You are on page 1of 14

BCT LINE

MAINTENANCE
LAGOS
AIRCRAFT DAILY TALLY SHEET

A/C REG : 5N-BQS DATE: 05/03/2022 TIME: 14:00 STATION : LOS

COMPANY: BCT ENG NAME : ISSUED BY: BELI

OPEN ADD’S
ADD # DESCRIPTION MEL REF DUE DATE CAT

WORK REQUIRED PR ACTION TAKEN MHs


1 DAILY CHECK 1

2 PLEASE RECORD IN THE FIELD ABOVE ALL OPEN 1


ADDs.

3 CHECK FOR THE PRESENCE OF SPARE LOGBOOK 1


IN THE AIRCRAFT.

4 CHECK THE CABIN LOG BOOK 1

5 STORAGE BATTERY REPLACEMENT 1


APL/BQS/19/026

ENGINEERS SHIFT LEADER


NAME STAMP SIGN: NAME STAMP SIGN:

PR=Priority 1-AOG, must be done 2-Normal work within 3-To be carried out if
due expiry or limitation expected man hours time available
BCT LINE
MAINTENANCE
LAGOS
AIRCRAFT DAILY TALLY SHEET

A/C REG : 5N-BQR DATE: 05/03/2022 TIME: 14:00 STATION : LOS

COMPANY: BCT ENG NAME : ISSUED BY: BELI

OPEN ADD’S
ADD # DESCRIPTION MEL REF DUE DATE CAT

WORK REQUIRED PR ACTION TAKEN MHs


1 DAILY CHECK 1

2 PLEASE RECORD IN THE FIELD ABOVE ALL OPEN 1


ADDs.

3 CHECK FOR THE PRESENCE OF SPARE LOGBOOK 1


IN THE AIRCRAFT.

4 CHECK THE CABIN LOG BOOK 1

5 APL/BQR/19/028, ENG #1 VIBRATION EXCEEDENCE 1


MAKE ENTRY IN TECH LOG.

6 WO APL/BQR/19/029 HEAT EXCHANGER CLEANING 1

ENGINEERS SHIFT LEADER


NAME STAMP SIGN: NAME STAMP SIGN:

PR=Priority 1-AOG, must be done 2-Normal work within 3-To be carried out if
due expiry or limitation expected man hours time available
BCT LINE
MAINTENANCE
LAGOS
AIRCRAFT DAILY TALLY SHEET

A/C REG : 5N-BQQ DATE: 05/03/2022 TIME: 14:00 STATION : LOS

COMPANY: BCT ENG NAME : ISSUED BY: BELI

OPEN ADD’S
ADD # DESCRIPTION MEL REF DUE DATE CAT

WORK REQUIRED PR ACTION TAKEN MHs


1 DAILY CHECK 1

2 PLEASE RECORD IN THE FIELD ABOVE ALL OPEN 1


ADDs.

3 CHECK FOR THE PRESENCE OF SPARE LOGBOOK 1


IN THE AIRCRAFT.

4 CHECK THE CABIN LOG BOOK 1

5 CHECK WITH AERO AND POSTION AIRCRAFT 1


AT THE RAMP AFTER FLAPS INSPECTION TASK
COMPLETION.

ENGINEERS SHIFT LEADER


NAME STAMP SIGN: NAME STAMP SIGN:

PR=Priority 1-AOG, must be done 2-Normal work within 3-To be carried out if
due expiry or limitation expected man hours time available
BCT LINE
MAINTENANCE
LAGOS
AIRCRAFT DAILY TALLY SHEET

A/C REG : 5N-BRN DATE: 05/03/2022 TIME: 14:00 STATION : LOS

COMPANY: BCT ENG NAME : ISSUED BY: BELI

OPEN ADD’S
ADD # DESCRIPTION MEL REF DUE DATE CAT

WORK REQUIRED PR ACTION TAKEN MHs


1 DAILY CHECK 1

2 PLEASE RECORD IN THE FIELD ABOVE ALL OPEN 1


ADDs.

3 CHECK FOR THE PRESENCE OF SPARE LOGBOOK 1


IN THE AIRCRAFT.

4 CHECK THE CABIN LOG BOOK 1

5 T/S ADD 182 ENGINE #1 ANTI ICE INOP 1

ENGINEERS SHIFT LEADER


NAME STAMP SIGN: NAME STAMP SIGN:

PR=Priority 1-AOG, must be done 2-Normal work within 3-To be carried out if
due expiry or limitation expected man hours time available
BCT LINE
MAINTENANCE
LAGOS
AIRCRAFT DAILY TALLY SHEET

A/C REG : 5N-BUJ DATE: 05/03/2022 TIME: 14:00 STATION : LOS

COMPANY: BCT ENG NAME : ISSUED BY: BELI

OPEN ADD’S
ADD # DESCRIPTION MEL REF DUE DATE CAT

WORK REQUIRED PR ACTION TAKEN MHs


1 DAILY CHECK 1

2 PLEASE RECORD IN THE FIELD ABOVE ALL OPEN 1


ADDs.

3 CHECK FOR THE PRESENCE OF SPARE LOGBOOK 1


IN THE AIRCRAFT.

