Ref: EM-58/19 QUOTATION 20-Apr-19

Attention:
Safan
Master piece labor camp

Subject: Quotation for Road Line Marking

As per your enquiry and Site visit, we would like to submitt our best price for the above
mentioned project.

Our Offer
Our offer for the above said Project shall be TWO HUNDRED SIXTY THOUSAND AND SEVEN
HUNDRED AND EIGHTY Qatari riyal only(260700.00 QAR). Offer will be strictly based on the
BOQ Attached along with the Quotation and subjected to sub -contract agreement/LPO.

Project Duration
1. There will be a mobilization period of 3 days from the date of receiving the first payment.
2. Project will be completed within 30 days from the date of starting the work.

Terms and Conditions

1. Our offer is strictly based on the BOQ attached ( approximate amount), any deviation from the
BOQ will be considered as the variation and separate bill will be submitted. Detailed BOQ with
correct quantity of materials will be submitted later
2. All drawings and documents related with the project will be Eminent General Contracting WLL
3. All approval will be Under the scope of client
4. All documents required for the gate pass and work permit will be submitted by the Eminent
General Contracting WLL and necessary supports will be given by the Client
5. Electricity and water will be Under the scope of Client
6. Material Storage and waste dumping area designated by Client
7. This quotation includes the rate for line marking on the road only, for the signage boards
separate quotation will be submitted
Payment Terms
1. Advance payment : 70% of the total amount
2. After Successful Completion of Work : 30 % of the total amount
CR NO: 126711 Tel: +974 3300 6232, 7762 8000 info@eminentqatar.com
Office NO: 302, Near Crazy Signal, Mannai Tower, B-Ring Road, Doha _ www.eminentqatar.com
Item Description Unit Qty Rate Total

Item No: 1

Site Management and Documentation

Allow for submission of all the


DRAWINGS related with the above said
(a)
project and completed as per the
direction of Engineer in charge.
Lot
Allow for all the safety equipments
required at the site and PPE required for
(b)
the site personels and completed as per
the direction of Engineer in charge

Item No: 2
Allow for the cleaning of the surface as
per the work requirement and as per the
site condition by using the brush and
(a)
water pump provided all the electricity
and water provided by the client and
completed as per the direction of
Engineer
Allow for in
thecharge.
supply and application of
one coat of primer in the cleaned surface Lot
(b)
and completed as per the direction of
Engineer in charge.

Allow for the supply and application of


two coats of paint as per the site
©
condition and completed as per the
direction of Engineer in charge
Allow for the supply and lying of
necessary signages in the road and
(d)
completed as per the direction of
Engineer in charge

CR NO: 126711 Tel: +974 3300 6232, 7762 8000 info@eminentqatar.com


Office NO: 302, Near Crazy Signal, Mannai Tower, B-Ring Road, Doha _ www.eminentqatar.com
Allow for the supply and lying of Signage
boards as per the design and site
requirement and completed as per the
direction of Engineer in charge
Total 260700.00

We hope that above price and BOQ is in lane with your requirement and if any clarification
required about the proposed BOQ and Quotation, please feel free to contact Mr Aneesh.

Thanks and Best Regards


ANEESH CHANDRAN
BUSINESS MANAGER
Eminent General Contracting and Services