Professional Documents
Culture Documents
Review Details
S/No Section/Para/Dwg. Reviewer CPY Comments CTR Proposed Change CPY Response Closed Closed by
pp
01 5-Mar-2023 AFD ACCEPTED FOR DESIGN Kinia Kwietniewska Jun Pedregosa Jagadeesh Tayalur
The information contained in this document is the proprietary to North Oil Company. It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North
Oil Company. Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version.
Major Projects Template MAJOR-00000-MPQA-MPQA-FOR-000004_Rev00 Dated 29/03/2022
Page 1 of 24
Block 5 - AL SHAHEEN FIELD Development
REVISION HISTORY
Kinia Jagadeesh
00 5-Feb-2023 IFR ISSUED FOR REVIEW Jun Pedregosa
Kwietniewska Tayalur
Kinia Jagadeesh
01 5-Mar-2023 AFD ACCEPTED FOR DESIGN Jun Pedregosa
Kwietniewska Tayalur
The information contained in this document is the proprietary to North Oil Company. It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North
Oil Company. Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version.
Major Projects Template MAJOR-00000-MPQA-MPQA-FOR-000004_Rev00 Dated 29/03/2022
Page 2 of 24
Block 5 - AL SHAHEEN FIELD Development
TABLE OF CONTENTS
1. INTRODUCTION .............................................................................................................................. 4
2. REFERENCES ................................................................................................................................... 7
3. DEFINITIONS AND ABBREVIATIONS ............................................................................................. 8
3.1. DEFINITIONS ........................................................................................................................................................ 8
3.2. ABBREVIATIONS.................................................................................................................................................... 8
4. HOLDS ............................................................................................................................................. 9
5. ORDER OF PRECEDENCE ................................................................................................................. 9
6. PURPOSE ...................................................................................................................................... 10
6.1. Purpose of Document ........................................................................................................................................... 10
6.2. Scope Description ................................................................................................................................................ 10
7. RISERS PRESERVATION ............................................................................................................... 14
8. TIE-IN SPOOLS PRESERVATION ................................................................................................... 14
9. TOP OF RISER TO TOP OF RISER VOLUME PRESERVATION ......................................................... 15
9.1. CAMPAIGN 1 PRESERVATION 24 MONTHS ............................................................................................................. 15
9.2. CAMPAIGN 2 PRESERVATION 12 MONTHS ............................................................................................................. 17
9.3. CAMPAIGN 2 PRESERVATION 12 MONTHS ............................................................................................................. 18
10. SYSTEM PRESERVATION .............................................................................................................. 18
10.1. TOR to TOR ........................................................................................................................................................ 18
10.2. PIG TRAP to TOR ................................................................................................................................................. 19
10.3. PIG TRAP to PIG TRAP ......................................................................................................................................... 20
11. MONITORING ............................................................................................................................... 22
12. PIPELINES PRESERVATION FLOW CHART ................................................................................... 22
13. APPENDICES ................................................................................................................................. 23
13.1. HYDRO 3 DATA SHEET ......................................................................................................................................... 23
13.2. VCI GUIDELINES ................................................................................................................................................. 23
The information contained in this document is the proprietary to North Oil Company. It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North
Oil Company. Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version.
Major Projects Template MAJOR-00000-MPQA-MPQA-FOR-000004_Rev00 Dated 29/03/2022
Page 3 of 24
Block 5 - AL SHAHEEN FIELD Development
1. INTRODUCTION
The Al-Shaheen field is Qatar’s largest oil field. It is a conventional oil field (60-70m water depth) situated offshore in Qatar
approximately 70km north-north-east of Ras Laffan. The field overlays the giant pre-Khuff gas field known as the North
Field.
The information contained in this document is the proprietary to North Oil Company. It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North
Oil Company. Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version.
Major Projects Template MAJOR-00000-MPQA-MPQA-FOR-000004_Rev00 Dated 29/03/2022
Page 4 of 24
Block 5 - AL SHAHEEN FIELD Development
Discovered in 1982, Al-Shaheen is one of the world’s largest carbonate fields with producing reservoirs found mainly in
the Cretaceous period and some prospects in both the Cretaceous and Late Jurassic periods. It has been producing since
December 1994.
