You are on page 1of 2

Republic of the Philippines

Department of Education
Caraga Region
SCHOOLS DIVISION OF SURIGAO DEL SUR

GENERAL MATHEMATICS
WEEK 2 – ACTIVITY 2

RATIONAL FUNCTIONS

I. Directions: Solve the following work problem. Show your solution. No Solution, NO POINTS.

1. How long would it take for both pipes to fill the swimming pool together, if a white pipe
would take 9 hours to fill a large swimming pool full of water and a blue pipe 12 hours
to fill the same swimming pool full of water?
2. It takes Jack 5 hours and Joan 10 hours to paint a shed. How long will it take them to
finish the job if they work together?
3. Maybell can do a job in 4 days and her assistant, Nigel can do the same job in 16
days. How long will it take for Nigel and Maybell to complete the job, if they work
together?

II. Directions: Begin at the “Start!” and determine whether the given is a rational function, a
rational equation, a rational inequality, or none of these. Encircle your answer and use your
answer to move to the next square. Continue until you get to the “Finished!” square.

Gamut, Tago, Surigao del Sur


214-6135
(0946)4669-560I (0907)2739-041I (0938)-5092-655I (0938)2568-540
304889@deped.gov.ph
Republic of the Philippines
Department of Education
Caraga Region
SCHOOLS DIVISION OF SURIGAO DEL SUR

III. Directions: Solve each equation and check the solution. SHOW YOUR SOLUTION.

IV. Directions: Solve each of the following inequalities. SHOW YOUR SOLUTION.

V. Directions: Find the intercepts, zeroes and vertical and horizontal asymptotes of the
following rational function. SHOW YOUR SOLUTION.

Note: Write your answers in a clean sheets of LONG BOND PAPER.

Gamut, Tago, Surigao del Sur


214-6135
(0946)4669-560I (0907)2739-041I (0938)-5092-655I (0938)2568-540
304889@deped.gov.ph

You might also like