in a holding period. processes, and stakeholders with whom they
Portfolio management may help interact. It is both a commercial practice and
management track the introduction of new a subdiscipline of computer science.
28
products and make difficult decisions about
2 For simplicity's sake, the phases have been
how to spend scarce funds. Information on a
product or service is gathered and kept put out in a traditional, sequential
during its entire existence, from engineering method. Key procedures are,
development to retirement. with specific order and responsibilities
dependent on product and industry:

Production planning Manufacture


uction Assembly Testing Service
n Specification Concept Design
Design Validation Analysis
tion Tool Design Realization

ds of Distribution, Use, Maintenance,


sposal

are the most crucial times:

erview, an Idea, an Action, a Hold on


pment, and a Leash

ality, however, is more complex;


ns seldom terminate suddenly and
es begin, and people and departments
unction in full isolation. The design
s is iterative and involves many
1
ns due to manufacturing constraints
or conflicting aims. Customer orders come
An Overview of the Growth Process into one of three categories with respect to
5 turnaround time: Build to buy, Engineered
The foundation of product lifecycle
to Order, and Assembled to Order.
management (PLM) is the creation and
centralization of all data relating to a History
product, together with the tools necessary to
access this data and the knowledge it After the success of the first Jeep Cherokee
provides. PLM is an area that evolved from (XJ), a small SUV that helped pave the way
CAD, CAM, and PDM, but it extends for today's SUVs, American Motors
beyond those three disciplines to include not Corporation (AMC) began working on what
just those disciplines but also the tools, would become the product lifecycle

