Airport Name: Agartala: Re 2022-23 Ans Fund Utilisation Status
Airport Name: Agartala: Re 2022-23 Ans Fund Utilisation Status
100m Digging
Today, the vendor carried out and
Materials worth
1.OFC network for ₹ 9,000,000.00 Rs.35,80,723 sending another then stopped due
CNS installations. Lot of items worth bad weather. Next
received so far.
Rs 30 Lakhs by Air Lot of materials
expected today
2-23 ANS FUND UTILISATION STATUS
Digging work
stopped due rain
and labour
Materials worth problem.
total RS.62,33,503 Total Digging work
received so far. done for 1.2Km.
Understood Bill
raised for RS.62
Lakhs.
31.03.23
RE 2022-23 ANS FUND UTILISATION
Airport Name: Dimapur
Fund to be Status of CAPE
Name Of the Work utilized in March
2023 21.03.23 22.03.23 23.03.24
1.Earthing Material
₹ 1,219,099.00
for ILS Project.
2-23 ANS FUND UTILISATION STATUS
2.GPS Clock
₹ 346,566.00
Project.
2-23 ANS FUND UTILISATION STATUS
2. 26 port Ethernet
₹ 292,000.00
managed switch.
2-23 ANS FUND UTILISATION STATUS