REPLY TO CONSULTANT'S COMMENTS

Sr. No. Comments Reply to Consultant's Comments Dhabi

PFA HVAC and architectural drawings along


Clarify the location for each unit and confirm the
with the locations below. Vendor to confirm if
1 size and dimension can be accommodated based on Drawings to be submitted by the contractor the CCU units can be accommodated.
approved plan

Provided detail sequence of operation showing all


Please refer to Annexure-1 for the attached
2 scenario for single unit and for set of unit for each
Sequence of operation for the DX CCU units.
space

The proposed unit used on raised floor area The units need to be used on raised floor. Vendor to
3 To be confirmed by the contractor confirm compatibility.
contractor confirm the same

Re-arrange the compliance statement as highlighted


4 Comply
on the submittal
Proposed Units are manufactured in Italy as per
5 Comply with ASHRAE 52.1
European standards
Please refer to Section 17 for the Draft Warranty
6 Submit draft warranty letter
Certificate

7 Structure frame should be 14 gauge Comply

Please refer to the selection data sheet in Section 4


for the indoor & outdoor unit noise level. Moreover,
8 Clarify the overall noise level
the units have electronically commutated ( EC )
motors delivering low noise level smooth operation

9 Confirm equipment heat dissipation by specialist By Contractor Complied. Attached letter from ATLAS.
Confirm if one compressor out of service the other
10 compressor will be working and the unit provide Comply
50% of total load
11 Provide static pressure calculation Pressure drop on the perforated tile will be given by
Dhabi. Vendor to select the equipment.
12 Provide coordination layout showing actual Noted. Will be provided as a separate submittal
unit dimension, MEP connection