4
management (PLM) system in 1985. This Although these broad classifications might
1
idea was sparked, according to François be useful, keep in mind that there is often
Castaing, Vice President for Product overlap between them and that many
Engineering and Development at AMC. software solutions cover more than one
Using a computer-aided design (CAD) topic. This data might be useful in the future
system to boost engineer productivity was since one of PLM's main features is
the first move the firm took toward speeding facilitating the simultaneous development of
13
up the product development process. The several products. The software in issue is
second part of this plan was a new just part of the puzzle; the people, processes,
communication system that centralized all and procedures that make up a business also
2
necessary paperwork and drawings, making play a role. Product portfolio management
it easier to quickly resolve differences and (PPM), in particular in regards to new
reducing the need for costly technical product introduction (NPI), is a marketing
revisions. After Chrysler took over AMC, a responsibility that falls under the umbrella
18 5
company-wide rollout of a product data of product lifecycle management (PLM).
management system was implemented to
Conception Is The First Step
better coordinate efforts across vehicle
development groups. Chrysler's early use of Imagine, choose out, sketch, and make
1
PLM technology resulted in development
costs that were 50% lower than the industry Identifying the requirements of consumers,
average by the mid-1990s, helping the enterprises, markets, and authorities is the
company rise to the position of lowest-cost first stage in generating an idea. The
manufacturer in its field. specification may be used to infer key
technological aspects of the product. The
Technology Infrastructure for Product first thoughts for the product's look and
Development central characteristics are produced in
Various software programs may now be combination with the requirements
4 specification. The practice of industrial
used to handle the various phases of a
design and style makes use of a wide range
product's life cycle. Instead of seeing PLM
of resources, from the traditional pencil and
as a one program, it should be seen as a
paper to more modern clay models and 3D
collection of tools used together to oversee
computer-aided industrial design (CAID)
the whole operation or handle certain
aspects of it. Some businesses provide a software.
whole PLM package, while others focus on Stage Two: Plan It Out
only one tool. Some programs can support a
broad variety of PLM-related domains since Verbs like "define," "outline," "create,"
they make use of different modules inside "try," "examine," and "verify"
the same data model. This page offers a
broad overview of PLM's several subfields.
5
From the prototype stage forward, through Realization, the Third Step
the pilot release, and finally the full release,
the product's ultimate physical look is Produce, assemble, gather, store, distribute,
carefully designed. Planned product and transport
retirement, redesign, and periodic upgrades The manufacturing process may be planned
to previously issued products may also be a after the product's components have been
part of this strategy. Computer-aided design developed. Tools, components, and CNC
(CAD) software is widely used in these 25
machining instructions are all things that
contexts. Everything from two-dimensional 1
may be designed and created with the use of
(2D) drafting and sketching to three- computer-aided design (CAD). Analytical
dimensional (3D) parametric modeling of tools allow for the simulation of a wide
solids and surfaces is fair game for this variety of manufacturing processes,
endeavor. Software in this area includes including casting, molding, and die press
1 14
tools like Hybrid Modeling, Reverse forming. Once a manufacturing strategy has
Engineering, KBE (Knowledge-Based been settled on, CPM may be put into
Engineering), NDT (Nondestructive testing), action. CAP/CAPP - (Production Planning)
and Assembly construction. software is used to design and simulate the
1 layout of factories, plants, and other
This stage encompasses all aspects of
engineering, including mechanical, facilities. Press-line simulation, industrial
electrical, electronic, software (embedded), ergonomics, and tool-selection management
and domain-specific fields like aerospace, are just a few. The manufactured part's
automotive, and so on. Analyzing the shape and dimensions are compared to the
product's components and how they fit original CAD data using Computer Aided
together is crucial to its design. CAE Inspection tools and software. In addition to
(Computer-aided engineering) software is the technical responsibilities, there will also
used for simulation, validation, and be activities related to sales product
optimization; it may be included with the configuration and marketing documentation.
2
CAD product or used separately. These One example is using a web-based sales
programs allow for the simulation of configurator or other Desktop Publishing
software to bring in engineering data (such
mechanical events, kinematics,
computational fluid dynamics, and finite as geometry and component list
information).
element analysis. One use of CAQ
(Computer-aided quality) is dimensional The Four Steps of Service
tolerance analysis in engineering. During
this stage, you'll also need to track down any Utilize, keep running, maintain, back up,
recently acquired components, a task that back out, retire, recycle, and dispose
may be done either manually or with the use
The lifecycle of a product ends with the
of specialized Procurement software.
management of its data while in use.
6
Customers and service providers are given Numerous Collaborative Product
resources on trash management and Development solutions cater to this
recycling to facilitate cleanup and important role throughout the product's life
maintenance. It's possible that we'll employ cycle and across various businesses. In order
MRO (Maintenance, Repair, and to accomplish this goal, a wide range of
Operations) software for this task. telecommunications, information, and
language translation tools are required.
Complete Product Lifespan Digital Mock-Up (DMU), Integral Virtual
Talk it over, set up a plan, then get to work Digital Prototyping (IVDP), and Photo
Realistic Imaging are all useful tools in this
None of the preceding steps may be seen field of Product visualization.
separately. Projects seldom progress in a
strictly linear way or independently from The User's Functional Understanding
other product development activities. There Initially, PLM solution-set technologies
is a continuous flow of information between were only utilized by professionals who had
several parties. One of PLM's most invested the time and effort necessary to
important functions is the coordination and become proficient in their usage (such as
management of data used to describe CAD, CAM, CAx...). Designers and
products. Document management, resource 4
engineers are experts with CAD systems,
and schedule planning, risk assessment, and while analysts, administrators, and managers
the monitoring of engineering changes and have mastered their respective support
component releases are all part of this technologies. However, in order to get the
process. most out of PLM, a big number of personnel
Bills of materials (BOMs) and other visual from across an extended firm with varying
21 skill sets must collaborate.
and written documentation are required for
these processes. This is the purview of PDM Though PLM systems have improved in
- (Product Data Management) software in recent years, it is still not feasible to cross-
engineering departments and EDM - train all personnel on each one. However,
(Enterprise Data Management) software at recent innovations have focused on making
the corporate level; however, the boundaries the PLM environment more intuitive for all
34
tend to blur, and most businesses utilize not parties. Customized user interfaces based on
just one, but two or more data management a person's "role" in the system is one
systems. The enterprise's SCM, CRM, and example. Users may get guidance according
9
ERP systems are linked to these as well.
to their responsibilities and skill sets via
These models are connected to PMSs
interfaces that can be modified.
(Project Management Systems) for use in
planning projects and programs.

