South Asia Pakistan Terminals

Engineering Department

Daily Activity Report


Section: ARTGC Date: Friday, December 2, 2022
Shift: Day Time: 0800-1800
Staff Available: Imran, A. Majid Absent: Muteeb (CL), Hussain (Shift)
Down Time Maintenance Staff Names with
Equipment Activities Equipment Status
From To Time Hours
RC RTGC
in operation
32,33,36,38,39,41
RTG 37,40,42 Standby
RTG 34 Under Observation
RTG 35 Accidental
Faults

Activity

As per follow up, checked motor insulation resistance phase to phase


and phase to ground, found ok. Then checked motor power cable
insulation resistance, found ok too.
RTG 34 Checked all power train and tightened the connections. Checked the Under-Observation Imran, A. Majid
current response and compared with RTG37, found same. Then tested
Gantry with full speed and found no fault.
Need to confirm functionality with operator.

Following work orders has been performed.


• Spreader system electrical monthly work order
• Headblock system electrical monthly work order
• AGSS system electrical monthly work order
RTG 37 • CTCS system electrical monthly work order Completed A. Majid, Cleaner
• LED system electrical monthly work order
• Gantry system electrical monthly work order
• Gantry system electrical three monthly work order

RTG 37 Gantry hydraulic station of both sides cleaned. Spreader and Headblock Completed Cleaner, Painter
and Gantry structure cleaning done.

Umair