Project: JGC PENTHOUSE JOB SAFETY &BLDG.

EXTENSION ENVIRONMENTAL ANALYSIS


Tools WORKSHEET
and or Equipment required: JSA No: 1
Job Location & Details: Transportation of loads ( Rough Terrain Cranes) Crane, rigging equipment, Date Prepared:
JSA Participants: Outrigger pads, construction
materials Approved by: HSE Manager
Responsible Supervisor:
Date:

JOB STEP HAZARDS IDENTIFIED CONTROLS REQUIRED (Eg. Remove overhead cable or ACTION BY/RECORD
(Eg. Electrocution from isolate/sheath overhead or monitor with spotter) Training PPE
(Eg. Set Up Crane) (Eg. Supervisor)
11Kv Cables) Needs

Transportation of Loads Strong windy conditions 1. Prior to lifting and movement of materials ensure All works to be monitored
causing crane instability, that it is within the crane’s capacity for the and supervised at all
Uneven and soft ground configuration. (Radius chart, crane manual times by Engineer,
conditions causing crane familiarization) Superintendent,
instability. Sudden 2. Check tire pressure and tire condition ( refer Supervisor, Safety
movement of load striking manual recommendation) Engineer
banks man interface 3. Banks-man to sling and escort load
personnel, tire explosion 4. Where practical secure load to crane to prevent
due to wear incorrect tire unnecessary movement.
pressure, electrical shock, 5. Check reverse beeper and flashing lights
contact with overhead 6. Where practical extend outriggers for additional
power lines. Contact with stability protection.
personnel when reversing 7. Always reverse down incline when carrying
loads.
8. Where practical always keep crane on level
operating surface
9. Operator to wear seat belt at all times
10. Check for overhead power lines
11. Ensure lifting equipment is suitable for task
12. Check all weight lifting gauges
13. Check anti 2 block is working.
14. Monitor windy conditions at all times

PICMW INC.