4 CHECK THE CABIN LOG BOOK 1

ENGINEERS SHIFT LEADER


NAME STAMP SIGN: NAME STAMP SIGN:

PR=Priority 1-AOG, must be done 2-Normal work within 3-To be carried out if
due expiry or limitation expected man hours time available
BCT LINE
MAINTENANCE
LAGOS
AIRCRAFT DAILY TALLY SHEET

A/C REG : 5N-BQO DATE: 05/03/2022 TIME: 14:00 STATION : LOS

COMPANY: BCT ENG NAME : ISSUED BY: BELI

OPEN ADD’S
ADD # DESCRIPTION MEL REF DUE DATE CAT

WORK REQUIRED PR ACTION TAKEN MHs


1 DAILY CHECK 1

2 PLEASE RECORD IN THE FIELD ABOVE ALL OPEN 1


ADDs.

3 CHECK FOR THE PRESENCE OF SPARE LOGBOOK 1


IN THE AIRCRAFT.

4 CHECK THE CABIN LOG BOOK 1

ENGINEERS SHIFT LEADER


NAME STAMP SIGN: NAME STAMP SIGN:

PR=Priority 1-AOG, must be done 2-Normal work within 3-To be carried out if
due expiry or limitation expected man hours time available
BCT LINE
MAINTENANCE
LAGOS
AIRCRAFT DAILY TALLY SHEET

A/C REG : 5N-BQP DATE: 05/03/2022 TIME: 14:00 STATION : LOS

COMPANY: BCT ENG NAME : ISSUED BY: BELI

OPEN ADD’S
ADD # DESCRIPTION MEL REF DUE DATE CAT

WORK REQUIRED PR ACTION TAKEN MHs


1 DAILY CHECK 1

2 PLEASE RECORD IN THE FIELD ABOVE ALL OPEN 1


ADDs.

3 CHECK FOR THE PRESENCE OF SPARE LOGBOOK 1


IN THE AIRCRAFT.

4 CHECK THE CABIN LOG BOOK 1

ENGINEERS SHIFT LEADER


NAME STAMP SIGN: NAME STAMP SIGN:

PR=Priority 1-AOG, must be done 2-Normal work within 3-To be carried out if
due expiry or limitation expected man hours time available
BCT LINE
MAINTENANCE
LAGOS
AIRCRAFT DAILY TALLY SHEET

A/C REG : 5N-BQU DATE: 05/03/2022 TIME: 14:00 STATION : LOS

COMPANY: BCT ENG NAME : ISSUED BY: BELI

OPEN ADD’S
ADD # DESCRIPTION MEL REF DUE DATE CAT

WORK REQUIRED PR ACTION TAKEN MHs


1 DAILY CHECK 1

2 PLEASE RECORD IN THE FIELD ABOVE ALL OPEN 1


ADDs.

3 CHECK FOR THE PRESENCE OF SPARE LOGBOOK 1


IN THE AIRCRAFT.

4 CHECK THE CABIN LOG BOOK 1

5 T/S ADD151 APU BLEED INOP 1

6 FLIGHT HOURS CORRECTION 1

7 MAKE ENTRY IN TECH LOG FOR THE COMPLETED 1


TASK FOR FLAPS INSPECTION FROM AERO

ENGINEERS SHIFT LEADER


NAME STAMP SIGN: NAME STAMP SIGN:

PR=Priority 1-AOG, must be done 2-Normal work within 3-To be carried out if
due expiry or limitation expected man hours time available
BCT LINE
MAINTENANCE
LAGOS
AIRCRAFT DAILY TALLY SHEET

A/C REG : 5N-BQV DATE: 05/03/2022 TIME: 14:00 STATION : LOS

COMPANY: BCT ENG NAME : ISSUED BY: BELI

OPEN ADD’S
ADD # DESCRIPTION MEL REF DUE DATE CAT

WORK REQUIRED PR ACTION TAKEN MHs


1 DAILY CHECK 1

2 PLEASE RECORD IN THE FIELD ABOVE ALL OPEN 1


ADDs.

3 CHECK FOR THE PRESENCE OF SPARE LOGBOOK 1


IN THE AIRCRAFT.

4 CHECK THE CABIN LOG BOOK 1

ENGINEERS SHIFT LEADER


NAME STAMP SIGN: NAME STAMP SIGN:

PR=Priority 1-AOG, must be done 2-Normal work within 3-To be carried out if
due expiry or limitation expected man hours time available
BCT LINE
MAINTENANCE
LAGOS
AIRCRAFT DAILY TALLY SHEET

A/C REG : 5N-BUQ DATE: 05/03/2022 TIME: 14:00 STATION : LOS

COMPANY: BCT ENG NAME : ISSUED BY: BELI

OPEN ADD’S
ADD # DESCRIPTION MEL REF DUE DATE CAT

WORK REQUIRED PR ACTION TAKEN MHs


1 DAILY CHECK 1

2 PLEASE RECORD IN THE FIELD ABOVE ALL OPEN 1


ADDs.

