JOB NO.

TITLE RCC Design of CABLE TRENCH


SHEET NO.
REVISION 0
PROJECT
PREPARED IK
DOCUMENT APPROVED IK
NO.
DATE 8/1/2023

DESIGN OF R.C.C. CABLE TRENCH: W 1200 x D 1500

Surcharge = 1.2 T/m2


1500
Unit wt. of water = 1 T/m3

150

150 150 1.5 t/m2 0.750 0.60 t/m2


1350 (earth) t/m2 (Surcharge)
1200 (water)

Grade of concrete M25 25 N/mm2


Grade of steel Fe500 550 N/mm2

Submerged unit wt. of soil gd 1 t/m3


Coefficient of Earth Pressure = 0.5

Depth 150 mm
Effective cover 40 mm
Effective depth 104 mm
Width 1000 mm

DESIGN OF SIDE WALL:

Moment at bottom of wall = 1.510 t m/m


Mu/bd = 2
2.095 N/mm2
pt = 0.491
Ast (Required) = 5.1 cm2

PROVIDED 12 DIA. @ 150 mm C/C 7.54 cm2 ( pt = 0.725 ) AT BOTTOM. O.K.

Check for shear :


Shear at the face of support = 2.588 T
Nominal shear stress.tv = 0.37 N/mm2
tc = 0.85*Ö(0.8fck(Ö(1+5b)-1)/6b = 0.485 N/mm2
where, b = 0.8 fck/ 6.89pt = 5.912
where, Total pt = 0.491
Shear Capacity= 7.28 T > 2.59 T OK
JOB NO.
TITLE RCC Design of CABLE TRENCH
SHEET NO.
REVISION 0
PROJECT
PREPARED IK
DOCUMENT APPROVED IK
NO.
DATE 8/1/2023

DESIGN OF BASE OF TRENCH

Self weight of trench = 2.36 t/m


Live load over trench = 3.2 t/m
Total 5.56 t/m
Upward pressure = 1.65 t/m2
Net pressure = 3.91 t/m2
Free B.M at span = 0.891 t m/m
Mu/bd2 = 1.236 N/mm2
pt = 0.275
Ast (Required) = 2.9 cm2

PROVIDED 12 DIA. @ 150 mm C/C 7.54 cm2 ( pt = 0.725 ) AT BOTTOM. O.K.

Distribution Steel:

Distribution reinforcement= 0.180 % of gross cross sectional area


Ast required = 0.18*150*1000/100 270.00 mm2
Spacing required = 291 mm

Provide 10 mm dia 150 mm c/c as distribution reinforcement OK

12 @ 150 c/c

10 @ 150 c/c
12 @ 150 c/c
1500

10 @ 150 c/c
10 @ 150 c/c

1200

12 @ 150 c/c