You are on page 1of 7

MACOVS LIMITED

P O BOX 5859
BOROKO, NCD
PH: +675 72007088

Attention to:
Managing Director & General Manager

Subject:
Nipa Kutubu Holdings Limited Camp Construction
Report

Month of Report:
May

Date: 11/06/2023

1
MACOVS LIMITED
P O BOX 5859
BOROKO, NCD
PH: +675 72007088

Contents
1. Payment Follow-Up ........................................................................................................................................................ 3
2. Current Work Progress.................................................................................................................................................... 5
3. Grandstand Construction................................................................................................................................................. 6
4. Hausman Construction .................................................................................................................................................... 6
5. Stone Pitche Wall ............................................................................................................................................................ 6
6. Retaining wall Basket ..................................................................................................................................................... 6
Summary ................................................................................................................................................................................. 7

Figure 1 the guy in the pircture is Francis who threaten to take 1 of our fuel drum .............................................................. 3
Figure 2 Our Yard security at Sowa defending our fuel drum ............................................................................................... 3
Figure 3 Fuel Drum was taken out from the fuel house. ........................................................................................................ 4
Figure 4 Earthworks ................................................................................................................................................................ 5
Figure 5 drainage for ston pitch wall ...................................................................................................................................... 6

2
MACOVS LIMITED
P O BOX 5859
BOROKO, NCD
PH: +675 72007088

1. Payment Follow-Up
 Since the construction of Nipa Kutubu Holdings Limited Camp, on 19/04/2023 there has been destruction of
crops gardens for eight people.
 A report was sent on 5/05/2023 to verify the claims these eight people who claims to have their gardens and crops
being destroyed.
 We said to svelte them K200 per head for the eight individuals. Total cost is K1600.
 At the moment these very individuals and stopping us from working until we settle them with their claim.
 I urgently recommend we settle their payment as soon as possible.

Figure 1 the guy in the picture is Francis who threaten to take 1 of our fuel drum

Figure 2 Our Yard security at Sowa defending our fuel drum

3
MACOVS LIMITED
P O BOX 5859
BOROKO, NCD
PH: +675 72007088

Figure 3 Fuel Drum was taken out from the fuel house.

4
MACOVS LIMITED
P O BOX 5859
BOROKO, NCD
PH: +675 72007088

2. Current Work Progress


i) Clearing and grubbing, removal of top soil and vegetation – completed

Figure 4 Earthworks

ii) Prepare drainage for stone pitch wall - completed


iii) source base/subbase martials to be distributed all over the cam area. (yet to)

5
MACOVS LIMITED
P O BOX 5859
BOROKO, NCD
PH: +675 72007088

Figure 5 drainage for stone pitch wall

3. Grandstand Construction
i) Source materials
ii) Organise labours
iii) Commence construction

4. Housman Construction
i) Source materials
ii) Organise labours
iii) Commence construction

5. Stone Pitched Wall


i) Source materials
ii) Engage labours
iii) Commence construction

6. Retaining wall Basket


i) Source materials
ii) Engage labours
iii) Commence construction

6
MACOVS LIMITED
P O BOX 5859
BOROKO, NCD
PH: +675 72007088

Summary
Things we need to do in the following order
1. There are lot of pressure and threats from the 8 people that were affected.
We need make the payment of K1600 or at least something.
The lives of our employees are at risks as well as our properties.
It is not a welcoming and healthy working environment when we have people standing with machetes and raising
frustration without employees.

2. Build the Housman


3. Construct the Grand-Stand
4. Construct stone-pitch wall and Retaining Wall

Respectfully
Project Engineer