KIRSKAT VENTURE

Manila Office: Unit 712B Tower-B The Regalia Park Towers 150 P. Tuazon Ave, Cubao, Quezon City
Landline: 0287765788
Email: kirskatventure.manila@gmail.com

May May June June


Project Schedule Based on Actual Projected Dates
SCOPE Weight Amount Week -01 Week -02 Week -03 Week -04
Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat
Item No Description Duration Start Finish
27 28 29 30 31 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

27-May-23 28-May-23 29-May-23 30-May-23 31-May-23 1-Jun-23 2-Jun-23 3-Jun-23 4-Jun-23 5-Jun-23 6-Jun-23 7-Jun-23 8-Jun-23 9-Jun-23 10-Jun-23 11-Jun-23 12-Jun-23 13-Jun-23 14-Jun-23 15-Jun-23 16-Jun-23 17-Jun-23 18-Jun-23 19-Jun-23 20-Jun-23 21-Jun-23 22-Jun-23 23-Jun-23 24-Jun-23

0 General Requirement 178.00 24Jul2023 20Nov2023 G 3.68% 1,655,619.65 0.05% 0.05% 0.05%
1 Wall Framing Work 67.00 24Jul2023 28Sep2023 AR 5.55% 2,497,274.16 0.137354% 0.258213% 0.122608%
2 CHB laying 60.00 24Jul2023 21Sep2023 AR 4.97% 2,236,364.92 0.571013% 0.999427% 0.878800%
3 Approval for approved plan for construction (floor plan) 1.00 24Jul2023 AR 0.08% 37,272.75
4 Mock up of soil pipe slope (2nd Floor) 3.00 26Jul2023 28Jul2023 AR 0.25% 111,818.25
5 Rebar Scanning 7.00 26Jul2023 01Aug2023 AR 0.58% 260,909.24
6 Approval of Mechanical Plan (Shop Drawing) 7.00 27Jul2023 02Aug2023 AR 0.58% 260,909.24
7 Plastering works 15.00 28Jul2023 11Aug2023 AR 1.24% 559,091.23
8 Approval of Reflected Ceiling plan (with final elevations) 15.00 31Jul2023 14Aug2023 AR 1.24% 559,091.23
9 Approval of Shop Drawing of Coring works location 15.00 31Jul2023 14Aug2023 AR 1.24% 559,091.23
10 Approval of Electrical Plan and Auxillary Plan (Shop Drawing) 15.00 31Jul2023 14Aug2023 EE 2.15% 969,124.58
11 Approval of Shop Drawing for treatment of boundary walls 15.00 03Aug2023 17Aug2023 EE 2.15% 969,124.58
12 Installation Wall board Installation (One side) 22.00 05Aug2023 26Aug2023 AR 1.82% 820,000.47
13 Concrete neutralizer application 7.00 12Aug2023 18Aug2023 AR 0.58% 260,909.24
14 Coring Works 7.00 12Aug2023 18Aug2023 P 0.39% 176,732.86
15 Electrical rough-in/Conduit and Wiring Installation (Splicing) 14.00 14Aug2023 27Aug2023 EE 2.01% 904,516.28
16 Auxiliary rough-in 14.00 14Aug2023 27Aug2023 AU 2.15% 965,790.34
17 FDAS rough-in 14.00 14Aug2023 27Aug2023 AU 2.15% 965,790.34
18 Application of skimcoat 24.00 16Aug2023 08Sep2023 AR 1.99% 894,545.97
19 Ducting Installation 18.00 19Aug2023 05Sep2023 M 2.48% 1,118,054.82
20 Ceiling Framing 18.00 19Aug2023 05Sep2023 AR 1.49% 670,909.48
21 Application of primer 16.00 21Aug2023 05Sep2023 AR 1.33% 596,363.98
22 Sanitary layout 18.00 21Aug2023 07Sep2023 P 1.01% 454,455.92
23 Treatment of boundary walls 11.00 19Aug2023 29Aug2023 AR 0.91% 410,000.24
24 HVAC Stub Out 21.00 19Aug2023 08Sep2023 M 2.90% 1,304,397.29
25 Fire protection layout/piping 21.00 19Aug2023 08Sep2023 F 0.91% 408,549.71
26 Floor topping/Screeding 14.00 19Aug2023 01Sep2023 AR 1.16% 521,818.48
Electrical rough-in/above ceiling works and Wiring Installation
27 21.00 21Aug2023 10Sep2023 EE 3.02% 1,356,774.41
(Splicing)
28 Water line layout 21.00 21Aug2023 10Sep2023 P 1.18% 530,198.57
29 General floor topping or screeding 21.00 22Aug2023 11Sep2023 AR 1.74% 782,727.72
30 Electrical rough-in wall toilets and Wiring Installation (Splicing) 17.00 30Aug2023 15Sep2023 EE 2.44% 1,098,341.19
31 HVAC line/Condenser line 17.00 30Aug2023 15Sep2023 M 2.35% 1,055,940.66
32 HVAC rough-in 17.00 30Aug2023 15Sep2023 M 2.35% 1,055,940.66
33 Installation of wall boards (Enclosed) 21.00 30Aug2023 19Sep2023 AR 1.74% 782,727.72
34 Waterproofing 14.00 30Aug2023 12Sep2023 AR 1.16% 521,818.48
35 Layout of tiles works 15.00 01Sep2023 15Sep2023 AR 1.24% 559,091.23
36 Water leak test 14.00 02Sep2023 15Sep2023 AR 1.16% 521,818.48
37 Demolition Work 10.00 09Sep2023 18Sep2023 AR 0.83% 372,727.49
38 Ceiling board installation 21.00 09Sep2023 29Sep2023 AR 1.74% 782,727.72
39 Tiles Installation 21.00 09Sep2023 29Sep2023 AR 1.74% 782,727.72
40 Sprinkler Head Installation 22.00 16Sep2023 07Oct2023 AR 1.82% 820,000.47
41 Outdoor unit of ACU 22.00 16Sep2023 07Oct2023 M 3.04% 1,366,511.45
42 Installation of plumbing fixtures 22.00 16Sep2023 07Oct2023 P 1.23% 555,446.12
43 Installation of door jamb 22.00 16Sep2023 07Oct2023 AR 1.82% 820,000.47
44 Installation of window 16.00 29Sep2023 14Oct2023 AR 1.33% 596,363.98
45 Application of Second coat 19.00 29Sep2023 17Oct2023 AR 1.57% 708,182.22
46 Installation of electrical fixtures and accessories 16.00 29Sep2023 14Oct2023 EE 2.30% 1,033,732.89
47 Installation of auxiliary 14.00 08Oct2023 21Oct2023 AU 2.15% 965,790.34
48 Installation of FDAS 14.00 08Oct2023 21Oct2023 AU 2.15% 965,790.34
49 Testing and commissioning of Fire protection 8.00 11Oct2023 18Oct2023 F 0.35% 155,637.98
50 Painting works top coat 14.00 15Oct2023 28Oct2023 AR 1.16% 521,818.48
51 Installation of doors 14.00 15Oct2023 28Oct2023 AR 1.16% 521,818.48
52 Installation of ACU indoor unit 14.00 18Oct2023 31Oct2023 M 1.93% 869,598.19
53 Fixed furniture Installation 14.00 22Oct2023 04Nov2023 AR 1.16% 521,818.48
54 Installation of door System 14.00 22Oct2023 04Nov2023 AU 2.15% 965,790.34
55 Intercom System 14.00 22Oct2023 04Nov2023 AU 2.15% 965,790.34
56 Installation of Loose furniture 14.00 29Oct2023 11Nov2023 AR 1.16% 521,818.48
57 Site clearing works 18.00 29Oct2023 15Nov2023 G 0.37% 167,422.21
58 Repainting work or Retouching 11.00 05Nov2023 15Nov2023 G 0.23% 102,313.57
59 Cleaning 15.00 05Nov2023 19Nov2023 G 0.31% 139,518.51
60 Turnover request 14.00 05Nov2023 18Nov2023 G 0.29% 130,217.28
61 COC filling 14.00 05Nov2023 18Nov2023 G 0.29% 130,217.28
62 Pullout/Demobilization 8.00 12Nov2023 19Nov2023 G 0.17% 74,409.87
63 Ribbon cutting 3.00 18Nov2023 20Nov2023 G 0.06% 27,903.70
TOTAL 100.00% 45,000,000.00
PROJECTED ACCOMPLISHMENT 0.02% 0.02% 0.02% 0.19% 0.19% 0.19% 0.19% 0.19% 0.19% 0.19% 0.19% 0.19% 0.19% 0.19% 0.19% 0.19% 0.19% 0.19% 0.19% 0.19% 0.19% 0.19% 0.19% 0.19% 0.19% 0.19% 0.19% 0.19% 0.19%
PROJECTED CUMMULATIVE 0.02% 0.04% 0.06% 0.25% 0.44% 0.63% 0.82% 1.01% 1.20% 1.39% 1.58% 1.77% 1.96% 2.15% 2.34% 2.53% 2.72% 2.91% 3.10% 3.29% 3.48% 3.67% 3.86% 4.05% 4.24% 4.43% 4.62% 4.81% 5.00%
ACTUAL ACCOMPLISHMENT 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.76% 1.31% 1.05%
ACTUAL CUMMULATIVE 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.76% 2.06% 3.11%
DEVIATION -0.02% -0.04% -0.06% -0.25% -0.44% -0.63% -0.82% -1.01% -1.20% -1.39% -1.58% -1.77% -1.96% -2.15% -2.34% -2.53% -2.72% -2.91% -3.10% -3.29% -3.48% -3.67% -3.86% -4.05% -4.24% -4.43% -3.87% -2.75% -1.89%
KIRSKAT VENTURE
Manila Office: Unit 712B Tower-B The Regalia Park Towers 150 P. Tuazon Ave, Cubao, Quezon City
Landline: 0287765788
Email: kirskatventure.manila@gmail.com

