Status of MMLPs

(As of 29.07.2022)

Recent update during last


SN Site Status
week
1 Mappedu,  Rly alignment is frozen,  DPR under scrutiny with
Chennai estimates along with DPR is RVNL
shared with RVNL  RVNL has proposed Mr. B.K.
 ‘In Principle’ for Railways Reddy as Director in the
approval received with MMLP Chennai SPV.
conditions.  SPV related documents of
 The last for bid submission Mr. B.K. Reddy has been
for MMLP tender is received in physical copy.
09.06.2022.  Standing Finance Committee
 SFC meeting was held on (SFC) MoM finalized and
09.05.2022 for approval of circulated.
MMLP Chennai project.  Foundation Stone for MMLP
Chennai laid by Hon’ble PM
on 26.05.2022.
 ESP modifications made by
the consultant are under
review.
 Land acquisition letter has
been sent to Additional
Chief Secretary (ACS) for
Land acquisition of MMLP
and Railway land.
2 Muddalingana  Rly alignment is frozen.  VC held with Rail Expert of
halli, Bengaluru  NHLML published MMLP Consultant for finalization
tender on 5th Feb, 2022. of rail alignment. Modified
 Application for “In Rail alignment under
Principal approval” done preparation by the
through online mode but a consultant.
hard copy with codal  PATSC (Project Appraisal
charges is being processed and Technical Scrutiny
by the consultant. Committee) held on
08.06.2022.
 SFC appraisal held on
18.06.2022
 MMLP Bangalore Prebid held
on 05.07.22
 Railway proposal Online
submission made on FBD
portal as directed by SWR.

3 Machal, Indore  Joint site visit held on  Draft feasibility report


08.02.2022 with NHLML & received from the
MP Industrial Development consultant on 26th May 2022
Corporation MP Govt. has to NHLML.
finalized another land  Rail DPR yet to be received.
parcel at village Jamodi,
Kheda and Akolia, Tehsil
Pithampur, Dist. Dhar.

Page 1 of 3
Recent update during last
SN Site Status
week
 Rly alignment under
discussion.
5 Pune Site finalized at Nigde by Maharashtra Industrial
Maharashtra Industrial Development Corporation
Development Corporation (MIDC) has proposed a new Site
(MIDC) and informed to at Pawlevadi next to the earlier
NHLML. Nigde Site.
Demarcation and coordinates
received from MIDC.
 Site visit to be held on
08.07.22.

6 Coimbatore Consultant has submitted the The consultant submitted a


proposal for land selection. revised land proposal for land
The copy of the same is also selection on 26th May 2022.
shared with RVNL.
Based on the above report,
Site visit done on 16th and 17th
May, 2022 to finalise the
suitable site from various 3
options. Informed consultant
to check the possibility of
further additional area in
Option-1 and submit the
report.
7 Hyderabad Site under finalisation. TSIIC (Telangana state
NHLML is perusing with Govt. industrial infrastructure
of Telangana corporation) has identified a
DO letter sent to CS, Govt of site in Zaheer Abad.
Telangana on 28.04.2022
Site visit held on 20.06.2022 at
Zaheer Abad Site. Alternate
sites to be identified.
8 Mumbai Bhayandar site is suggested. Pros & Cons of the site are
being evaluated.
NHLML has informed Two land parcels were
consultant to start the work shortlisted. Mira Bhayandar and
Bhiwandi.

9 Samba, Jammu Site finalized at Samba Invitation of RFP for a


feasibility study in process.
DPR is being invited for
preparation of Feasibility
Bids invited for Feasibility
Report
studies.
Rail alignment can be
developed towards the
southern edge of the site.
A 10 m elevation difference is
observed between the Rail
alignment and the lowest part
of the site.
A consultation with the
Page 2 of 3
Recent update during last
SN Site Status
week
adjacent Industrial area is
suggested regarding the HFL
and the appropriate measures
taken to mitigate flooding.

Draft MoU shared with J&K


SIDCO and RVNL.
10 Cochin, Kochi Initial discussions started. No change
Port Trust Land, Based on the discussions, it
Wellington was agreed that the
Island construction of rail siding for
the considered site in Cochin,
Kochi Port Trust Land,
Wellington Island is feasible.

Rail siding from the existing


line can be extended to the
site as the marshy land will not
need extensive additional
interventions.
Cost-benefit analysis of the
operations due to train
movement is suggested to be
reviewed during detailed
engineering assessment and
the internal layout planning in
the further stages.
11 Aurangabad, Site finalization by MIDC in Invitation of RFP for feasibility
Maharashtra Shendra Bidkin area. study in process.

Site visit is being planned in 1st


week of June for the site
identified and communicated
by MIDC.
Bids for DPR studies invited.
12 Kanpur Rooma industrial area, a Bids invited for Feasibility
tentative site for MMLP. studies
13 Anantapur MoU has signed between
NHLML & Andhra Pradesh
Industrial Infrastructure
Corporation Ltd (APIIC) on
17.02.2022. Supplementary
MoU to be signed with RVNL
soon.
14 Vishakhapatna MoU has signed between NHLML
m & APIIC on 17.02.2022.
Supplementary MoU to be
signed with RVNL soon.

Page 3 of 3