Professional Documents
Culture Documents
ITeM 'eQUIPMe~IT! SYSTEM I SUB-SYSTEM ERECTION OF POWER CYCLE PIPING Rev. No.: 00 Dale:18.04.11
DETAILS i.e. MQQ~Z-EIRATI~IC ets,
PROJECT SPECIFIC DOC. No. ALLOTMENT OPE:BR:021 (TICK APPLICABLE)
APPROVED DOC.No:RQPIl;QI'I RFOPI-SI'Q!> 0000-999-0VM- T -012-ROI The QP is endorsed for this project without any change.
B) RFQP/SFQP:
1. MAIN SUPPLIER (WITH A COPY OF QP)
2. MANUFACTURER
CHANGES EFFECTED: 3. CQA-O/C
aJJ~
SIGNATURE: fB.NNANDAN I DATE: 18.04.11 SIGN: IManufacturer) NTPC fReviewed/Annroved bv/Dete & Seall
'OIWA'NO~~.(W.p_l,",~