Professional Documents
Culture Documents
Using QC story
approach
10/27/22 1
1.Introduction
CELL :- 1109 AXLE ASSEMBLY
CUSTOMER :- TATA MOTORS LTD. (CVBU-PUNE)
PRODUCT :- REAR AXLE
10/27/22 2
1.1 Problem Definition
Leakage
10/27/22 3
1.2 Effect of Problem
10/27/22 4
1.3 Selection of Problem
Plant: Pune TATA MOTORS CVBU DOMESTICS ANALYSIS Model:1109
REPORTING DATE:01.04.08
10 9
8
6
No.of complaint
6
4
4
0
Sep-07 Oct-07 Nov-07
Month
Total Vehicle production quantity =3266 Nos. (From Sept 07 to Nov 07)
10/27/22 5
RSB STARTED AXLE SUPPLY FROM MAY 2007, Warranty Complains
come after 7 to 8 Months of rolling out of Vehicles
1.4 Process Mapping of HUB ASSY.
Operation 1: REAR HUB WASHING
THEME : Eliminate Complaints due to Leakage from Rear Hub oil seal.
TARGET: Zero
10/27/22 7
1.6 TEAM
SR.ENGINEER
Leader
Men Machine
Machine Measurement 12
3.3 Potential causes listing & validation
S.
NO M'S CAUSE REMARK
GREESE PARAMETER NOT OK After checking at laboratory, parameters found with in specification.
ALIGNMENT OF DOLLEY & BASE PLATE
NOT OK R/O found 0.01MM (Specification=0.02MM)
2 METHOD
IMPROPER PRESSING OF OIL SEAL Pressed hub oil seal parallelism found 0 .014-MM (Spec=0.02MM)
EXESSIVE GRESSING IN HUB & BEARINGS Weight M/C used for hub greasing and m/c used for bearing greasing
PERSONAL PRPBLEM NO PERSONAL PROBLEM
LACK OF EXPERIENCE VERIFY TRAINING RECORD FOUND SUITABLE
3 MEN
INADEQUTE TRAINING VERIFY SKILL MATRIX FOUND SUITABLE
LOW MOTIVATION MOTIVATED
HYRAULIC PRESSURE LOW VERIFY DAILY M/C MAINTAINCE CHECK LIST FOUND OK
POOR MAINTAINCE NO FREQUENT BREAKDOWNS AS PER B.D REPORT
4 MACHINE
OLD MACHINES NEW MACHINES
FREQUENT BREAKDOWNS NO FRQUENT BREAKDOWNS AS PER P.M DONE
INADEQUTE MEASUREMENTS GUAGE R& R CONDUCTED & LESS THAN 10%
5 MEASUREMENT
INADEQUTE INSTRUNMENTS ALL INSTRUNMENTS ARE AVILABLE
13
10/27/22
3.4 Cause Validation
1. Collect data for Rear hub.
2. Collect data for Oil seal .
3. Collect data for Pressure ring.
10/27/22 14
3.4.1 Cause Validation
RESULT: REAR HUB (Only Major dimension checked) DATE:06.04.2008
10/27/22 15
All dimensions are in MM.
3.4.2 Cause Validation
RESULT: PRESSURE RING (Only Major dimension checked) DATE:06.04.2008
10/27/22 18
3.4.5 Data collection & analysis
Before After
10/27/22 22
5.1 Effect of Action
23
10/27/22
6.Standardization
AT RSB:
INSPECTION
Oil seal inspection introduced at incoming inspection stage.
HORIZONTAL DEPLOYMENT:
For Pinion oil seal, lip contact checking gauge will be made.
24
10/27/22
7.Cummulative Learning
10/27/22 25
8. Tools Used.
7
Diagram
Check
sheet QC Tools
10/27/22 26
THANK YOU
10/27/22 27