2 / 19 DECEMBER 2001
1 GENERAL 3
2 SAFETY CLASSIFICATION 3
3 CONSTRUCTION PLAN 3
3.1 General 3
3.2 Design bases 4
3.3 Construction materials 4
3.4 Coatings 4
3.5 Structural analysis and dimensioning 5
3.6 Drawings 5
3.7 Inspection programme 5
3.7.1 General 5
3.7.2 Inspection and testing plan 5
3.7.3 Inspection and testing procedures 6
3.8 Type test results and type-approved products 6
3.9 Procedure qualification and work tests 6
3.10 Manufacturing procedures 7
3.11 Description of manufacturer and testing organisation 7
4 CONTROL OF MANUFACTURING 7
5 CONSTRUCTION INSPECTION 7
6 COMMISSIONING INSPECTION 8
7 CONTROL DURING PLANT OPERATION 8
8 MODIFICATIONS AND REPAIRS 8
9 REFERENCES 8
3
STUK GUIDE YVL 4.2 / 19 DECEMBER 2001
inspections and tests required to verify their shall be considered in the design of nuclear pow-
quality level are adequate considering any item’s er plants in accordance with Guide YVL 2.6.
safety significance.
Prior to the start of manufacturing of Safety 3.3 Construction materials
Class 2 or 3 steel structures, the licensee shall When choice is made between construction mate-
submit the construction plan to STUK for ap- rials, the operating and environmental conditions
proval in accordance with Guide YVL 1.2. STUK of the steel structure as well as requirements
may, at its discretion and at the licensee’s re- and restrictions resulting from manufacturing
quest, delegate the review of a Safety Class 3 and testing shall be considered.
steel structure’s construction plan to an inspec- In the construction material report or draw-
tion organisation approved to perform inspec- ings, the following shall be presented for the dif-
tions in accordance with Guide YVL 1.3. ferent parts of the steel structure
The construction plan for a steel structure • standard marking and type of base material
shall present and welding consumables in accordance with
• design bases the applicable standard
• construction materials • method of fabrication, delivery condition and
• coatings type of material certificate for base materials
• structural analysis and dimensioning in accordance with standard SFS EN 10 204
• drawings [11]
• inspection programme • grounds for the choice of construction mate-
• type test results and type-approved products rial, where necessary.
plus products in accordance with certified
product declarations 3.4 Coatings
• procedure qualification and work tests Under accident conditions, coatings of steel struc-
• manufacturing procedures tures and components inside the containment
• description of manufacturer and testing or- are subjected to loads deviating essentially from
ganisations. loads during normal operation. The coatings used
shall be such that they will not have an unfa-
Steel structures shall fulfil the requirements and vourable effect on accident management. The li-
directions of RakMK [4]. If these are insufficient, censee shall demonstrate i.a. that coatings would
also foreign regulations, guidelines and stand- not flake off to an extent which would block flow
ards may be proposed to be applied. paths and endanger core coolability or removal
of residual heat. In addition, it shall be demon-
3.2 Design bases strated that under accident conditions, potential
As design data, all essential factors affecting the chemical changes in coating material do not cre-
durability and functioning of a steel structure ate new risk factors.
shall be presented. They include i.a. The licensee shall present how the require-
• loads ments on the coatings of steel structures inside
• corrosion resistance the containment are met, including
• accessibility for inspections and testing dur- • radiation resistance
ing operation • decontaminability
• the effects of ageing. • chemical resistance
• durability under operating conditions
The design data of steel structures shall be based • durability under postulated accident condi-
on requirements for systems and ambient condi- tions
tions, as given in the Safety Analysis Report and • fire technical properties.
in Safety Analyses.
Requirements on safety analyses are given The inspection programme shall present meth-
in Guides YVL 2.2 and YVL 2.8. Seismic events ods for verifying how coating materials, coating
4
GUIDE YVL 4.2 / 19 DECEMBER 2001 STUK
5
STUK GUIDE YVL 4.2 / 19 DECEMBER 2001
The plan shall be drawn up such that it inspection or testing. As to details, a reference to
shows applicable standards can be made.
• component or weld-specific identification data The procedures shall cover the destructive
and references to steel structure drawings testing of materials with relevant material cer-
• markings in accordance with the standard tificate and control requirements, the methods
applied in the manufacturing of construction of fabrication, non-destructive testing as well as
and welding consumables as well as the nec- the testing (e.g. leakage and functional tests) and
essary references to material specifications inspection of the final product.
• weld-specific references to the welding proce-
dures and, where necessary, to the procedure 3.8 Type test results and type-
and work tests conducted to qualify these pro- approved products
cedures To demonstrate the acceptability of structural
• the detailed tests and inspections to be con- solutions, the licensee shall present a summary
ducted on a steel structure assembly as well of the techniques and results of mock-up or full
as its components and welds; and a reference scale tests that may have been conducted earlier.
to the testing or inspection instructions. Where necessary, STUK or a STUK-approved
inspection organisation may in their decision
If the inspections and tests of a component or require type tests if there are special grounds
a weld are carried out during more than one justifying them.