Developmental strategies and processes


7
PLM is an evolution of several conventional Certain CAD applications allow for the
1
techniques. Together with PLM digital associative replication of geometry across
engineering methods, they have been files. The tooling designer, for instance, may
enhanced to aid companies in accomplishing now easily import an existing component
their goals, such as reducing product design into their own files. Before the final
development times and manufacturing design freeze, the manufacturing engineer
expenses. Because of the time advantage, may begin working on tools; any changes to
being first to market with a product is the design's dimensions or shape will need a
crucial for growing market share and revision to the tool geometry. Concurrent
income. engineering has the benefit of reducing the
chance of costly design adjustments at a
Industrial design, bottom-up design, top- later stage because of improved and more
down design, front-loading design, fast communication across departments.
concurrent engineering, and so on are all Conventional sequential engineering focuses
examples of such approaches.
on fixing and redesigning problems as they
Digital simulation engineering; requirement- happen; preemptive engineering seeks to
driven design; specification-managed eliminate potential problems in advance.
validation; design for Create a blueprint for success
manufacture/assembly; design for Six Sigma
(DFSS) in NPD; modular design; context Bottom-up design (CAD Centric) involves
design; design for manufacture/assembly; developing the product's constituent
elements before defining its overall shape
Engineering applications of parallel and form in three dimensions. The final
processing product is built digitally after many tiers of
A concurrent engineering (or simultaneous sub-assembly design are completed
engineering, in British English) method does digitally. This is the intended methodology
not follow a traditional phase-by-phase for evaluating the product's success. While
progression. A good example of this is when "bulk items" like paint, glue, oil, and other
an engineer jumps right into the detail similar substances aren't often included in
design of a product with the creation of solid the BOM, they may be required to finish the
models before the concept design surface product. Despite their size and number,
models are finished. The time it takes to bulky items are often neglected when it
bring a product to market is decreased, but comes to geometry modeling.
the number of personnel required to execute
Bottom-up design often uses solutions that
the project is not reduced. The 3D solid
make the most efficient use of current
model and the 2D drawing may be kept in physical technologies. When these ideas are
different files, but the drawing can read the really put to use, bottom-up design may be
data from the model in real time with the 2
more successful than top-down. The risk
help of feature-based CAD solutions.
8
1
with bottom-up design is that it will lead to subsystems. It may take many cycles of this
efficient solutions for trivial problems. In assembly to identify the placement and
the former, designers seek to answer the primary dimensions of individual elements,
1
question, "What is the most valuable thing depending on the complexity of the product.
to do?" whereas in the latter, they seek to This information is then linked back to the
answer the question, "What can we do most original documents. These files provide the
efficiently with this technology?" foundation for conventional top-down
building by detailing each component.
Top-down development of structure.
The assembly's hierarchical, top-down
In a top-down approach, the focus is on the design is sometimes called a "control
system's overall functionality rather than its structure." When the review's fundamental
implementation details. In order to go from a structure is defined in a single document,
high-level specification to the level of actual this is known as a skeleton file.
27
implementation, it is broken down into more
granular structures and specifications. A top- The military sector has always used a top-
down strategy runs the risk of ignoring the down method of developing new products.
most efficient use of current hardware and The system engineering method requires
physical technologies. Poor performance functionally dissecting requirements and
and extra layers of lower-level abstraction then physically assigning product structure
might result from a Top-Down model's to the functions. This top-down approach to
adoption of an abstraction path that isn't well CAD data typically results in bottom-up
35 1
suited to the state of the art in physical-level production of the product's lower tiers.
technology. The value of a top-down
approach to design resides in the fact that it It's like taking "both ends against the
maintains focus where it belongs: on the middle"
requirements of the optimal solution. Both-Ends-Against-The-Middle (BEATM)
The risks associated with Top-Down design design is a strategy that combines top-down
might be mitigated with a Part-Centric and bottom-up methods to design. An new
variation. The layout model is predicated on technology that offers potentially useful
a 2D design that includes approximate ideas might serve as the jumping-off point
dimensions and a handful of critical for a BEATM design process flow, or a top-
features. The creative ideas of industrial down view of a key problem that needs a
designers are integral to the manufacturing solution could serve as the jumping-off
point. One of the most distinctive
process. Associative copying is then used to
characteristics of the BEATM design
reduce the amount of detail in the geometry
representing the product's multiple method is that it gives equal weight to both
subsystems. Lower-level granularity is the solution requirements at the top and the
defined by using the geometry of accessible technology at the bottom, which
together may hold the promise of an
9
efficient solution at the bottom. The need to be redirected to "offline"
BEATM design process operates in both development teams. It's somewhat similar to
ways, from top-down requirements to creating a concept automobile to test out
bottom-up efficient execution. This shows fresh ideas for a vehicle, except that here,
that BEATM incorporates the best features the work is implemented immediately.
of both methods. Instinctive, unconscious
Creation in context
implementations of the BEATM approach
have aided both top-down and bottom-up The components can't be built
accomplishments. The advantages of using independently. Models of product
BEATM on purpose are significantly subassemblies are created in CAD; CAiD as
amplified. a standard part of the design cycle. To do
this, we use techniques from assembly
modeling. The CAD program allows for the
Preliminary stages of manufacturing geometry of related parts to be seen and
planning and execution referred to. It's possible that the geometry of
other subassembly pieces was imported
Front loading is a technological from another CPD format rather than being
advancement in the top-down design constructed in the same way. DMU and
paradigm. The whole review and control other kinds of assemblies are also tested
structure, as well as downstream data like using product visualization software.
drawings, tool development, and CAM
models, are constructed before the product is Complete process and procedure lifecycle
defined or the project is allowed to begin. management (PPLM).
23
These compiled files may be used as a
starting point for creating many different Product and process lifecycle management
types of products. When an alternative (PPLM) is a specialization of PLM that
11 treats the production process and the
product is chosen, its parameters are added
to the master model, and all supplementary finished good as equally important. These
data is updated. Existing associative models are the typical consumer bases for products
12
are certain to have some gaps, hence further in the health sciences and upscale specialty
work is required. The underlying concept is chemical industries. The manufacturing
that there has already been a great deal of procedure utilized to generate the chemical
experimental and exploratory work done. in issue is one of the most crucial aspects of
a new medicine application. Thus,
These templates provide a variety of data
that might be useful for next endeavors. traditional PLM addresses data relating to
While this may need more money "up product development, but PPLM seeks to
handle data relevant to process development
front," it may get a project off the ground
32 in the same manner.
much more quickly. But to put these plans
into action, substantial technical resources

