1. 3 Welder Qualification
ASME Section IX,
ASME IX WPQR C A A
WPS,Drawing,Welding Map
sheet 1 of 4
ATTACHMENT - 1
sheet 2 of 4
ATTACHMENT - 1
2.2 Foundation
a.Levelness Visual
b.Center Point & Radius Levelness, Centerpoint
c.Flatness & Slope Drawing, Tolerance, Client Spec API 650 C A A
Flatness & Orientation Report
d.Orientation
e.Anchor Bolt & Etc
2.3 Visual Check after welding for each parts Approved Drawing, Weld Map .API 650 API 650 Welding Control Record C A A
sheet 3 of 4
ATTACHMENT - 1
3.1 Finishing
Client Spec, Drawing S.O.P Client Spec, Drawing S.O.P Pickling & Pasivation
a.Cleaning
C A A
3.2 Punch List Client Spec, Drawing S.O.P Client Spec, Drawing S.O.P Punch List Report
3.3 Manufacturing Data Report ( MDR ) Client Spec, Drawing Client Spec, Drawing MDR C A A
Note : Abbrevation
1. Complete operation must be sign off and dated ITTU = Indoteknik Tjandra Utama A = APRIL
C = CONTRACTOR
RAPP = PT.RIAU ANDALAN PULP & PAPER
sheet 4 of 4