The recovery mechanism was based first on natural depletion followed by pressure support through water injection.
Recovery using Gas Injection (GI) and Water-Alternating-Gas (WAG) has been under pilot trial since 2010.
Oil is produced from seven different reservoirs with the three major contributors being the Shuaiba, Kharaib and Nahr Umr
formations. In-place volumes are estimated to be 30 to 40Gb. Al-Shaheen oil averages 30° API; gas from the gas cap
contains ~0.4% H2S and 3% CO2.
Thirty-three (33) platforms, including five production hubs, have been installed in Al-Shaheen field. These are spread over
nine different locations across the field, A to I. Crude is exported by tanker via tandem offloading from two Floating Storage
and Offloading units (FSOs) which are permanently moored in the field to two of three single point moorings (SPMs).
Gas is gathered in a gas grid pipeline system and exported via the North Field Alpha facilities. Cleaned-up produced water
is currently injected (disposal) into the Umm Er-Radhuma (UER) formation with some limited disposal to sea due to current
capacity constraints. Al-Shaheen reached a production plateau of 300kb/d in 2007 and is still producing at this rate today.
In December 2016, the total oil produced from Al-Shaheen was 1.7Gbbl.
The field has been developed through several phases and further development phases are envisaged by North Oil Company
(NOC), the operator of Al-Shaheen concession.
Phase 2 is currently ongoing with three batches where Batch 1 (3 WHPs) has been installed and production is ongoing;
Batch 2 (2 WHPs) facilities have been installed and project close out activities are ongoing; and Batch 3 (CPP + 2 WHPs)
is in EPC phase, planned for installation in 2023. In parallel, Phase 2 also includes some pipeline de-bottlenecking scope.
With the Phase 2 batches, the number of facilities in Al Shaheen will become forty-two (42) platforms installed.
NOC, in an effort to improve the field production capacity, has initiated a field development planned for Al Shaheen known
as the Ruya project.
The principal objectives of the Al Shaheen Ruya field development are:
• Accelerate production to reach robust 300 kbbls/d as soon as possible.
• Maintain target 300 kbbls/d yearly average plateau.
• Ensure the initial development step provides a plateau extension of circa five (5) years.
The scopes for the current Batch 1 (previously referred to as Phase 3.1) as part of Al Shaheen Ruya project comprise of
the following:
FEED for:
The information contained in this document is the proprietary to North Oil Company. It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North
Oil Company. Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version.
Major Projects Template MAJOR-00000-MPQA-MPQA-FOR-000004_Rev00 Dated 29/03/2022
Page 5 of 24
Block 5 - AL SHAHEEN FIELD Development
• Brownfield activities and tie-ins to existing networks at B Location, including delivery of work packages to enable
EPCIC Contractor to perform Procurement, Fabrication and Installation.
• OPTION for Brownfield scope at E location.
The information contained in this document is the proprietary to North Oil Company. It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North
Oil Company. Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version.
Major Projects Template MAJOR-00000-MPQA-MPQA-FOR-000004_Rev00 Dated 29/03/2022
Page 6 of 24
Block 5 - AL SHAHEEN FIELD Development
2. REFERENCES
Referenc
Ref.
