EXERCISE#1

COMPLETION STRING DESIGN

There were two productive zones in this well; it is required to accomplish bottom-hole
completions to produce well fluid from this well. Well completions would include
packers and Sub Surface Safety Valve (SSSV). The information about these two
productize zones are listed in the TABLE-1.

What types of well completions can you install in this well? Draw (sketch) the fully
labelled schematics of completion diagrams to illustrate the following production
strategies from:

i. zone 1 and zone 2 separately.


[20 marks]
ii. zone 1 and zone 2 commingle.
[20 marks]

TABLE-1
Reservoir Bottom hole
Productive Perforation length,
Thickness, pressure, Reservoir problem
zone ft
ft psi
1 10 3000 10 Sand production
2 30 3400 30 Water Coning