10
Major Players in Business (quality, training, corrective
action/preventive action), Omnify
Estimates vary widely amongst market Software's PLM helps firms in all sectors
research publications, but the yearly budget satisfy regulatory compliance standards.
for PLM software and services is likely over There are other web-based PLM solution
$15 billion. The rate of market growth is providers besides Centric Software that cater
expected to hit 10% this year. to companies that make apparel, footwear,
Over 15% of revenue comes from EDA and and consumer-goods brands.
high-end MCAD, with AEC, low-end Independent PLM solution providers
MCAD, and PDM all contributing over including Satyam, Atos Origin, Sopheon,
10%. The group of CAE cases that are over
and Capgemini provide consultancy and
5% is also interesting. However, system integration services for PLM,
advancements in sectors like collaborative assisting firms in the discovery, design,
PDM and visualization are anticipated. implementation, and operation of relevant
In this section, we identify the top five PLM practices, processes, and technologies.
software providers in terms of yearly Some companies whose main source of
revenue that contribute in the PLM process. income is not PLM software yet attribute
Dassault Systems ($1.7B), Siemens PLM some of it to PLM software include SAP
Software (previously UGS) ($1.4B), PTC ($11B), SSA Global ($2B), Oracle
($1.0B), Agile Software Corporation (now Corporation ($3B), and Autodesk ($1.5B).
part of Oracle Corporation) ($.011B), and Other major players in this market include
SofTech, Inc. ($.011B) are only few of the Satyam, Atos Origin, IBM ($88.9B), EDS
main software vendors that meet most PLM ($19.8B), NEC ($45B), Accenture, Infosys
demands. For instance, two software (INFY), Geometric, L&T InfoTech, Tata
providers with relatively small market caps Consultancy Services (TCS), ITC InfoTech,
are MSC Software ($0.3 billion) and Altair CSM Software, Wrench Solutions,
Engineering ($0.15 billion). Some Cambridge Solutions(An Xchanging
businesses, like Aras Corp, provide SaaS Company), and Tata Technologies.
(software as a service) models, while others Together, Dassault system and Geometric
sell open source corporate PLM solutions
developed their own PLM system they call
developed on Microsoft's platform.
3DPLM.
KnowledgeBench's web-based PLM
technologies are used in the pharmaceutical The emergence of the CAD and PDM
and food & beverage sectors. For instance, market has resulted in the proliferation of
Selerant serves the process industry similar organizations. If you're looking for a
exclusively by providing formulation full list of these firms, see List of CAD
improvement and regulatory management. Companies instead.
Integrating previously siloed processes

11
DESCRIPTION OF SECTOR
CHAPTER-III
3

INDUSTRY PROFILE
&
COMPANY PROFILE

D.C. SYSTEM :

The clinker manufacturing process is a vital part


of the cement production cycle. The production
of clinker for BIRLA SUPREME/GOLD is managed
entirely by a computerised system. The DCS
keeps a close eye on everything and makes sure
everything is running well. As a result, the grade
of the Clinker produced is standardised and
never varies.