June July July July July


Project Schedule Based on Actual Projected Dates
Week -05 Week -06 Week -07 Week -08 Week -09
Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu
Item No Description Duration Start Finish
25 26 27 28 29 30 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27

25-Jun-23 26-Jun-23 27-Jun-23 28-Jun-23 29-Jun-23 30-Jun-23 1-Jul-23 2-Jul-23 3-Jul-23 4-Jul-23 5-Jul-23 6-Jul-23 7-Jul-23 8-Jul-23 9-Jul-23 10-Jul-23 11-Jul-23 12-Jul-23 13-Jul-23 14-Jul-23 15-Jul-23 16-Jul-23 17-Jul-23 18-Jul-23 19-Jul-23 20-Jul-23 21-Jul-23 22-Jul-23 23-Jul-23 24-Jul-23 25-Jul-23 26-Jul-23 27-Jul-23

0 General Requirement 178.00 24Jul2023 20Nov2023 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05%
1 Wall Framing Work 67.00 24Jul2023 28Sep2023 0.43760% 0.67788% 0.5741% 0.59966% 0.59966% 0.00% 0.2544% 0.23967% 0.27630% 0.00% 0.10611% 0.20143% 0.00% 0.34243% 0.22682% 0.54546% 0.53490%
2 CHB laying 60.00 24Jul2023 21Sep2023 0.99995% 1.35041% 0.96095% 0.00% 0.00% 0.00% 0.0267% 0.28660% 0.59329% 0.43630% 0.23193% 0.9988% 0.00% 0.84940% 1.41709% 0.00% 0.00%
3 Approval for approved plan for construction (floor plan) 1.00 24Jul2023
4 Mock up of soil pipe slope (2nd Floor) 3.00 26Jul2023 28Jul2023
5 Rebar Scanning 7.00 26Jul2023 01Aug2023
6 Approval of Mechanical Plan (Shop Drawing) 7.00 27Jul2023 02Aug2023
7 Plastering works 15.00 28Jul2023 11Aug2023 2.78574%
8 Approval of Reflected Ceiling plan (with final elevations) 15.00 31Jul2023 14Aug2023
9 Approval of Shop Drawing of Coring works location 15.00 31Jul2023 14Aug2023
10 Approval of Electrical Plan and Auxillary Plan (Shop Drawing) 15.00 31Jul2023 14Aug2023
11 Approval of Shop Drawing for treatment of boundary walls 15.00 03Aug2023 17Aug2023
12 Installation Wall board Installation (One side) 22.00 05Aug2023 26Aug2023
13 Concrete neutralizer application 7.00 12Aug2023 18Aug2023
14 Coring Works 7.00 12Aug2023 18Aug2023
15 Electrical rough-in/Conduit and Wiring Installation (Splicing) 14.00 14Aug2023 27Aug2023
16 Auxiliary rough-in 14.00 14Aug2023 27Aug2023
17 FDAS rough-in 14.00 14Aug2023 27Aug2023
18 Application of skimcoat 24.00 16Aug2023 08Sep2023
19 Ducting Installation 18.00 19Aug2023 05Sep2023
20 Ceiling Framing 18.00 19Aug2023 05Sep2023
21 Application of primer 16.00 21Aug2023 05Sep2023
22 Sanitary layout 18.00 21Aug2023 07Sep2023
23 Treatment of boundary walls 11.00 19Aug2023 29Aug2023
24 HVAC Stub Out 21.00 19Aug2023 08Sep2023
25 Fire protection layout/piping 21.00 19Aug2023 08Sep2023
26 Floor topping/Screeding 14.00 19Aug2023 01Sep2023
Electrical rough-in/above ceiling works and Wiring Installation
27 21.00 21Aug2023 10Sep2023
(Splicing)
28 Water line layout 21.00 21Aug2023 10Sep2023
29 General floor topping or screeding 21.00 22Aug2023 11Sep2023
30 Electrical rough-in wall toilets and Wiring Installation (Splicing) 17.00 30Aug2023 15Sep2023
31 HVAC line/Condenser line 17.00 30Aug2023 15Sep2023
32 HVAC rough-in 17.00 30Aug2023 15Sep2023
33 Installation of wall boards (Enclosed) 21.00 30Aug2023 19Sep2023
34 Waterproofing 14.00 30Aug2023 12Sep2023
35 Layout of tiles works 15.00 01Sep2023 15Sep2023
36 Water leak test 14.00 02Sep2023 15Sep2023
37 Demolition Work 10.00 09Sep2023 18Sep2023
38 Ceiling board installation 21.00 09Sep2023 29Sep2023
39 Tiles Installation 21.00 09Sep2023 29Sep2023
40 Sprinkler Head Installation 22.00 16Sep2023 07Oct2023
41 Outdoor unit of ACU 22.00 16Sep2023 07Oct2023
42 Installation of plumbing fixtures 22.00 16Sep2023 07Oct2023
43 Installation of door jamb 22.00 16Sep2023 07Oct2023
44 Installation of window 16.00 29Sep2023 14Oct2023
45 Application of Second coat 19.00 29Sep2023 17Oct2023
46 Installation of electrical fixtures and accessories 16.00 29Sep2023 14Oct2023
47 Installation of auxiliary 14.00 08Oct2023 21Oct2023
48 Installation of FDAS 14.00 08Oct2023 21Oct2023
49 Testing and commissioning of Fire protection 8.00 11Oct2023 18Oct2023
50 Painting works top coat 14.00 15Oct2023 28Oct2023
51 Installation of doors 14.00 15Oct2023 28Oct2023
52 Installation of ACU indoor unit 14.00 18Oct2023 31Oct2023
53 Fixed furniture Installation 14.00 22Oct2023 04Nov2023
54 Installation of door System 14.00 22Oct2023 04Nov2023
55 Intercom System 14.00 22Oct2023 04Nov2023
56 Installation of Loose furniture 14.00 29Oct2023 11Nov2023
57 Site clearing works 18.00 29Oct2023 15Nov2023
58 Repainting work or Retouching 11.00 05Nov2023 15Nov2023
59 Cleaning 15.00 05Nov2023 19Nov2023
60 Turnover request 14.00 05Nov2023 18Nov2023
61 COC filling 14.00 05Nov2023 18Nov2023
62 Pullout/Demobilization 8.00 12Nov2023 19Nov2023
63 Ribbon cutting 3.00 18Nov2023 20Nov2023
TOTAL
0.19%
PROJECTED ACCOMPLISHMENT 0.19% 0.19% 0.19% 0.19% 0.19% 0.19% 0.19% 0.19% 0.19% 0.19% 0.19% 0.19% 0.19% 0.19% 0.19% 0.19% 0.19% 0.19% 0.19% 0.19% 0.19% 0.19% 0.19% 0.19% 0.19% 0.19% 0.19% 0.19% 0.27% 0.19% 0.35% 0.43%
5.19%
PROJECTED CUMMULATIVE 5.38% 5.57% 5.76% 5.95% 6.14% 6.33% 6.52% 6.71% 6.90% 7.09% 7.28% 7.47% 7.66% 7.85% 8.04% 8.23% 8.42% 8.61% 8.80% 8.99% 9.18% 9.37% 9.56% 9.75% 9.94% 10.13% 10.32% 10.51% 10.78% 10.97% 11.32% 11.75%
1.49%
ACTUAL ACCOMPLISHMENT 2.08% 1.58% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.65% 0.65% 0.05% 0.33% 0.57% 0.92% 0.48% 0.39% 1.25% 0.05% 1.24% 1.69% 0.59% 3.37%
4.60%
ACTUAL CUMMULATIVE 6.67% 8.25% 8.25% 8.25% 8.25% 8.25% 8.25% 8.25% 8.25% 8.25% 8.25% 8.25% 8.25% 8.25% 8.25% 8.25% 8.25% 8.25% 8.90% 9.55% 9.60% 9.92% 10.50% 11.41% 11.90% 12.28% 13.53% 13.58% 14.82% 16.51% 17.10% 20.47%
DEVIATION
-0.60% 1.29% 2.68% 2.49% 2.30% 2.11% 1.92% 1.73% 1.54% 1.35% 1.16% 0.97% 0.78% 0.59% 0.40% 0.21% 0.02% -0.17% -0.36% 0.10% 0.56% 0.41% 0.55% 0.94% 1.66% 1.96% 2.15% 3.21% 3.07% 4.04% 5.54% 5.78% 8.72%
KIRSKAT VENTURE
Manila Office: Unit 712B Tower-B The Regalia Park Towers 150 P. Tuazon Ave, Cubao, Quezon City
Landline: 0287765788
Email: kirskatventure.manila@gmail.com

