JOB TITLE / AIM: JSA for cement plaster at switch room

JSA DATE: 15/1/07 JSA NO./ REVISION:


SUPERVISOR/ JSA LEADER Gul Sher SCRIBE: Abdullah Khan
PARTICIPANTS: Agha Saeed , Gul Sher
LIST ASSOCIATED PROCEDURES/WORK INSTRUCTIONS OR TEMPORARY WIs:
Attach copies of any relevant documentation/ drawings.
Part 2: Job Safety Analysis
Job Steps:
1.Mobilization of Workers & tools
2. Working at height
3. Plastering and Chipping
4.Night Working
5. Demobilization

Alternatives Considered: N/A

Now undertake the JSA and record in the table below. Use prompts on JSA Prompt Sheet and Hazard Checklist PA-HSEC-02-040-002-F03.
Part 3: Contingency Plans. Standard PPE,S : First aid kit must be present at the area and the Hse personnel is the first response in case of
emergency

Part 4: Review. After the job has been completed, JSA leader should note: any hazards, which were identified in the original JSA? Any practices
that need to be captured in the OMS? List action items, changes, and transfer any changes to the Change Management system.

File: 10.30
JSA No: JOB TITLE:
Step Describe Job Step Potential Hazards Hazard Controls
No (Copy from part 2 of form) (Use Hazard Checklist)
1 Mobilization of workers and tools Unskilled person involve this activity Ensure all workers trained & well oriented about
safety and plastering work Prior to work.
Unauthorised tools brought out to site All tools must be inspected And colour coded
before start activity.
Workers starting the job without JSA JSA must be in place prior to work. Ensure all the
persons take part in the toolbox meeting
discussion. Persons signed at the back of JSA

2. Working at Height Without inspected/ tagged scaffolding use Scaffoldings must inspected and tagged before
use.(green Tagged)
Workers are working at height without green Prior to work all workers should be taken training
card to get green ID card
Use of shortcut access Always every person shall use safe access of
scaffold.
Poor house keeping Keep good house keeping as to save falling and
tripping hazards by proper training to personnel
by toolbox talk.
Unskilled workers worked on scaffold Competent / trained worker participate this
activity.
Workers will be aware about such activity by
conducted toolbox talk.
Worker carry green ID card with stamp.
Worker shall not allow work at height without
green card.

Heat Stress/Exhaustion Ensure potable water/sufficient shelter is


available in each area where workers are doing
the job. First aid kit available at site.
Falling & tripping Don’t store the material on the working place.
Keep good housekeeping to save falling &
JSA No: JOB TITLE:
Step Describe Job Step Potential Hazards Hazard Controls
No (Copy from part 2 of form) (Use Hazard Checklist)
tripping.
Fall of workers and materials For purpose of decent & ascent will be use
scaffold safe access.
Ensure that the materials shall be place in proper
location that it will not create tripping hazards.
Ensure that a drop zone shall be established to
manage the hauling of the materials and restrict
access.
Ensure that the area at bottom of the scaffold is
drive.

3. Plastering and chipping Unskilled persons involve this activity Person should be trained & well orientated.

Damage tools are using Prior to work tools are inspected & colour coded.

Exposure of workers to various hazards like eye Use of PPE’S like helmet, goggle, gloves, and
injury, dust injury & Hand injury dust mask, safety shoes, jacket & covers all to
save the injuries.
Heat Stress/Exhaustion Ensure potable water/sufficient shelter is
available each area where workers are doing the
job. First aid kit available at site.
Lack of supervision All workers & supervisors be careful which
activity is going on.
SIMOPS No parallel activity is going on, only single
activity should be follow
4 Night working Poor visibility Ensure sufficient amount of lighting in the area
No work shall be performed if there if not enough
lighting
If access is not properly lit then a designated
assembly point shall be established with
JSA No: JOB TITLE:
Step Describe Job Step Potential Hazards Hazard Controls
No (Copy from part 2 of form) (Use Hazard Checklist)
sufficient light.
Trips/falls Ensure all excavations adjacent to the work area
is taped off with high visibility tape prior to
commencement of works.
A standby vehicle should be present at the area
A charge radio must be present at all times at the
area and any incident must be reported
immediately to BHPB personnel
Doctor will be on call in any case
Miscommunication
Employees will assure a buddy system
No worker shall work alone at the site
Ensure that no workers shall work more than 14
Person working alone hours and have 7 hours enough sleep
Ensure that special attention will be done for the
presence of snake in the area
Snake bite

4. Demobilization Poor house keeping After completion of work area of working place
should be neat & clean.