12
Kesoram has strengthened the country as a
whole by dispersing 18 million tonnes of
cement over it over the years. No one else in
Andhra Pradesh has this characteristic to the
same extent. Two projects that utilised only
Kesoram Cement that were financed by the
16
illustrious World Bank are the Ramagundam
Super Thermal Power Project of NTPC and
3
the Mannair Dam of the Pochampad project
in AP.

PHYSICAL CHARACTERISTICS

18 MILLION TONS OF ROCK-


STEADY BASEMENT:

Due to its superior quality, construction may


Keeping the upper hand for almost a quarter
be very exact. The Birlas supreme-gold 53
of a century is just as impressive. Infact.
grade cement, in particular, maximises
Almost 28 years ago, Kesoram became
strength while minimising cement and water
synonymous with.
consumption in the water-cement ratio.

13
Kesoram gets several extra benefits: All of the product's quality systems in
production and distribution have been
100%+ Utilisation Rate Just two of approved by B.I.S. in accordance with ISO
Kesoram's numerous noteworthy 9002/1S 14002.
achievements are its increased production
and reduced energy use. It has won several The first plant, with 2.5 lakhs TPA (tones
awards at the national and state levels, per year) capacity, was built at Basanthnagar
attesting to its excellence. in 1969. It was warmed and under little
monitoring.A second plant was constructed
in 1971, doubling output to 2 lakhs TPA.

The capacity of the facility was increased


up to 9 lakhs in August 1978, 1.13 lakhs in
January 1981, and 0.87 lakhs in September

Kesoram has always tried to strike a good


All of Kesoram's quality systems are I.S.O. middle ground between cutting-edge
9001 and ISO 4002 approved, attesting to research and profitable business operations.
the company's commitment to producing The company has a spotless record during
products that are acceptable across the its 27 years in operation.
world.

14
The production process of Kesoram Cement company provides a dispensar manned by
makes use of cutting-edge technology, doctors and other medical specialists for the
including cutting-edge equipment and comfort of its employees. Participants in ESI
cutting-edge computerised control. The must utilise the ESI hospital for any medical
plant is overseen by a team of dedicated care needs.Employees take part in a wide
experts in their field. range of athletic competitions on
Independence Day (August 15) and
We have more stringent quality controls Republic Day (January 26).
than the government of India mandates. The
following materials are used to make As a result of these efficiency upgrades,
cement: power consumption has dropped from 113
units per tonne of cement produced in 2016
Limestone, or a stone formed of lime to 108 units in 2017. The area's captive
Iron ore gypsum bauxite hematite power plant has continued to operate
reliably. In 2017, 84,000,000 kWh were
8
About two hundred thousand trees have generated. In order to keep energy costs
been planted by this department as part of its manageable, this captive power plant is
3
environmental and social obligations.To important.Management has launched a
accomplish its social responsibility, this series of HRD training and education
division has adopted 10 adjacent villages programmes in an effort to boost employee
33
and set up a family welfare campus, surgical output.The region has installed a reliable air
camps, animal health camps, blood donation pollution control system and equipment, and
camps, children immunisation camps, seeds, it uses an environment management system
training for farmers, etc. modelled after ISO 14001.