Reference Number e Description
№
Revision
[01] SD-NOC-EC-600 01 Pre-commissioning and Commissioning Standard
[02] SD-NOC-EC-601 01 Pre-commissioning and Commissioning Engineering
[03] SD-NOC-EC-602 01 Pre-commissioning Execution
[04] SD-NOC-EC-603 03 Commissioning Execution
SD-NOC-MP-701 06 Document Identification and Numbering at Project
[05]
Execution
[06] SD-NOC-EC-405 01 E&C Identification & Numbering Procedure
SD-NOC-COR-560 00 Physical and Chemical Treatment of Hydrostatic Test
[07]
Water
FDP01-MDM3-ASYYY-37-302077-0001 01 RUYA BATCH 1 – HEALTH, SAFETY &
[08] ENVIRONMENT MANAGEMENT PLAN AND
PROCEDURE
FDP01-MDM3-ASYYY-37-282068-0001 02 RUYA BATCH 1 - QUALITY CONTROL AND
[09]
INSPECTION PLAN
[10] FDP01-MDM3-ASYYY-37-332018-0001 02 Ruya Batch 1 – Master Document Register
[11] FDP01-MDM3-ASYYY-14-642057-0001 01 PIPELINE & CABLE BASIS OF DESIGN
FDP01-MDM3-ASYYY-36-202004-0001 00 RUYA BATCH 1 - INTERFACE SCHEDULE AND
[12]
BATTERY LIMITS
FDP01-MDM3-ASYYY-37-303006-0001 00 RUYA BATCH 1 - FEED PROJECT EXECUTION PLAN
[13]
(PEP)
[14] FDP01-MDM3-ASYYY-12-392033-0001 00 RUYA BATCH 1 – PIPELINE ANODE SPECIFICATION
RUYA BATCH 1 – PIPELINES CORROSION COATING
[15] FDP01-MDM3-ASYYY-12-392029-0001 00
SPECIFICATION
International Standard
[16] NORSOK STANDARD Z-006 2015 Preservation
ASME B31.4 2019 Pipeline Transportation Systems for Liquids and
[17]
Slurries
[18] ASME B31.8 2020 Gas Transmission and Distribution Piping Systems
[19] DNV-ST-F101 2021 Submarine Pipeline Systems
[20] ASME B31.3 2020 Process Piping
The information contained in this document is the proprietary to North Oil Company. It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North
Oil Company. Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version.
Major Projects Template MAJOR-00000-MPQA-MPQA-FOR-000004_Rev00 Dated 29/03/2022
Page 7 of 24
Block 5 - AL SHAHEEN FIELD Development
TERM DESCRIPTION
The objective of the Brownfield study is to secure the feasibility, the operability, the planning
and the integration cost related to Existing facilities modifications.
Brownfield study
The level of details for the Brownfield study deliverables shall be understood as Detailed
Engineering level.
Refers to all the facilities already existing (i.e. in operation or planned as part of previous
phases of development) at the time when the studies are carried out.
Existing Facilities
Such facilities may have been designed applying technical rules and standards that can be
different from the “to-date” Technical standards.
Refers to the new facilities being implemented by the project. These might be either within
New facilities installed on existing structures or standalone and connected to the existing facilities via
subsea pipelines, cables and bridges.
Represents the NOC Corporate set of technical standards enforced at the time when the
“To-date” Standards
project studies are carried out.
ENGINEER MCDERMOTT MIDDLE EAST INC.
3.2. ABBREVIATIONS
Abbreviations Description
The information contained in this document is the proprietary to North Oil Company. It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North
Oil Company. Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version.
Major Projects Template MAJOR-00000-MPQA-MPQA-FOR-000004_Rev00 Dated 29/03/2022
Page 8 of 24
Block 5 - AL SHAHEEN FIELD Development
HV High Voltage
ILI Inline Inspection
IP Intermediate Pressure
KP Kilometer Point
LCV Level Control Valve
LDH Lay down Head
LG Lift Gas
LP Low Pressure
MMDT Minimum Metal Design Temperature
MMSCFD Million Standard Cubic Feet per Day
MPFM Multi-Phase Flowmeter
NOC North Oil Company (also referred to as COMPANY)
NUI Normally Unattended Installation
PCV Pressure Control Valve
PPS Post Production phase
PW Produced Water
SPM Single Point Moorings
SUH Start Up Head
TBA To be Assigned
TBC To Be Confirmed
TOR Top Of Riser
UA Utility Air
UER Umm Er Radhuma (aquifer)
WAG Water-Alternating-Gas (EOR technique)
WHP Wellhead Platform
WIJ Water Injection
4. HOLDS
No. Description
[01] Campaigns Sequence and exact scope can be modifed/Optimized at later stage of the project.
[02] Table 6.1: Pipeline Scope of Work and KP Direction can be revised during EPCI
[03] Chemical Product used for calculation can be changed during EPCI
5. ORDER OF PRECEDENCE
The information contained in this document is the proprietary to North Oil Company. It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North
Oil Company. Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version.