July July - August August August August August - September


Project Schedule Based on Actual Projected Dates
Week -09 Week -10 Week -11 Week -12 Week -13 Week -14
Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue
Item No Description Duration Start Finish
28 29 30 31 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29

28-Jul-23 29-Jul-23 30-Jul-23 31-Jul-23 1-Aug-23 2-Aug-23 3-Aug-23 4-Aug-23 5-Aug-23 6-Aug-23 7-Aug-23 8-Aug-23 9-Aug-23 10-Aug-23 11-Aug-23 12-Aug-23 13-Aug-23 14-Aug-23 15-Aug-23 16-Aug-23 17-Aug-23 18-Aug-23 19-Aug-23 20-Aug-23 21-Aug-23 22-Aug-23 23-Aug-23 24-Aug-23 25-Aug-23 26-Aug-23 27-Aug-23 28-Aug-23 29-Aug-23

0 General Requirement 178.00 24Jul2023 20Nov2023 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.05% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01% 0.01%
1 Wall Framing Work 67.00 24Jul2023 28Sep2023 0.42415% 0.00000% 0.32913% 0.33197% 0.40271% 0.15925% 0.16289% 0.00% 0.05138% 0.42392% 0.00% 0.31% 0.12% 0.07% 0.07%
2 CHB laying 60.00 24Jul2023 21Sep2023 0.0000% 0.15885% 0.42640% 0.27764% 0.27773% 0.28847% 0.22%
3 Approval for approved plan for construction (floor plan) 1.00 24Jul2023
4 Mock up of soil pipe slope (2nd Floor) 3.00 26Jul2023 28Jul2023
5 Rebar Scanning 7.00 26Jul2023 01Aug2023
6 Approval of Mechanical Plan (Shop Drawing) 7.00 27Jul2023 02Aug2023
7 Plastering works 15.00 28Jul2023 11Aug2023 0.45764% 0.33826% 0.29% 0.13928% 0.11040% 0.2519% 0.24% 0.30% 0.02% 0.15% 0.04% 0.20%
8 Approval of Reflected Ceiling plan (with final elevations) 15.00 31Jul2023 14Aug2023
9 Approval of Shop Drawing of Coring works location 15.00 31Jul2023 14Aug2023
10 Approval of Electrical Plan and Auxillary Plan (Shop Drawing) 15.00 31Jul2023 14Aug2023
11 Approval of Shop Drawing for treatment of boundary walls 15.00 03Aug2023 17Aug2023
12 Installation Wall board Installation (One side) 22.00 05Aug2023 26Aug2023 0.00487% 3.78086% 0.0751% 0.0879% 0.1720% 0.27473% 0.23680% 0.16346% 0.33% 0.08% 0.06%
13 Concrete neutralizer application 7.00 12Aug2023 18Aug2023
14 Coring Works 7.00 12Aug2023 18Aug2023
15 Electrical rough-in/Conduit and Wiring Installation (Splicing) 14.00 14Aug2023 27Aug2023 0.01% 0.004% 0.02% 0.01% 0.00%
16 Auxiliary rough-in 14.00 14Aug2023 27Aug2023
17 FDAS rough-in 14.00 14Aug2023 27Aug2023
18 Application of skimcoat 24.00 16Aug2023 08Sep2023
19 Ducting Installation 18.00 19Aug2023 05Sep2023
20 Ceiling Framing 18.00 19Aug2023 05Sep2023
21 Application of primer 16.00 21Aug2023 05Sep2023
22 Sanitary layout 18.00 21Aug2023 07Sep2023
23 Treatment of boundary walls 11.00 19Aug2023 29Aug2023
24 HVAC Stub Out 21.00 19Aug2023 08Sep2023
25 Fire protection layout/piping 21.00 19Aug2023 08Sep2023
26 Floor topping/Screeding 14.00 19Aug2023 01Sep2023
Electrical rough-in/above ceiling works and Wiring Installation
27 21.00 21Aug2023 10Sep2023
(Splicing)
28 Water line layout 21.00 21Aug2023 10Sep2023
29 General floor topping or screeding 21.00 22Aug2023 11Sep2023
30 Electrical rough-in wall toilets and Wiring Installation (Splicing) 17.00 30Aug2023 15Sep2023
31 HVAC line/Condenser line 17.00 30Aug2023 15Sep2023
32 HVAC rough-in 17.00 30Aug2023 15Sep2023
33 Installation of wall boards (Enclosed) 21.00 30Aug2023 19Sep2023 0.25707% 0.1679% 0.3410% 0.1102% 0.02%
34 Waterproofing 14.00 30Aug2023 12Sep2023
35 Layout of tiles works 15.00 01Sep2023 15Sep2023
36 Water leak test 14.00 02Sep2023 15Sep2023
37 Demolition Work 10.00 09Sep2023 18Sep2023
38 Ceiling board installation 21.00 09Sep2023 29Sep2023
39 Tiles Installation 21.00 09Sep2023 29Sep2023
40 Sprinkler Head Installation 22.00 16Sep2023 07Oct2023
41 Outdoor unit of ACU 22.00 16Sep2023 07Oct2023
42 Installation of plumbing fixtures 22.00 16Sep2023 07Oct2023
43 Installation of door jamb 22.00 16Sep2023 07Oct2023
44 Installation of window 16.00 29Sep2023 14Oct2023
45 Application of Second coat 19.00 29Sep2023 17Oct2023
46 Installation of electrical fixtures and accessories 16.00 29Sep2023 14Oct2023
47 Installation of auxiliary 14.00 08Oct2023 21Oct2023
48 Installation of FDAS 14.00 08Oct2023 21Oct2023
49 Testing and commissioning of Fire protection 8.00 11Oct2023 18Oct2023
50 Painting works top coat 14.00 15Oct2023 28Oct2023
51 Installation of doors 14.00 15Oct2023 28Oct2023
52 Installation of ACU indoor unit 14.00 18Oct2023 31Oct2023
53 Fixed furniture Installation 14.00 22Oct2023 04Nov2023
54 Installation of door System 14.00 22Oct2023 04Nov2023
55 Intercom System 14.00 22Oct2023 04Nov2023
56 Installation of Loose furniture 14.00 29Oct2023 11Nov2023
57 Site clearing works 18.00 29Oct2023 15Nov2023
58 Repainting work or Retouching 11.00 05Nov2023 15Nov2023
59 Cleaning 15.00 05Nov2023 19Nov2023
60 Turnover request 14.00 05Nov2023 18Nov2023
61 COC filling 14.00 05Nov2023 18Nov2023
62 Pullout/Demobilization 8.00 12Nov2023 19Nov2023
63 Ribbon cutting 3.00 18Nov2023 20Nov2023
TOTAL
0.52%
PROJECTED ACCOMPLISHMENT 0.35% 0.35% 0.66% 0.66% 0.58% 0.64% 0.64% 0.64% 0.64% 0.64% 0.64% 0.64% 0.64% 0.64% 0.70% 0.70% 1.15% 0.84% 0.92% 0.92% 0.78% 1.20% 1.20% 1.54% 1.63% 1.63% 1.63% 1.63% 1.63% 1.54% 1.09% 1.09%
12.27%
PROJECTED CUMMULATIVE 12.62% 12.97% 13.63% 14.29% 14.87% 15.51% 16.15% 16.79% 17.43% 18.07% 18.71% 19.35% 19.99% 20.63% 21.33% 22.03% 23.18% 24.02% 24.94% 25.86% 26.64% 27.84% 29.04% 30.58% 32.21% 33.84% 35.47% 37.10% 38.73% 40.27% 41.36% 42.45%
0.47%
ACTUAL ACCOMPLISHMENT 0.05% 0.38% 0.38% 0.91% 0.55% 0.51% 3.99% 0.60% 0.41% 0.36% 0.32% 0.28% 0.21% 0.80% 0.58% 0.50% 0.50% 0.41% 0.58% 0.44% 0.08% 0.12% 0.17% 0.27% 0.29% 0.07% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
20.94%
ACTUAL CUMMULATIVE 20.99% 21.37% 21.75% 22.65% 23.20% 23.71% 27.69% 28.30% 28.71% 29.07% 29.39% 29.67% 29.88% 30.69% 31.27% 31.77% 32.27% 32.68% 33.26% 33.70% 33.79% 33.90% 34.07% 34.35% 34.63% 34.71%
DEVIATION8.67% 8.37% 8.40% 8.11% 8.36% 8.33% 8.20% 11.54% 11.50% 11.28% 10.99% 10.68% 10.32% 9.89% 10.05% 9.94% 9.74% 9.09% 8.66% 8.32% 7.84% 7.14% 6.06% 5.03% 3.77% 2.42% 0.87%
KIRSKAT VENTURE
Manila Office: Unit 712B Tower-B The Regalia Park Towers 150 P. Tuazon Ave, Cubao, Quezon City
Landline: 0287765788
Email: kirskatventure.manila@gmail.com

August - September September September September September Septem


Project Schedule Based on Actual Projected Dates
Week -14 Week -15 Week -16 Week -17 Week -18
Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun
Item No Description Duration Start Finish
30 31 01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 01

30-Aug-23 31-Aug-23 1-Sep-23 2-Sep-23 3-Sep-23 4-Sep-23 5-Sep-23 6-Sep-23 7-Sep-23 8-Sep-23 9-Sep-23 10-Sep-23 11-Sep-23 12-Sep-23 13-Sep-23 14-Sep-23 15-Sep-23 16-Sep-23 17-Sep-23 18-Sep-23 19-Sep-23 20-Sep-23 21-Sep-23 22-Sep-23 23-Sep-23 24-Sep-23 25-Sep-23 26-Sep-23 27-Sep-23 28-Sep-23 29-Sep-23 30-Sep-23 1-Oct-23

