You are on page 1of 4

Technical Education Skills and Development Authority

Masbate
Masbate Polytechnic and Development College, Inc.
Baleno, Masbate

HOUSEKEEPING SCHEDULE
Animal
Production
Qualification Station/Bldg Poultry House
(Poultry Chicken)
NC II
Practical Work
Area/Section
Area
In-Charge Winjie R. Rapsing
Schedule for the month of December 2021

Responsible
ACTIVITIES Every
Person Every
Daily other Weekly Monthly Remarks
15th Day
Day

1. Clean poultry Albao, X Activity


house ceilings. Julius B. is done
Remove cobwebs before
and and
outdated/unnecessa after
ry objects/items. the
session
.
2. Clean the Dalit, Mary X Activity
workshop Grace B. is done
ventilation and before
illumination by and
dusting after
lamps/bulbs and the
replace non- session
functional lamps. .
3. Clean all storage Senining, X Activity
tools/cabinets. Jesiel A. is done
Place tools, before
equipment and and
PPEs in after
appropriate the
positions/location session
s with proper .
labels/signages.
4. Clean and Dalit, John X Activity
inspect poultry Carlo B. is done
house before
conditioning. and
Check knobs if in after
normal positions the
and are session
functional. Clean .
foot baths.
5. Check if cables Senining, X X Activity
and plugs are in Jeniel A. is done
order, well- before
arranged and all and
items functional. after
the
session
.
6. Clean and check Rapsing, X Activity
Rest Room; Roxanne is done
before
• Urinals, bowls,
and
wash basins,
after
walls and
the
partitions are
session
free from
.
stains, dirt,
oils, graffiti and
unnecessary
objects;
• Ceilings free
from cobwebs
and dangling
items
• Floor is kept
dry; no broken
tiles or
protruding
objects
• Equipped with
dipper and
pails; properly
located after
use
• Water systems
is functional:
no
dripping/dama
ged faucets or
pipes
• Drainage
system is
working, no
water-clogged
areas
• No offensive
odor
 Lights
/Ventilation
7. Clean and check Alvarez, X Activity
wash area: Ana Marie is done
before
• Walls/Floors- –
and
free from oils,
after
molds, broken
the
tiles, gums,
session
stains or
.
graffiti
• Drainage
system is
functional
• Water system
functional; no
dripping
faucets or
leaking pipes
 Free from
unnecessary
objects
(mops, rags)
8. Clean and Licup, X Activity
maintain work Vaneza M. is done
shop before
surroundings by and
sweeping/ after
removing fallen the
leaves, branches, session
debris and other .
refuse,
impounded
water, clearing
pathways of
obstructions.
9. Segregate and Bello, Mary X Activity
dispose waste Ann M. is done
materials. before
and
(Follow waste
after
segregation the
system) session
.

Prepared by:

ROSALINDA R. Verano
Trainer

You might also like