Major Projects Template MAJOR-00000-MPQA-MPQA-FOR-000004_Rev00 Dated 29/03/2022
Page 9 of 24
Block 5 - AL SHAHEEN FIELD Development
In case of any conflicts between different codes and after taking into account COMPANY Standards, the more stringent code
shall be exercised. In this event, COMPANY shall be advised, and COMPANY’s APPROVAL obtained for resolution of such
conflict without any cost and / or schedule impact.
6. PURPOSE
6.1. Purpose of Document
The purpose of this document is to establish a detailed methodology for carrying out the Pre-
Commissioning Pipelines Preservation activities in accordance with all aspects of the project
specification, codes/standards, responsibilities of the parties and scope of work for the Ruya EPS & PPS Pipelines.
The purpose of preservation activities is to maintain equipment in an unaltered state.
Traceability of such preservation activities will be necessary for warranty purposes with vendors, and for acceptance of the
plant by COMPANY.
This document will provide preliminary preservation pre-commissioning scope of work for Block 5 Al Shaheen Field, Phase 3.1
development for all pipelines listed in Table 6. 1.
The work is split between three installation Campaigns:
- Tie-In spool
- Riser
- Pipelines
6.2. Scope Description
The scope of document is to list the preservation activities throughout the Project, from Construction phase up
to Provisional acceptance.
Contractor will ensure that preservation is applied and carried out for equipment not required to be operational
for a certain period.
Preservation is required in vendor shop, during transport and storage, at Worksite and after Offshore installation.
Description:
The pipelines within phase 3.1 Development project are classified as Production lines and Other service lines.
The production lines comprise of the following:
1. Multiphase pipeline
2. Liquid wet oil pipeline
3. Wet LP Gas
These pipelines transport production fluids from Well Head Platforms (WHPs) to Riser Platform (AS-B-H). The KP runs in the
same direction of production fluids flow. The KP starts from pipeline tie-in (target box) at departure WHP and ends at pipeline
tie-in (target box) at Riser Platform (AS-B-H).
The information contained in this document is the proprietary to North Oil Company. It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North
Oil Company. Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version.
Major Projects Template MAJOR-00000-MPQA-MPQA-FOR-000004_Rev00 Dated 29/03/2022
Page 10 of 24
Block 5 - AL SHAHEEN FIELD Development
These pipelines transport service fluids are from Riser Platform (AS-B-H) to Well Head Platforms (WHPs).
The KP runs in the same direction of service fluids flow.
10. AS-L-A (DC03) AS-B-H (RP) AS-L-A (DC03) 6” Lift Gas 0.740
11. AS-B-H (RP) AS-L-A (DC03) 8” Water Injection 0.752
25. AS-Q-A (DC06) AS-B-H (RP) 10” Liquid Wet Oil 9.656
The information contained in this document is the proprietary to North Oil Company. It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North
Oil Company. Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version.
Major Projects Template MAJOR-00000-MPQA-MPQA-FOR-000004_Rev00 Dated 29/03/2022
Page 11 of 24
Block 5 - AL SHAHEEN FIELD Development
Approx.
o. Corridor From To Pipeline Length (km)
90
26. AS-R-A (DC09) AS-B-H (RP) 14” Liquid Wet Oil 8.352
28. AS-R-A (DC09) AS-B-H (RP) AS-R-A (DC09) 10” HHP Gas for WAG 8.364
38. AS-T-A (DC44) AS-B-H (RP) 10” Liquid Wet Oil 16.172
The major equipment used in the pipeline preservation operations are listed below. All the equipment shall be 100% certified
prior mobilising to field. Certificates shall be attached in the Pre-mobilisation Functional Test Report after the function test of
the equipment is completed.
The information contained in this document is the proprietary to North Oil Company. It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North
Oil Company. Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version.
Major Projects Template MAJOR-00000-MPQA-MPQA-FOR-000004_Rev00 Dated 29/03/2022
Page 12 of 24
Block 5 - AL SHAHEEN FIELD Development
Instrumentation sample:
The instruments used for the pipeline preservation operations are listed below. All the Instruments shall
be calibrated and will have a valid calibration certificates onboard. Instrumentation datasheets are
requested and calibration certificates shall be available as part of the Pre-mobilisation
Functional Test Report after the function test of the equipment.