0 General Requirement 178.00 24Jul2023 20Nov2023


1 Wall Framing Work 67.00 24Jul2023 28Sep2023
2 CHB laying 60.00 24Jul2023 21Sep2023
3 Approval for approved plan for construction (floor plan) 1.00 24Jul2023
4 Mock up of soil pipe slope (2nd Floor) 3.00 26Jul2023 28Jul2023
5 Rebar Scanning 7.00 26Jul2023 01Aug2023
6 Approval of Mechanical Plan (Shop Drawing) 7.00 27Jul2023 02Aug2023
7 Plastering works 15.00 28Jul2023 11Aug2023
8 Approval of Reflected Ceiling plan (with final elevations) 15.00 31Jul2023 14Aug2023
9 Approval of Shop Drawing of Coring works location 15.00 31Jul2023 14Aug2023
10 Approval of Electrical Plan and Auxillary Plan (Shop Drawing) 15.00 31Jul2023 14Aug2023
11 Approval of Shop Drawing for treatment of boundary walls 15.00 03Aug2023 17Aug2023
12 Installation Wall board Installation (One side) 22.00 05Aug2023 26Aug2023
13 Concrete neutralizer application 7.00 12Aug2023 18Aug2023
14 Coring Works 7.00 12Aug2023 18Aug2023
15 Electrical rough-in/Conduit and Wiring Installation (Splicing) 14.00 14Aug2023 27Aug2023
16 Auxiliary rough-in 14.00 14Aug2023 27Aug2023
17 FDAS rough-in 14.00 14Aug2023 27Aug2023
18 Application of skimcoat 24.00 16Aug2023 08Sep2023
19 Ducting Installation 18.00 19Aug2023 05Sep2023
20 Ceiling Framing 18.00 19Aug2023 05Sep2023
21 Application of primer 16.00 21Aug2023 05Sep2023
22 Sanitary layout 18.00 21Aug2023 07Sep2023
23 Treatment of boundary walls 11.00 19Aug2023 29Aug2023
24 HVAC Stub Out 21.00 19Aug2023 08Sep2023
25 Fire protection layout/piping 21.00 19Aug2023 08Sep2023
26 Floor topping/Screeding 14.00 19Aug2023 01Sep2023
Electrical rough-in/above ceiling works and Wiring Installation
27 21.00 21Aug2023 10Sep2023
(Splicing)
28 Water line layout 21.00 21Aug2023 10Sep2023
29 General floor topping or screeding 21.00 22Aug2023 11Sep2023
30 Electrical rough-in wall toilets and Wiring Installation (Splicing) 17.00 30Aug2023 15Sep2023
31 HVAC line/Condenser line 17.00 30Aug2023 15Sep2023
32 HVAC rough-in 17.00 30Aug2023 15Sep2023
33 Installation of wall boards (Enclosed) 21.00 30Aug2023 19Sep2023
34 Waterproofing 14.00 30Aug2023 12Sep2023
35 Layout of tiles works 15.00 01Sep2023 15Sep2023
36 Water leak test 14.00 02Sep2023 15Sep2023
37 Demolition Work 10.00 09Sep2023 18Sep2023
38 Ceiling board installation 21.00 09Sep2023 29Sep2023
39 Tiles Installation 21.00 09Sep2023 29Sep2023
40 Sprinkler Head Installation 22.00 16Sep2023 07Oct2023
41 Outdoor unit of ACU 22.00 16Sep2023 07Oct2023
42 Installation of plumbing fixtures 22.00 16Sep2023 07Oct2023
43 Installation of door jamb 22.00 16Sep2023 07Oct2023
44 Installation of window 16.00 29Sep2023 14Oct2023
45 Application of Second coat 19.00 29Sep2023 17Oct2023
46 Installation of electrical fixtures and accessories 16.00 29Sep2023 14Oct2023
47 Installation of auxiliary 14.00 08Oct2023 21Oct2023
48 Installation of FDAS 14.00 08Oct2023 21Oct2023
49 Testing and commissioning of Fire protection 8.00 11Oct2023 18Oct2023
50 Painting works top coat 14.00 15Oct2023 28Oct2023
51 Installation of doors 14.00 15Oct2023 28Oct2023
52 Installation of ACU indoor unit 14.00 18Oct2023 31Oct2023
53 Fixed furniture Installation 14.00 22Oct2023 04Nov2023
54 Installation of door System 14.00 22Oct2023 04Nov2023
55 Intercom System 14.00 22Oct2023 04Nov2023
56 Installation of Loose furniture 14.00 29Oct2023 11Nov2023
57 Site clearing works 18.00 29Oct2023 15Nov2023
58 Repainting work or Retouching 11.00 05Nov2023 15Nov2023
59 Cleaning 15.00 05Nov2023 19Nov2023
60 Turnover request 14.00 05Nov2023 18Nov2023
61 COC filling 14.00 05Nov2023 18Nov2023
62 Pullout/Demobilization 8.00 12Nov2023 19Nov2023
63 Ribbon cutting 3.00 18Nov2023 20Nov2023
TOTAL
1.60%
PROJECTED ACCOMPLISHMENT 1.60% 1.68% 1.68% 1.68% 1.68% 1.68% 1.37% 1.37% 1.32% 1.30% 1.30% 1.10% 1.02% 0.94% 0.94% 0.94% 0.71% 0.71% 0.71% 0.63% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.55% 0.86% 0.69% 0.69%
44.05%
PROJECTED CUMMULATIVE 45.65% 47.33% 49.01% 50.69% 52.37% 54.05% 55.42% 56.79% 58.11% 59.41% 60.71% 61.81% 62.83% 63.77% 64.71% 65.65% 66.36% 67.07% 67.78% 68.41% 68.96% 69.51% 70.06% 70.61% 71.16% 71.71% 72.26% 72.81% 73.36% 74.22% 74.91% 75.60%
0.00%
ACTUAL ACCOMPLISHMENT 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
ACTUAL CUMMULATIVE
DEVIATION
KIRSKAT VENTURE
Manila Office: Unit 712B Tower-B The Regalia Park Towers 150 P. Tuazon Ave, Cubao, Quezon City
Landline: 0287765788
Email: kirskatventure.manila@gmail.com

September - October October October October October - November


Project Schedule Based on Actual Projected Dates
Week -19 Week -20 Week -21 Week -22 Week -23
Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri
Item No Description Duration Start Finish
02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 01 02 03

2-Oct-23 3-Oct-23 4-Oct-23 5-Oct-23 6-Oct-23 7-Oct-23 8-Oct-23 9-Oct-23 10-Oct-23 11-Oct-23 12-Oct-23 13-Oct-23 14-Oct-23 15-Oct-23 16-Oct-23 17-Oct-23 18-Oct-23 19-Oct-23 20-Oct-23 21-Oct-23 22-Oct-23 23-Oct-23 24-Oct-23 25-Oct-23 26-Oct-23 27-Oct-23 28-Oct-23 29-Oct-23 30-Oct-23 31-Oct-23 1-Nov-23 2-Nov-23 3-Nov-23

