Professional Documents
Culture Documents
Prd-Wi-02 Core Making
Prd-Wi-02 Core Making
GA/PRD/WI/02
Rev No. 00
WORK INSTRUCTION Date. 01.10.2018
Page 1 of 3
TITLE: CORE MAKING
A. GENERAL:-
1. Check the core making plan & identify core box as per part no.
2. Handle / store the core boxes in such a way that they do not get damaged /
distorted.
3. Inspect the cores before giving for use in production.
4. Inform pattern shop in-charge in case of damage of core box & get it repaired.
5. Take safety precautions like wearing hand–gloves if work is in resin sand.
6. Scrap the rejected cores.
7. Keep performance record.
8. Maintain housekeeping & discipline.
PREPARED BY PRD
SUPERVISOR APPROVED BY CEO
Doc No. GA/PRD/WI/02
Rev No. 00
WORK INSTRUCTION Date. 01.10.2018
Page 2 of 3
TITLE: CORE MAKING
PREPARED BY PRD
SUPERVISOR APPROVED BY CEO
Doc No. GA/PRD/WI/02
Rev No. 00
WORK INSTRUCTION Date. 01.10.2018
Page 3 of 3
TITLE: CORE MAKING
PREPARED BY PRD
SUPERVISOR APPROVED BY CEO