The information contained in this document is the proprietary to North Oil Company. It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North
Oil Company. Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version.
Major Projects Template MAJOR-00000-MPQA-MPQA-FOR-000004_Rev00 Dated 29/03/2022
Page 13 of 24
Block 5 - AL SHAHEEN FIELD Development
7. RISERS PRESERVATION
Riser will be installed at Worksite by EPCIC11/12 and will be inerting at 2 barg with blind flanges at extremities.
Period timing will be from end of onshore installation to offshore Tie-In temporary Pig Trap installation.
N2 2 barg preservation
Tie-In spool can be protected at yard and during offshore phase by VPI/VCI. The emitter release a vapor than deposit on the
metal surface and form a protective molecular layer. This layer of VPI provides multimetal protection and helps reduce corrosion
from moisture attack in enclosure. For continuous protection in humid and contaminated atmosphere , a dosage range ( 300-
500g/m3) is recommended. The exact dosage is a function of the length of protection (2+ years) and the level of corrosity of a
specific environment. Tie-In spools extremities to be closed by blind flanges.
VCI preservation
The information contained in this document is the proprietary to North Oil Company. It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North
Oil Company. Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version.
Major Projects Template MAJOR-00000-MPQA-MPQA-FOR-000004_Rev00 Dated 29/03/2022
Page 14 of 24
Block 5 - AL SHAHEEN FIELD Development
Chemical dosages:
The chemicals shall be mixed with seawater on the discharge side of the suction pump. The chemicals will mix with pumped
seawater using a chemical dosing pump fitted with adjustable flow measurement depending upon the output flow rate of
suction pump. Chemical cocktail ( Hydro 3) of appropriate volume will be transferred from the manufacturer provided plastic
drums to Discharge side. Hydro 3 datasheet is available in Appendix 13.1.
For the pipeline preservation activity, Hydro 3 shall been used at different concentration according preservation duration up to
24 months. Sampling of water for quality check shall be done, results are to be recorded in TSX09 form (Appendix 13.4).
Note : Hydro3/4 have been choosen for calculation but other chemical product could be used for EPC phase.
The information contained in this document is the proprietary to North Oil Company. It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North
Oil Company. Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version.
Major Projects Template MAJOR-00000-MPQA-MPQA-FOR-000004_Rev00 Dated 29/03/2022
Page 15 of 24
Block 5 - AL SHAHEEN FIELD Development
Chemical
Chemical Chemical
Pumping Volume Concentrat
Corridor Pipeline Work Packages Name Quantity
ion
m3 liters Name ppm liters
12in Liquid ILI / Preservation
284.7 284670.9 HYDRO 3 500 135.6
wet Oil / Wet Lay-up
18in Wet LP ILI / Preservation
568.6 568579.9 HYDRO 3 500 270.8
Gas / Wet Lay-up
Preservation / 976.23 m3
10in Lift Gas N2, 5 barg
Dry Lay-up gas
20in Water ILI / Preservation
693.7 693710.5 HYDRO 3 500 330.3
DC05 Injection / Wet Lay-up
ILI / Preservation
22in PW 837.9 837933.6 HYDRO 3 500 399.0
/ Wet Lay-up
10in HHP Gas ILI / Preservation
197.5 197502.1 HYDRO 3 500 94.0
for WAG / Wet Lay-up
Preservation / 1977.14
10in Lift Gas N2 5 barg
Dry Lay-up m3 Gas
20in Water ILI / Preservation
1417.8 1417786.5 HYDRO 3 500 675.1
Injection / Wet Lay-up
DC06 16in Wet LP ILI / Preservation
1150.0 1149953.6 HYDRO 3 500 547.6
Gas / Wet Lay-up
10in Liquid ILI / Preservation
512.8 512790.0 HYDRO 3 500 244.2
Wet Oil / Wet Lay-up
14in Liquid ILI / Preservation
765.4 765404.9 HYDRO 3 400 291.6
Wet Oil / Wet Lay-up
20in Wet LP ILI / Preservation
HYDRO 3 400 728.7
Gas / Wet Lay-up 1572.24 1572241.5
DC09 10in HHP Gas ILI / Preservation
433.3 433253.7 HYDRO 3 400 165.0
for WAG / Wet Lay-up
Preservation / 2165.88
10in Lift Gas N2, 5 barg
Dry Lay-up m3 gas
20in Water ILI / Preservation
1553.0 1553020.2 HYDRO 3 400 591.6
Injection / Wet Lay-up
The information contained in this document is the proprietary to North Oil Company. It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North
Oil Company. Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version.