manufacturing phase, whether they are repeated The Finnish building regulations (RakMk)
in part or completely, they shall be presented as [4] allow the use of products that have either
separate inspections (e.g. a radiographic testing type-approval granted by the Ministry of the
of the weld root, or an ultrasonic testing of a weld Environment, a European Technical Approval
prior to and after heat treatment). (ETA), or certified product declarations given by
If procedure qualification or work tests are organisations authorised by the Ministry of the
needed to qualify the manufacturing procedures, Environment. The products shall be used in ac-
a separate inspection plan shall be presented for cordance with the relevant decision of approval
them, the contents of which are determined by and the associated manufacturer’s instructions.
the above principles. A separate plan is required The acceptability of the products onsite shall be
also when the properties of construction materi- separately authenticated should there be any
als or welds are changed during manufacturing reason to believe that a product does not cor-
such that the facts given in the construction ma- respond to the type approval decision. In case
terial report do not apply any more. installation is not included in the type approval
The following shall be evident from the in- decision, installation instructions shall be drawn
spections and tests marked in the plan: in whose up that cover installation quality control.
premises they take place and who (manufacturer, Type approval decisions pertaining to type-
subcontractor, approved testing or inspection or- approved products shall be submitted to STUK
ganisation, installer) carries them out; should a for information.
report be written on these inspections; and who The suitability of a CE marked product for
supervises the inspection or testing. its purpose shall be presented in the construc-
tion plan. No separate approval is needed if a CE
3.7.3 Inspection and testing procedures marked product is used in accordance with its
The licensee shall present the testing and inspec- CE approval.
tion procedures that apply to the material tests
of steel structures. In addition, testing and in- 3.9 Procedure qualification and work tests
spection procedures shall be given that apply to Procedure and work tests shall be determined
the manufacturing and installation of steel struc- based on a steel structure’s safety class and how
tures. The instructions shall include the method, demanding the structure is. Potential test speci-
scope, acceptance criteria and reporting of the mens shall correspond to the final structure. The
6
GUIDE YVL 4.2 / 19 DECEMBER 2001 STUK
acceptability of the final structural properties quality inspection of other types of anchorages or
and the qualification of the company to manufac- supports shall be provided as an attachment to
ture the structure shall be shown by procedure the construction plan.
qualification tests. For approval of a procedure
qualification pertaining to Safety Class 3 struc- 3.11 Description of manufacturer
tures, it is sufficient that the manufacturing and testing organisation
method is known and conforms to the standard For assurance of reliable operation, manufac-
applied. turer and subcontractor shall have sufficient
Work tests refer to weld or weld group and experience for implementation of the steelwork;
coating specific tests made by competent weld- competent personnel; and a functional quali-
ers during the manufacturing of the structure, ty management system. The description of the
or prior to it. At least the most demanding welds manufacturer and subcontractors shall indicate
shall be subjected to work tests. that they can fulfil these requirements.
Work tests are valid as long as manufacturing, The qualifications of testing organisations
as based on them, takes place within the range of shall be presented in the description. The re-
essential parameters, e.g. for welding, base mate- quirements, approval procedures and control of
rial, filler material and welding process. Work operation of testing organisations and testing
tests are valid for a fixed period and they are personnel conducting non-destructive testing are
welder, structure, weld or coating specific. described in Guide YVL 1.3.
Welder qualifications shall be established in STUK’s approval is not needed for testing
accordance with standard SFS-EN 287-1 [12]. organisations and testing personnel conducting
The scope of STUK’s control of procedure destructive tests but the organisations shall have
qualification and work tests is according to Guide relevant accreditation.
YVL 1.14.
7
STUK GUIDE YVL 4.2 / 19 DECEMBER 2001
Welds are inspected before the application of Detailed inspection instructions shall be
coating on steel surfaces. Construction inspection drawn up, with the below information on each
is addressed in Guide YVL 1.15. inspection and testing
Type-approved products [4] are not subject • responsible organisation
to construction inspection. In so far as type-ap- • plant operational state during inspection or
proval is not valid, in the installation of a product testing
for example, construction inspection is carried • dates and intervals
out as presented above. • methods and arrangements
• documentation
• acceptance criteria.
6 Commissioning
inspection STUK controls periodic inspections in the extent
it considers necessary. The licensee shall notify
Prior to their commissioning, steel structures are STUK of the periodic inspections of Safety Class
subject to a commissioning inspection by STUK. 2 and 3 steel structures into which STUK has in-
A steel structure’s commissioning inspection formed its inspectors will participate. In addition,
is performed after STUK periodically inspects steel structures in
• the structure’s construction plan has been approved accordance with its own inspection programme.
• the structure’s installation on final location
has been done
• the structure has passed its construction in- 8 Modifications
spection.
and repairs
For the commissioning inspection, the below in- Requirements for the repair and modification of
formation shall be provided steel structures in an operating nuclear power
• approved construction and installation plan plant are given in Guide YVL 1.8.
plus a clarification of the fulfilment of the con-
ditions of approval in the relevant decision
• original construction inspection protocols with 9 References
attachments. 1. The Nuclear Energy Act (990/1987).
2. The Nuclear Energy Decree (161/1988).
A steel structure may be commissioned after it 3. Government Resolution on the general re-
has been approved in a commissioning inspection quirements for nuclear power plant safety
conducted by STUK. (395/1991).
4. The Finnish Building Regulations, RakMK.
5. The Chemicals Act (744/1989).
7 Control during 6. The Chemicals Decree (675/1993).