s3-13 - Tower 1 Shear Wall Elevation
s3-13 - Tower 1 Shear Wall Elevation
1. SEE PLANS FOR SHEAR WALL THICKNESS. WALL THICKNESS IS THE SAME AS
THE WALL BELOW, UNLESS NOTED OTHERWISE.
LEVEL 10 T1 - LEVEL 29
RED - Technical Planning Department
8 B 71600 4 A 126200
H2
LEVEL 09 T1 - LEVEL 28
ARCHITECT OF RECORD
8 B 68600 4 A 123200
16
GF & Partners
SHEAR WALL VERTICAL REINFORCING SCHEDULE A r c h i t e c t s
S3.34
V5 V8 V9 MARK REINFORCING REMARKS ANNETTE F. GADDI-LIGANOR
A R C H I T E C T
16 V3 T28 @ 300 EF TELEPHONE (632) 553-7232 FAX (632) 553-7230 E-MAIL: postmaster@gfparchitects.com
STRUCTURAL
S3.36 V4 T32 @ 300 EF
V5 T36 @ 300 EF
H1
LEVEL 07 T1 - LEVEL 26 V6 T28 @ 150 EF ASSOCIATES
incorporated
JOSE A. SY
62600 117200 V7 T32 @ 150 EF STRUCTURAL ENGINEER
8 B 4 A Unit 504 Pryce Center, 1179 Chino Roces Avenue
V8 T36 @ 150 EF cor. Bagtican St., Makati City REG. NO. 22404 TIN 123-489-697
750 1550 Telephone No. 896-97-04 to 05
V9 T36 @ 150 (5) LAYERS Fax No. 896-97-60 to 61
e-mail address: info@sysquared.com
PTR NO. 5330036 DATE 01-07-16
PLACE MAKATI CITY
V6 V3 V3 V10 T36 @ 150 (6) LAYERS ELECTRICAL
2825
V7 V7 E
PROFESSIONAL
F R E N B.
ELECTRICAL ENGINEER
C R U Z
LEVEL 05
H1 H1 SHEAR WALL HORIZONTAL REINFORCING SCHEDULE
50
8 B 56600 T1 - LEVEL 24 MECHANICAL
8 B 107600 ISSUED AT
f'c = 8000 PSI
8 B 101600
FIRE PROTECTION ENGINEER
8 B 98600
LEVEL 01
42600
9 B
T1 - LEVEL 19
8 B 95600
QUANTITY SURVEYOR
H2 H1
LEVEL B1
38400 T1 - LEVEL 18
9 B 92600
8 B Arcadis Philippines, Inc.
4th Floor King's Court 1, 2129 Pasong Tamo Makati City
16 Tel: +632 8112971 Fax: +632 8112071
S3.35 E-mail: info-ph@arcadis.com www.arcadis.com
V4 V7
LEVEL B2 REVISIONS
35300 T1 - LEVEL 17 NO. DATE DESCRIPTION
9 B 89600
8 B
17
T1-AH
S3.13
LEVEL B3 T1 - LEVEL 16
32200 86600
9 B 8 B T1-AG
NOTES:
PROGRESS PLANS
900 1400 900 1400
SHEET CONTENTS