0 General Requirement 178.00 24Jul2023 20Nov2023


1 Wall Framing Work 67.00 24Jul2023 28Sep2023
2 CHB laying 60.00 24Jul2023 21Sep2023
3 Approval for approved plan for construction (floor plan) 1.00 24Jul2023
4 Mock up of soil pipe slope (2nd Floor) 3.00 26Jul2023 28Jul2023
5 Rebar Scanning 7.00 26Jul2023 01Aug2023
6 Approval of Mechanical Plan (Shop Drawing) 7.00 27Jul2023 02Aug2023
7 Plastering works 15.00 28Jul2023 11Aug2023
8 Approval of Reflected Ceiling plan (with final elevations) 15.00 31Jul2023 14Aug2023
9 Approval of Shop Drawing of Coring works location 15.00 31Jul2023 14Aug2023
10 Approval of Electrical Plan and Auxillary Plan (Shop Drawing) 15.00 31Jul2023 14Aug2023
11 Approval of Shop Drawing for treatment of boundary walls 15.00 03Aug2023 17Aug2023
12 Installation Wall board Installation (One side) 22.00 05Aug2023 26Aug2023
13 Concrete neutralizer application 7.00 12Aug2023 18Aug2023
14 Coring Works 7.00 12Aug2023 18Aug2023
15 Electrical rough-in/Conduit and Wiring Installation (Splicing) 14.00 14Aug2023 27Aug2023
16 Auxiliary rough-in 14.00 14Aug2023 27Aug2023
17 FDAS rough-in 14.00 14Aug2023 27Aug2023
18 Application of skimcoat 24.00 16Aug2023 08Sep2023
19 Ducting Installation 18.00 19Aug2023 05Sep2023
20 Ceiling Framing 18.00 19Aug2023 05Sep2023
21 Application of primer 16.00 21Aug2023 05Sep2023
22 Sanitary layout 18.00 21Aug2023 07Sep2023
23 Treatment of boundary walls 11.00 19Aug2023 29Aug2023
24 HVAC Stub Out 21.00 19Aug2023 08Sep2023
25 Fire protection layout/piping 21.00 19Aug2023 08Sep2023
26 Floor topping/Screeding 14.00 19Aug2023 01Sep2023
Electrical rough-in/above ceiling works and Wiring Installation
27 21.00 21Aug2023 10Sep2023
(Splicing)
28 Water line layout 21.00 21Aug2023 10Sep2023
29 General floor topping or screeding 21.00 22Aug2023 11Sep2023
30 Electrical rough-in wall toilets and Wiring Installation (Splicing) 17.00 30Aug2023 15Sep2023
31 HVAC line/Condenser line 17.00 30Aug2023 15Sep2023
32 HVAC rough-in 17.00 30Aug2023 15Sep2023
33 Installation of wall boards (Enclosed) 21.00 30Aug2023 19Sep2023
34 Waterproofing 14.00 30Aug2023 12Sep2023
35 Layout of tiles works 15.00 01Sep2023 15Sep2023
36 Water leak test 14.00 02Sep2023 15Sep2023
37 Demolition Work 10.00 09Sep2023 18Sep2023
38 Ceiling board installation 21.00 09Sep2023 29Sep2023
39 Tiles Installation 21.00 09Sep2023 29Sep2023
40 Sprinkler Head Installation 22.00 16Sep2023 07Oct2023
41 Outdoor unit of ACU 22.00 16Sep2023 07Oct2023
42 Installation of plumbing fixtures 22.00 16Sep2023 07Oct2023
43 Installation of door jamb 22.00 16Sep2023 07Oct2023
44 Installation of window 16.00 29Sep2023 14Oct2023
45 Application of Second coat 19.00 29Sep2023 17Oct2023
46 Installation of electrical fixtures and accessories 16.00 29Sep2023 14Oct2023
47 Installation of auxiliary 14.00 08Oct2023 21Oct2023
48 Installation of FDAS 14.00 08Oct2023 21Oct2023
49 Testing and commissioning of Fire protection 8.00 11Oct2023 18Oct2023
50 Painting works top coat 14.00 15Oct2023 28Oct2023
51 Installation of doors 14.00 15Oct2023 28Oct2023
52 Installation of ACU indoor unit 14.00 18Oct2023 31Oct2023
53 Fixed furniture Installation 14.00 22Oct2023 04Nov2023
54 Installation of door System 14.00 22Oct2023 04Nov2023
55 Intercom System 14.00 22Oct2023 04Nov2023
56 Installation of Loose furniture 14.00 29Oct2023 11Nov2023
57 Site clearing works 18.00 29Oct2023 15Nov2023
58 Repainting work or Retouching 11.00 05Nov2023 15Nov2023
59 Cleaning 15.00 05Nov2023 19Nov2023
60 Turnover request 14.00 05Nov2023 18Nov2023
61 COC filling 14.00 05Nov2023 18Nov2023
62 Pullout/Demobilization 8.00 12Nov2023 19Nov2023
63 Ribbon cutting 3.00 18Nov2023 20Nov2023
TOTAL
0.69%
PROJECTED ACCOMPLISHMENT 0.69% 0.69% 0.69% 0.69% 0.69% 0.64% 0.64% 0.64% 0.68% 0.68% 0.68% 0.68% 0.62% 0.62% 0.62% 0.67% 0.63% 0.63% 0.63% 0.71% 0.71% 0.71% 0.71% 0.71% 0.71% 0.71% 0.65% 0.65% 0.65% 0.51% 0.51% 0.51%
76.29%
PROJECTED CUMMULATIVE 76.98% 77.67% 78.36% 79.05% 79.74% 80.38% 81.02% 81.66% 82.34% 83.02% 83.70% 84.38% 85.00% 85.62% 86.24% 86.91% 87.54% 88.17% 88.80% 89.51% 90.22% 90.93% 91.64% 92.35% 93.06% 93.77% 94.42% 95.07% 95.72% 96.23% 96.74% 97.25%
0.00%
ACTUAL ACCOMPLISHMENT 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
ACTUAL CUMMULATIVE
DEVIATION
KIRSKAT VENTURE
Manila Office: Unit 712B Tower-B The Regalia Park Towers 150 P. Tuazon Ave, Cubao, Quezon City
Landline: 0287765788
Email: kirskatventure.manila@gmail.com

November November
Project Schedule Based on Actual Projected Dates
Week -24 Week -25 Week -26
Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon Tue Wed Thu Fri Sat Sun Mon
