HSSE INSPECTION REPORT

Report#: HSSE-SAK-JED-0001 Consultant: SAK CONSULTANTS Severity Rating (SR) / Timetable


Date: 12TH June 2022 Contractor: LEVELS CONTRACTING CO. Extremely High - E Immediate
Client: SAUDI ENTERTAINMENT VENTURES Prepared By: ABDURRAHMAN SHOAIB High - H 24 Hours
Project: SEVEN – OBHOR, JEDDAH Moderate - M 3 days
Low - L 5 days
SAK requests to show the items on the report closed out section within the specified timescales, where
not immediately possible interim measures should be introduced with a timescale agreed upon for full Failure to rectify identified HSE observations may result in
rectification. issuing a Notice of Noncompliance with HSE Regulations &
Work Stoppage and/or monetary penalties.

CONSULTANT CONTRACTOR RESPONSE:


Log Requirement /
Observation Photo Rectification: Insert Evidence Photo:
# S.R Recommendation
1. Equipment working at the H The contractor’s safety The equipment at the
site without proper officer shall ensure that all site have been assured
documents & TUV. equipment entering the site with the proper
should be checked & documents
informed of all documents.

Submit TUV certificates

Location: Site area Closed Out Date:14th June


2022
2. Equipment working at the H Submit TUV certificates The equipment at the
site without TUV site have been assured
inspection certificate. with the proper
documents

Location: North Zone Closed Out Date: 14th June

Page| 1
HSSE INSPECTION REPORT

CONSULTANT CONTRACTOR RESPONSE:


Log Requirement /
Observation Photo Rectification: Insert Evidence Photo:
# S.R Recommendation
2022

3.

Location: Closed Out Date:


4.

Location: Closed Out Date:


5.

Location: Closed Out Date:

Page| 2