Two theatres were constructed for leisure Kesoram Cement has been a leader in
use, providing venues for indoor sports, productivity, technology, and environmental
cultural activities, and artistic pursuits preservation since 1984, and as a result, the
including theatre, music, and dance. company has earned scores of awards at
22 both the state and federal levels. Some
Libraries and other places to study have
illustrious awards are listed below.
been made possible thanks to corporate
funding. There are perhaps a thousand books AWARDS OF KESORAM CEMENT:
in the library. Numerous newspapers and
periodicals may be found in the area.The
corporation maintains a cafeteria equipped
with food and drink for its employees.We
provide a school where both English and
Telugu are taught so that everyone's
educational requirements may be met.The

15
16
of financial and sales data. An item's "life
cycle" consists of the following four
assertions: a limited time frame in which to
sell the goods; distinct challenges,
opportunities, and problems for the seller at
each stage of the sales process;

In order to maximise profits at each stage of


a product's life cycle, a different strategy for
marketing, finance, manufacturing,
sourcing, and staffing is required.

The different stages in a product life cycle are:

The product development cycle is a time-


consuming process that requires several
abilities and assets. Product life management
(PLM) is the process of keeping track of a
product's traits and characteristics while it is
developed and put into use, while product
life cycle (PLC) refers to the length of time
a product is available on the market in terms
17
Exception Request

A Request for Deviation (RFD) is made


before production begins in order to deviate
from a defined procedure, such as a
specification, drawing, or other document,
for a limited quantity or duration of time.

Finding Your Target Audience

18
&
INTERPRETATION

DATA ANALYSIS AND


INTERPRETATION
FOR ORGANIZATION

CHAPTER-IV
DATA ANALYSIS

19
employees says that it will take the weeks of
time , 3% of the of the employees says that it
will take the years of time .

Interpretation: From the data collected it is


observed that 87% of the Data on new products
will be displayed, 10% of the data use for hide
and 3 % of the data use for if required.

20
Interpretation:
6
It is observed that 95% of the people
feel that the R&D is affordable, and 5% of
people feel that the R&D of service is not
affordable.

21
Interpretation: From the data collected it is
observed that 87% of the employees says that it
will take the months of time , 10% of the of the
employees says that it will take the weeks of
Interpretation: From the data collected it is
time , 3% of the of the employees says that it
observed that 55% of the employees says that
will take the years of time .
Modify, 44% of the of the employees says that
it will start new , 1% of the of the employees
says that stop the project .

22
23
Interpretation:

It is observed that 85% of the people


feel that the price of service is affordable, and
15% of people feel that the price of service is
not affordable.

24
25
Interpretation:

From the survey conducted


satisfied level at service center
show at X-axis and No. Respondents
at Y-axis. 7 % of the consumers said Interpretation:
excellent, 61% said good and 24%
It is observed that 81% of the
and 8% of the consumers said ok
respondents are satisfied with service
and poor.
26
given by their and 19% are not satisfied
with service given by there self.

CONCLUSIONS 1) Most employees


surveyed had a favourable impression of the
New product introduction procedure.

2) The outcomes have met with their


approval.

19
Thirdly, employees were hopeful that they
CHAPTER-V would be able to advance in their current
positions.

FINDINGS & 4) Everyone in the organisation is pleased


with Production's current state.
SUGGESTIONS 5. Everyone at the firm is pleased with the
way things are running.

Sixth, the company's internal


communication system is well-liked by its
employees.

Therefore, R&D may help a worker improve


their abilities.

8) The boss has determined how happy the


employee is with the organisation.
27
According to employees (8), there was no Seven) The organisation should prioritise
office politics. avoiding political involvement above
everything else..
They make significant contributions to their
companies, which often manifest in positive
employee relations, the tracking of
employee growth, and the development of
novel products.It seems like KESORAM
INDUSTRIES Ltd. is succeeding in its
efforts to maintain a contented workforce.

SUGGESTIONS 1) The organisation has to


put more resources into the roles that
programmers play in the creation of new
products.

2) The organisation should provide every


employee more possibilities to advance in
their field.

Thirdly, management should try to improve


staff collaboration.

4) The top management of the company has


to make better internal communication a top
priority.

In order to aid workers in their professional


development, management should put a
higher priority on the performance
evaluation process.

Management should also focus on Demand


methods (6th point).

28
29
30
BIBLIOGRAPHY

BOOKS

1. Security analysis and portfolio management - Fischer & Jordan

2. Financial Management - Prasanna Chandra

3. Financial Management - M.Y. Khan

NEWS PAPERS
31
1. Business to day
2. Economic times.
3. Times of India
4. Business line
MAGAZINES

1. The week
2. India today
WEBSITES.

1. www.Kesoram.com
2. www.nyse.com
3. www.google.com

32

You might also like