Item No Description Duration Start Finish
04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20

4-Nov-23 5-Nov-23 6-Nov-23 7-Nov-23 8-Nov-23 9-Nov-23 10-Nov-23 11-Nov-23 12-Nov-23 13-Nov-23 14-Nov-23 15-Nov-23 16-Nov-23 17-Nov-23 18-Nov-23 19-Nov-23 20-Nov-23

0 General Requirement 178.00 24Jul2023 20Nov2023


1 Wall Framing Work 67.00 24Jul2023 28Sep2023
2 CHB laying 60.00 24Jul2023 21Sep2023
3 Approval for approved plan for construction (floor plan) 1.00 24Jul2023
4 Mock up of soil pipe slope (2nd Floor) 3.00 26Jul2023 28Jul2023
5 Rebar Scanning 7.00 26Jul2023 01Aug2023
6 Approval of Mechanical Plan (Shop Drawing) 7.00 27Jul2023 02Aug2023
7 Plastering works 15.00 28Jul2023 11Aug2023
8 Approval of Reflected Ceiling plan (with final elevations) 15.00 31Jul2023 14Aug2023
9 Approval of Shop Drawing of Coring works location 15.00 31Jul2023 14Aug2023
10 Approval of Electrical Plan and Auxillary Plan (Shop Drawing) 15.00 31Jul2023 14Aug2023
11 Approval of Shop Drawing for treatment of boundary walls 15.00 03Aug2023 17Aug2023
12 Installation Wall board Installation (One side) 22.00 05Aug2023 26Aug2023
13 Concrete neutralizer application 7.00 12Aug2023 18Aug2023
14 Coring Works 7.00 12Aug2023 18Aug2023
15 Electrical rough-in/Conduit and Wiring Installation (Splicing) 14.00 14Aug2023 27Aug2023
16 Auxiliary rough-in 14.00 14Aug2023 27Aug2023
17 FDAS rough-in 14.00 14Aug2023 27Aug2023
18 Application of skimcoat 24.00 16Aug2023 08Sep2023
19 Ducting Installation 18.00 19Aug2023 05Sep2023
20 Ceiling Framing 18.00 19Aug2023 05Sep2023
21 Application of primer 16.00 21Aug2023 05Sep2023
22 Sanitary layout 18.00 21Aug2023 07Sep2023
23 Treatment of boundary walls 11.00 19Aug2023 29Aug2023
24 HVAC Stub Out 21.00 19Aug2023 08Sep2023
25 Fire protection layout/piping 21.00 19Aug2023 08Sep2023
26 Floor topping/Screeding 14.00 19Aug2023 01Sep2023
Electrical rough-in/above ceiling works and Wiring Installation
27 21.00 21Aug2023 10Sep2023
(Splicing)
28 Water line layout 21.00 21Aug2023 10Sep2023
29 General floor topping or screeding 21.00 22Aug2023 11Sep2023
30 Electrical rough-in wall toilets and Wiring Installation (Splicing) 17.00 30Aug2023 15Sep2023
31 HVAC line/Condenser line 17.00 30Aug2023 15Sep2023
32 HVAC rough-in 17.00 30Aug2023 15Sep2023
33 Installation of wall boards (Enclosed) 21.00 30Aug2023 19Sep2023
34 Waterproofing 14.00 30Aug2023 12Sep2023
35 Layout of tiles works 15.00 01Sep2023 15Sep2023
36 Water leak test 14.00 02Sep2023 15Sep2023
37 Demolition Work 10.00 09Sep2023 18Sep2023
38 Ceiling board installation 21.00 09Sep2023 29Sep2023
39 Tiles Installation 21.00 09Sep2023 29Sep2023
40 Sprinkler Head Installation 22.00 16Sep2023 07Oct2023
41 Outdoor unit of ACU 22.00 16Sep2023 07Oct2023
42 Installation of plumbing fixtures 22.00 16Sep2023 07Oct2023
43 Installation of door jamb 22.00 16Sep2023 07Oct2023
44 Installation of window 16.00 29Sep2023 14Oct2023
45 Application of Second coat 19.00 29Sep2023 17Oct2023
46 Installation of electrical fixtures and accessories 16.00 29Sep2023 14Oct2023
47 Installation of auxiliary 14.00 08Oct2023 21Oct2023
48 Installation of FDAS 14.00 08Oct2023 21Oct2023
49 Testing and commissioning of Fire protection 8.00 11Oct2023 18Oct2023
50 Painting works top coat 14.00 15Oct2023 28Oct2023
51 Installation of doors 14.00 15Oct2023 28Oct2023
52 Installation of ACU indoor unit 14.00 18Oct2023 31Oct2023
53 Fixed furniture Installation 14.00 22Oct2023 04Nov2023
54 Installation of door System 14.00 22Oct2023 04Nov2023
55 Intercom System 14.00 22Oct2023 04Nov2023
56 Installation of Loose furniture 14.00 29Oct2023 11Nov2023
57 Site clearing works 18.00 29Oct2023 15Nov2023
58 Repainting work or Retouching 11.00 05Nov2023 15Nov2023
59 Cleaning 15.00 05Nov2023 19Nov2023
60 Turnover request 14.00 05Nov2023 18Nov2023
61 COC filling 14.00 05Nov2023 18Nov2023
62 Pullout/Demobilization 8.00 12Nov2023 19Nov2023
63 Ribbon cutting 3.00 18Nov2023 20Nov2023
TOTAL
0.51%
PROJECTED ACCOMPLISHMENT 0.21% 0.21% 0.21% 0.21% 0.21% 0.21% 0.21% 0.14% 0.14% 0.14% 0.14% 0.10% 0.10% 0.12% 0.08% 0.04%
97.76%
PROJECTED CUMMULATIVE 97.97% 98.18% 98.39% 98.60% 98.81% 99.02% 99.23% 99.37% 99.51% 99.65% 99.79% 99.89% 99.99% 100.11% 100.19% 100.23%
0.00%
ACTUAL ACCOMPLISHMENT 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00% 0.00%
ACTUAL CUMMULATIVE
DEVIATION
G 261 Err:509 Err:509
AR 574 Err:509 Err:509
EE 98 Err:509 Err:509
P 68 Err:509 Err:509
M 109 Err:509 Err:509
F 29 Err:509 Err:509
AU 84 Err:509 Err:509
1223 Err:509
Item No. Description Quantity Unit Weight %

