Risk Assessment Form

Company: Creventus Pte Ltd Conducted by: MADELINE LEE (Account Manager)
MCI
Life Building
Long Learning Centre
Event
Level Hall
1 1-1
Atrium
Process/ Location: (Names, designations) WAYNE YEO (Project Manager)
Approved by: WAYNE YEO - 97818830
(Name, designation) Project Manager
Next Review
(Date) 20 JAN - 22 JAN 2023 Last Review Date: Dec-21 Date: Dec 2022
Hazard Identification Risk Evaluation Risk Control
S/N Additional Risk Action officer, Designation
Actives / Tasks Hazard Possible accident Existing risk control Severity Likelihood Risk Level Severity Likelihood Risk Level
o. Control (follow-up date)
Make sure the trolley is
1 not above the human
Transport height 1.2m while
workers/mate Traiffic accident Fatality / Physical injury Vehicle driven by valid License only Major Remote Medium transporting Nil WAYNE YEO
2 Transport Casuing problems to other Wheel lock or block the
workers/mate Material fallen of vehicle road user Secure items and no overloading Moderate Remote Low rolling object Low WAYNE YEO
Carry with extra men
help or make more trip
1) Unsafe Lifting posture Back injury Personal are trained in the correct lifting posture Moderate Remote Low during transport Low WAYNE YEO
3
Keep the safety distance
Manual Lifting of Personal Protective Equipment PPE e.g safety helmet, safety and secure the equipment
Goods 2) Dropping of goods Body injury and cuts shoes, goggles, gloves Minor Occ High when pushing Low WAYNE YEO
Remote Occasional Frequent
Likelihood Severity
(R ) (O) (F)
Major (Ma) M H H
Moderate (Mo) L M H
Minor (Mi) L L M
RED FLARE PRODUCTIONS PTE LTD
H = HIGH RISK M = MEDIUM RISK L = LOW RISK