Major Projects Template MAJOR-00000-MPQA-MPQA-FOR-000004_Rev00 Dated 29/03/2022
Page 16 of 24
Block 5 - AL SHAHEEN FIELD Development
12 Months Preservation
Chemical
Chemical Chemical
Work Pumping Volume Concentrati
Corridor Work Packages Name Quantity
Packages on
m3 liters Name ppm liters
16in Wet ILI / Preservation /
349.8 349830.7 HYDRO 3 400 133.3
LP Gas Wet Lay-up
10in Liquid ILI / Preservation /
155.7 155658.3 HYDRO 3 400 59.3
Wet Oil Wet Lay-up
DC02
Preservation / Dry N2, 5 271.49
6in Lift Gas
Lay-up barg m3 Gas
10in Water ILI / Preservation /
151.2 151163.0 HYDRO 3 400 57.6
Injection Wet Lay-up
20in Water ILI / Preservation /
694.0 693966.2 HYDRO 3 400 264.4
Injection Wet Lay-up
10in Lift Preservation / Dry 973.11
N2, 5 barg
Gas Lay-up m3 Gas
DC28
12in Liquid ILI / Preservation /
775.1 775135.0 HYDRO 3 400 295.3
Wet Oil Wet Lay-up
20in Wet ILI / Preservation /
1933.2 1933161.9 HYDRO 3 400 736.4
LP Gas Wet Lay-up
The information contained in this document is the proprietary to North Oil Company. It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North
Oil Company. Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version.
Major Projects Template MAJOR-00000-MPQA-MPQA-FOR-000004_Rev00 Dated 29/03/2022
Page 17 of 24
Block 5 - AL SHAHEEN FIELD Development
12 Months preservation
Chemical
Corri Work Chemical Concentrat Chemical
Work Packages Pumping Volume Name ion Quantity
dor Packages
m3 liters Name ppm liters
8in Liquid ILI / Preservation /
344.1 344058.6 HYDRO 3 400 131.1
Wet Oil Wet Lay-up
18in Wet ILI / Preservation /
1533.1 1533073.5 HYDRO 3 400 584.0
LP Gas Wet Lay-up
DC01
16in Water ILI / Preservation /
1193.0 1193041.3 HYDRO 3 400 454.5
Injection Wet Lay-up
10in Lift Preservation / Dry 2616.59
N2, 5 barg
Gas Lay-up m3 Gas
10in Lift Preservation / Dry 1948.47
N2, 5 barg
Gas Lay-up m3 Gas
20in Water ILI / Preservation /
1390.3 1390266.9 HYDRO 3 400 529.6
Injection Wet Lay-up
DC44
20in Wet ILI / Preservation / 2970921.9
HYDRO 3 400 1377.0
LP Gas Wet Lay-up 2970.92 1
10in Liquid ILI / Preservation /
842.4 842404.9 HYDRO 3 400 320.9
Wet Oil Wet Lay-up
After completion of ILI run the pipeline systems remain filled with preservation medium. After confirmation of sufficient data
collection of UT tool both PLRs will be replaced with test flanges.
A pressure monitoring gauges and sampling valves shown on wet layup instrumentation sketch will be installed on the test
blinds to allow platform operators to monitor the pipeline pressure and taking water samples to perform preservation checks
post pipelines hand over to Company. The pressure applied will be 5 barg.
The pressure applied will be 5 barg.
The information contained in this document is the proprietary to North Oil Company. It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North
Oil Company. Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version.