1 General Requirements 1.00 ls 5.39%


2 Architectural Works 1.00 ls
Wall Finishes 17.84%
Ceiling Finishes 7.02%
Floor Finishes 3.73%
Doors & Windows 6.32%
Restoration Works 0.15%
3 Equipment and Furniture 1.00 ls 7.32%
4 Plumbing Works 1.00 ls 3.82%
Layout & Roughing-ins (Pipe Laying)
5 Electrical Works 1.00 ls 14.07%
Layout & Roughing-ins (Pipe Laying)
6 Mechanical Works 1.00 ls 15.05%
ACCU Unit
7 Fire Protection Works 1.00 ls 1.25%
Layout & Roughing-ins (Pipe Laying)
8 Auxiliary Works 1.00 ls 12.88%
Layout & Roughing-ins (Pipe Laying)
10 Loose Furnitures 1.00 ls 3.34%
12 Plan Augmentation 1.00 ls 1.83%
TOTAL 100%
Progress Accomplishment
Previous Present To Date
% % %
4.32%

12.49%
1.75%
0.19%
1.26%
0.11%
0% 0% 0%

1.34%

5.63%

6.77%

0.50%

5.15%
0%
0.55%
40.05% 0.00% 0.00%
HEALTH CARE PROJECT
Progress Accomplishment
Item No. Description Weight % As of August 23, 2023
%
1 General Requirements 5.39% 4.32%
2 Architectural Works
Wall Finishes 17.84% 15.14%
Ceiling Finishes 7.02% 1.02%
Floor Finishes 3.73% 0.19%
Doors & Windows 6.32% 1.26%
Restoration Works 0.15% 0.11%
3 Equipment and Furniture 7.32% 0%
4 Plumbing Works 3.82%
Layout & Roughing-ins (Pipe Laying) 0.03%
5 Electrical Works 14.07%
Layout & Roughing-ins (Pipe Laying) 5.63%
6 Mechanical Works 15.05%
ACCU Unit 0.00%
7 Fire Protection Works 1.25%
Layout & Roughing-ins (Pipe Laying) 0.00%
8 Auxiliary Works 12.88%
Layout & Roughing-ins (Pipe Laying) 5.15%
10 Loose Furnitures 3.34% 0%
12 Plan Augmentation 1.83% 0.55%
TOTAL 100% 33.40%
Activity Activity Description Predecessor
A General Requirement -
B Wall Framing Work A
C CHB laying A
D Approval for approved plan for construction (floor plan) A
E Mock up of soil pipe slope (2nd Floor) D
F Rebar Scanning D
G Approval of Mechanical Plan (Shop Drawing) A
H Plastering works C
I Approval of Reflected Ceiling plan (with final elevations) A
J Approval of Shop Drawing of Coring works location A
K Approval of Electrical Plan and Auxillary Plan (Shop Drawing) A

L Approval of Shop Drawing for treatment of boundary walls A


M Installation Wall board Installation (One side)
N Concrete neutralizer application H
O Coring Works J
P Electrical rough-in/Conduit and Wiring Installation (Splicing)
Q Auxiliary rough-in
R FDAS rough-in
S Application of skimcoat
T Ducting Installation
U Ceiling Framing
V Application of primer N
W Sanitary layout
X Treatment of boundary walls
Y HVAC Stub Out
Z Fire protection layout/piping
AA Floor topping/Screeding
Electrical rough-in/above ceiling works and Wiring Installation
AB
(Splicing)
AC Water line layout
AD General floor topping or screeding
Electrical rough-in wall toilets and Wiring Installation
AE
(Splicing)
AF HVAC line/Condenser line
AG HVAC rough-in
AH Installation of wall boards (Enclosed)
AI Waterproofing
AJ Layout of tiles works
AK Water leak test
AL Demolition Work
AM Ceiling board installation
AN Tiles Installation
AO Sprinkler Head Installation
AP Outdoor unit of ACU
AQ Installation of plumbing fixtures
AR Installation of door jamb
AS Installation of window
AT Application of Second coat
AU Installation of electrical fixtures and accessories
AV Installation of auxiliary
AW Installation of FDAS
AX Testing and commissioning of Fire protection
AY Painting works top coat
AZ Installation of doors
BA Installation of ACU indoor unit
BB Fixed furniture Installation
BC Installation of door System
BD Intercom System
BE Installation of Loose furniture
BF Site clearing works
BG Repainting work or Retouching BF
BH Cleaning BF
BI Turnover request BF
BJ COC filling
BK Pullout/Demobilization
BL Ribbon cutting BL

Activity Activity Description Predecessor


A General Requirement -
B Approval for approved plan for construction (floor plan) -
C Wall Framing Work B
D CHB laying B
E Mock up of soil pipe slope (2nd Floor) B
F Rebar Scanning E
G Approval of Mechanical Plan (Shop Drawing) -
H Plastering works D
I Approval of Reflected Ceiling plan (with final elevations) C,D
J Approval of Shop Drawing of Coring works location F
K Approval of Electrical Plan and Auxillary Plan (Shop Drawing) -

