SGD SAIPEM CAMP ACCOMODATION AND BUILDING FACILITIES
JOB SAFETY ANALYSIS
JSA NO. 003 Page 1 of 1 PROJECT OPERATIONAL CAMP Activity: Painting work Date 07/01/2013
Steps Hazards Control Measures to be Enforced Remarks / Actions
Painting Work Inhalation Fumes, vapors Properly ventilate work area, use disposable Supervisor and gases generated during respirators. use. Burns due to Hot surface of Drip trays shall be used to avoid any leakage of painting paint stripper, contact with liquids. paint stripper element Minimum quantity of the paint shall be store at the site. Electric shocks due to All painting material shall be stored at well ventilated improper operational & areas. maintenance. All painting material shall be used as per manufacturer’s provided material safety data sheets. All painting activities shall be carried out by experienced workers. All operatives of paints shall be explained the hazards & their precaution associated with the paints. All workers shall be fully equipped with safety shoes, hand gloves, hard helmet, face shield & cover-alls. Washing facility shall be available to wash the effected parts of the body by paints.