cells 19.80m as length of bridge axix. Foundation type- raft 450mm thick Clear height of box- 4m Basic Information Clear distance between side walls- 6m Side wall thickness-450mm Foot path width- 0.6m Grade of concrete- M25 Clear cover-25mm
Foundation work and side wall
Progress on site so far concreting up to 1m was completed.
Concreting of side walls was going on at
site. Slump test is required. Before concreting reinforcement was Verticality of form work checked. must be checked before Line, level, plumb and supports of concreting. formwork was checked. Form oil should be used Concreting of side walls Cover blocks were checked and added instead of mobile. where necessary. Safety gear is required. Position of tie rods were checked. Before concreting all surfaces were cleaned and cement sand slurry was applied. Grade of concrete used was M25. Proper vibration was done with needle vibrator. 6 no.s of concrete cubes were prepared at different phase of concreting. Social Aspect: Active participation of female for construction work. LOCAL ROADS BRIDGE PROGRAMME [ LRBP ] Government of Nepal (DoLIDAR) in collaboration with Swiss Agency for Development and Cooperation
SOME PICTURES OF SITE VISI
Fig: Adding cover block. Fig: Checking verticality of side wall.