L Approval of Shop Drawing for treatment of boundary walls -


M Installation Wall board Installation (One side) C
N Concrete neutralizer application H
O Coring Works J
P Electrical rough-in/Conduit and Wiring Installation (Splicing) K
Q Auxiliary rough-in K
R FDAS rough-in K
S Application of skimcoat N
T Ducting Installation G
U Ceiling Framing P,Q,R,S, AB
V Application of primer N
W Sanitary layout O
X Treatment of boundary walls
Y HVAC Stub Out H
Z Fire protection layout/piping R
AA Floor topping/Screeding AC,W
Electrical rough-in/above ceiling works and Wiring Installation
AB K
(Splicing)
AC Water line layout O
AD General floor topping or screeding AA
Electrical rough-in wall toilets and Wiring Installation
AE K
(Splicing)
AF HVAC line/Condenser line Y
AG HVAC rough-in Y
AH Installation of wall boards (Enclosed) AG, P
AI Waterproofing AD
AJ Layout of tiles works AK
AK Water leak test AI
AL Demolition Work
AM Ceiling board installation U
AN Tiles Installation AJ
AO Sprinkler Head Installation AM
AP Outdoor unit of ACU AG
AQ Installation of plumbing fixtures W, AC, AN
AR Installation of door jamb H
AS Installation of window H
AT Application of Second coat V
AU Installation of electrical fixtures and accessories P
AV Installation of auxiliary Q
AW Installation of FDAS R
AX Testing and commissioning of Fire protection AW
AY Painting works top coat AR,AS,AT
AZ Installation of doors AR
BA Installation of ACU indoor unit AG
BB Fixed furniture Installation BA
BC Installation of door System AZ
BD Intercom System BC,AV
BE Installation of Loose furniture BD
BF Site clearing works BE
BG Repainting work or Retouching BF
BH Cleaning BG
BI Turnover request BH
BJ COC filling BI
BK Pullout/Demobilization BJ
BL Ribbon cutting BK
Duration
178.00
67.00
60.00
1.00
3.00
7.00
7.00
15.00
15.00
15.00
15.00

15.00
22.00
7.00
7.00
14.00
14.00
14.00
24.00
18.00
18.00
16.00
18.00
11.00
21.00
21.00
14.00
21.00
21.00
21.00
17.00
17.00
17.00
21.00
14.00
15.00
14.00
10.00
21.00
21.00
22.00
22.00
22.00
22.00
16.00
19.00
16.00
14.00
14.00
8.00
14.00
14.00
14.00
14.00
14.00
14.00
14.00
18.00
11.00
15.00
14.00
14.00
8.00
3.00

Duration
178.00
1.00
67.00
60.00
3.00
7.00
7.00
15.00
15.00
15.00
15.00

15.00
22.00
7.00
7.00
14.00
14.00
14.00
24.00
18.00
18.00
16.00
18.00
11.00
21.00
21.00
14.00
21.00
21.00
21.00
17.00
17.00
17.00
21.00
14.00
15.00
14.00
10.00
21.00
21.00
22.00
22.00
22.00
22.00
16.00
19.00
16.00
14.00
14.00
8.00
14.00
14.00
14.00
14.00
14.00
14.00
14.00
18.00
11.00
15.00
14.00
14.00
8.00
3.00
Descriptio
Item No Manhours Manpower Duration
n

General
0 Requirem 4,272.00 178.00
ent
Wall
1 Framing 1,608.00 67.00
Work
CHB
2 1,440.00 60.00
laying
Approval
for
approved
3 plan for 1.00
constructio
n (floor
plan)

Mock up
of soil pipe
4 120.00 2.00 3.00
slope (2nd
Floor)

Rebar
5 0.00 0.00 7.00
Scanning
Approval
of
Mechanica
6 0.00 0.00 7.00
l Plan
(Shop
Drawing)
Plastering
7 0.00 0.00 15.00
works

Approval
of
Reflected
8 Ceiling 0.00 0.00 15.00
plan (with
final
elevations)
Approval
of Shop
Drawing of
9 0.00 0.00 15.00
Coring
works
location

Approval
of
Electrical
Plan and
10 0.00 0.00 15.00
Auxillary
Plan
(Shop
Drawing)

Approval
of Shop
Drawing
for
11 0.00 0.00 15.00
treatment
of
boundary
walls

Installation
Wall board
12 2,640.00 6.00 22.00
Installation
(One side)

Concrete
13 neutralizer 0.00 0.00 7.00
application

Coring
14 420.00 3.00 7.00
Works

Electrical
rough-in/C
onduit and
15 1,120.00 4.00 14.00
Wiring
Installation
(Splicing)
Auxiliary
16 1,120.00 4.00 14.00
rough-in
FDAS
17 1,120.00 4.00 14.00
rough-in
Applicatio
18 n of 0.00 0.00 24.00
skimcoat

Ducting
19 1,440.00 4.00 18.00
Installation

Ceiling
20 2,160.00 6.00 18.00
Framing

Applicatio
21 0.00 0.00 16.00
n of primer

Sanitary
22 1,440.00 4.00 18.00
layout
Treatment
of
23 880.00 4.00 11.00
boundary
walls
24 HVAC Stub 1,680.00 4.00 21.00
25 Fire protect 1,680.00 4.00 21.00
Floor
26 topping/Sc 1,680.00 6.00 14.00
reeding

Electrical
rough-in/a
bove
ceiling
27 1,680.00 4.00 21.00
works and
Wiring
Installation
(Splicing)

Water line
28 1,680.00 4.00 21.00
layout
General
floor
29 1,680.00 4.00 21.00
topping or
screeding
Electrical
rough-in
wall toilets
30 1,360.00 4.00 17.00
and Wiring
Installation
(Splicing)

HVAC
31 line/Conde 1,360.00 4.00 17.00
nser line
HVAC
32 1,360.00 4.00 17.00
rough-in

Installation
of wall
33 2,520.00 6.00 21.00
boards
(Enclosed)

Waterproo
34 840.00 3.00 14.00
fing

Layout of
35 600.00 2.00 15.00
tiles works

Water leak
36 560.00 2.00 14.00
test
Demolition
37 0.00 0.00 10.00
Work

Ceiling
38 board 1,680.00 4.00 21.00
installation

Tiles
39 2,520.00 6.00 21.00
Installation

Sprinkler
40 Head 1,760.00 4.00 22.00
Installation

Outdoor
41 unit of 1,760.00 4.00 22.00
ACU
Installation
of
42 1,760.00 4.00 22.00
plumbing
fixtures
Installation
43 of door 1,760.00 4.00 22.00
jamb

Installation
44 1,280.00 4.00 16.00
of window

Applicatio
n of
45 1,520.00 4.00 19.00
Second
coat
Installation
of
electrical
46 fixtures 1,280.00 4.00 16.00
and
accessorie
s

Installation
47 1,120.00 4.00 14.00
of auxiliary

Installation
48 1,120.00 4.00 14.00
of FDAS

Testing
and
commissio
49 320.00 2.00 8.00
ning of
Fire
protection
Painting
50 works top 1,120.00 4.00 14.00
coat

Installation
51 1,120.00 4.00 14.00
of doors

Installation
52 of ACU 1,120.00 4.00 14.00
indoor unit
Fixed
53 furniture 1,120.00 4.00 14.00
Installation

Installation
54 of door 1,120.00 4.00 14.00
System
Intercom
55 1,120.00 4.00 14.00
System

Installation
56 of Loose 1,120.00 4.00 14.00
furniture

Site
57 clearing 1,440.00 4.00 18.00
works
Repainting
work or
58 440.00 2.00 11.00
Retouchin
g
59 Cleaning 600.00 2.00 15.00
Turnover
60 0.00 0.00 14.00
request
61 COC filling 0.00 0.00 14.00

Pullout/
62 Demobiliz 0.00 0.00 8.00
ation
Ribbon
63 0.00 0.00 3.00
cutting
L
15

AE
17

AB
21

K P
15 14

Q
14

R
HEALTH CARE PROJECT
14

G T
7 18

B 4 C
1 67

D
60

E
3
A 5
178
U
18

Z
21

S
24
M
22

H N V
15 7 16

Y AF
21 21

AG
21

F J O
7 15 7
AC AA AD
21 14 21

W
18