3 CHECK FOR THE PRESENCE OF SPARE LOGBOOK 1


IN THE AIRCRAFT.

4 CHECK THE CABIN LOG BOOK 1

ENGINEERS SHIFT LEADER


NAME STAMP SIGN: NAME STAMP SIGN:

PR=Priority 1-AOG, must be done 2-Normal work within 3-To be carried out if
due expiry or limitation expected man hours time available
BCT LINE
MAINTENANCE
LAGOS
AIRCRAFT DAILY TALLY SHEET

A/C REG : 5N-BUO DATE: 05/03/2022 TIME: 14:00 STATION : LOS

COMPANY: BCT ENG NAME : ISSUED BY: BELI

OPEN ADD’S
ADD # DESCRIPTION MEL REF DUE DATE CAT

WORK REQUIRED PR ACTION TAKEN MHs


1 DAILY CHECK 1

2 PLEASE RECORD IN THE FIELD ABOVE ALL OPEN 1


ADDs.

3 CHECK FOR THE PRESENCE OF SPARE LOGBOOK 1


IN THE AIRCRAFT.

4 CHECK THE CABIN LOG BOOK 1

5 ADD098, BLOCKING VALVE SOLENOID INOP, 1


ENG#1 HYD PUMP SWITCH OFF FUNCTION INOP
T/S
6 ADD 097 SEAT 14D BROKEN 1

7 ADD 099 L/H OUTB LDG LT 1

8 FLIGHT HOURS CORRECTION 1

ENGINEERS SHIFT LEADER


NAME STAMP SIGN: NAME STAMP SIGN:

PR=Priority 1-AOG, must be done 2-Normal work within 3-To be carried out if
due expiry or limitation expected man hours time available
BCT LINE
MAINTENANCE
LAGOS
AIRCRAFT DAILY TALLY SHEET

A/C REG : 5N-BQT DATE: 05/03/2022 TIME: 14:00 STATION : LOS

COMPANY: BCT ENG NAME : ISSUED BY: BELI

OPEN ADD’S
ADD # DESCRIPTION MEL REF DUE DATE CAT

WORK REQUIRED PR ACTION TAKEN MHs


1 LINE CHECK 1 N/A

2 PLEASE RECORD IN THE FIELD ABOVE ALL OPEN 1


ADDs.

3 CHECK FOR THE PRESENCE OF SPARE LOGBOOK 1


IN THE AIRCRAFT.

4 CHECK THE CABIN LOG BOOK 1

ENGINEERS SHIFT LEADER


NAME STAMP SIGN: NAME STAMP SIGN:

PR=Priority 1-AOG, must be done 2-Normal work within 3-To be carried out if
due expiry or limitation expected man hours time available
BCT LINE
MAINTENANCE
LAGOS
AIRCRAFT DAILY TALLY SHEET

A/C REG : 5N-BUK DATE: 05/03/2022 TIME: 14:00 STATION : LOS

COMPANY: BCT ENG NAME: ISSUED BY: BELI

OPEN ADD’S
ADD # DESCRIPTION MEL REF DUE DATE CAT

WORK REQUIRED PR ACTION TAKEN MHs


1 DAILY CHECK 1

2 PLEASE RECORD IN THE FIELD ABOVE ALL OPEN 1


ADDs.

3 CHECK FOR THE PRESENCE OF SPARE LOGBOOK 1


IN THE AIRCRAFT.

4 CHECK THE CABIN LOG BOOK 1

5 WO APL/BUK/19/016, TAKEOFF WARNING SYSTEM 1


TEST

ENGINEERS SHIFT LEADER


NAME STAMP SIGN: NAME STAMP SIGN:

PR=Priority 1-AOG, must be done 2-Normal work within 3-To be carried out if
due expiry or limitation expected man hours time available
BCT LINE
MAINTENANCE
LAGOS
AIRCRAFT DAILY TALLY SHEET

A/C REG : 5N-BUL DATE: 05/03/2022 TIME: 14:00 STATION : LOS

COMPANY: BCT ENG NAME: ISSUED BY: BELI

OPEN ADD’S
ADD # DESCRIPTION MEL REF DUE DATE CAT

WORK REQUIRED PR ACTION TAKEN MHs


1 DAILY CHECK 1

2 PLEASE RECORD IN THE FIELD ABOVE ALL OPEN 1


ADDs.

3 CHECK FOR THE PRESENCE OF SPARE LOGBOOK 1


IN THE AIRCRAFT.

4 CHECK THE CABIN LOG BOOK 1

5 WO APL/BUL/19/018 HEAT EXCHANGER CLEANING 1

6 ARMREST BETWEEN 8B AND 8C BROKEN OFF 1


ADD056, PLEASE REPLACE OR REPAIR.

7 AD2018-18-13, FLAPS INSPECTION POSTION AFCT 1


AT AERO SIDE

8 LEFT OUTBOARD LANDING LIGHT INOP T/S 1


ENGINEERS SHIFT LEADER
NAME STAMP SIGN: NAME STAMP SIGN:

PR=Priority 1-AOG, must be done 2-Normal work within 3-To be carried out if
due expiry or limitation expected man hours time available

You might also like