Major Projects Template MAJOR-00000-MPQA-MPQA-FOR-000004_Rev00 Dated 29/03/2022
Page 18 of 24
Block 5 - AL SHAHEEN FIELD Development
After completion of ILI run the pipeline systems remain filled with
preservation medium. After confirmation of sufficient data collection of ILI tool TOR PLR will be
replaced with test flanges.
A pressure monitoring gauge and sampling valve will be installed on the test blind to allow platform
operators to monitor the pipeline pressure and taking water samples to perform preservation checks
post pipelines hand over to Company.
Contractor shall clear all the class A punch points and the section shall be signed from the company for
commencement of pipeline preservation activity. Contractor shall obtain necessary approvals from the
Company to commence preservation.
The information contained in this document is the proprietary to North Oil Company. It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North
Oil Company. Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version.
Major Projects Template MAJOR-00000-MPQA-MPQA-FOR-000004_Rev00 Dated 29/03/2022
Page 19 of 24
Block 5 - AL SHAHEEN FIELD Development
After completion of ILI run the pipeline systems remain filled with
preservation medium. After confirmation of sufficient data collection of ILI tool TOR PLR will be
replaced with test flanges.
A pressure monitoring gauge and sampling valve will be installed on the test blind to allow platform
operators to monitor the pipeline pressure and taking water samples to perform preservation checks
post pipelines hand over to Company.
Contractor shall clear all the class A punch points and the section shall be signed from the company for
commencement of pipeline preservation activity. Contractor shall obtain necessary approvals from the
Company to commence preservation.
The information contained in this document is the proprietary to North Oil Company. It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North
Oil Company. Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version.
Major Projects Template MAJOR-00000-MPQA-MPQA-FOR-000004_Rev00 Dated 29/03/2022
Page 20 of 24
Block 5 - AL SHAHEEN FIELD Development
The information contained in this document is the proprietary to North Oil Company. It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North
Oil Company. Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version.
Major Projects Template MAJOR-00000-MPQA-MPQA-FOR-000004_Rev00 Dated 29/03/2022
Page 21 of 24
Block 5 - AL SHAHEEN FIELD Development
11. MONITORING
The information contained in this document is the proprietary to North Oil Company. It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North
Oil Company. Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version.
Major Projects Template MAJOR-00000-MPQA-MPQA-FOR-000004_Rev00 Dated 29/03/2022
Page 22 of 24
Block 5 - AL SHAHEEN FIELD Development
13. APPENDICES
As stipulated in previous section 9, Hydro 3 has been used for calculation and as a potential chemical product for
Preservation scope. HYDRO 3X is a 3-in-1 hydrotest cocktail which functions as a Corrosion Inhibitor, Oxygen
Scavenger and Biocide. HYDRO 3X contains a broad-spectrum biocide that is effective against Sulphate-Reducing
Bacteria (SRB), General Heterotrophic Bacteria (GHB) and Acid-Producing General Heterotrophic Bacteria
(ApGHB), preventing the formation of corrosive species and biofilms. HYDRO 3X contains a scavenger to remove
oxygen and a film-forming corrosion inhibitor to provide further protection against material degradation.
• CEFAS Gold rated.
• Achieves oxygen scavenging rate to < 5 ppb in 2 minutes Corrosion inhibition > 99 %.
Stability, compatibility and independent performance data can be supplied upon request.
This is a reference guide for using VCI powder to lay-up or preserve metal pipelines. The table below
indicates the amount of VCI powder to use for pipeline dimensions typically found in pipeline lay-up and
preservation applications. As sample below product can be used for values reference. Final product will be chosen during EPCI.
Nox-Rust 1000SFG is good for ferrous applications, and has a strong ammonia odor. Nox-Rust 1010SFG powder is good for
both ferrous and copper applications, and has a slight odor.
The information contained in this document is the proprietary to North Oil Company. It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North
Oil Company. Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version.
Major Projects Template MAJOR-00000-MPQA-MPQA-FOR-000004_Rev00 Dated 29/03/2022
Page 23 of 24
Block 5 - AL SHAHEEN FIELD Development
The information contained in this document is the proprietary to North Oil Company. It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North
Oil Company. Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version.
Major Projects Template MAJOR-00000-MPQA-MPQA-FOR-000004_Rev00 Dated 29/03/2022
Page 24 of 24