1.0 PURPOSE

Purpose of this guideline is to identify the sequence to be followed during the execution
of the project.

2.0 SCOPE

This guideline is applicable for any Site Survey works for the variety project implementation.
Document Code:

SITE SURVEY BIPI-ENG-WI-001-00

WORK INSTRUCTION Effectivity Date:


April 01, 2015

3.0 REFERENCES

National Building Code of the Philippines; Republic Act no. 6541


National Structural Code Of The Philippines,6th Edition 2010 Volume 1
DPWH Standard Specifications for Public Works and Highways, 2004 Edition: Volume II,
Highways, Bridges and Airports.

4.0 GUIDELINES

1. Establish property line, put the permanent marking (mohon) if not seen. (For urban
Document Code:

SITE SURVEY BIPI-ENG-WI-001-00

WORK INSTRUCTION Effectivity Date:


April 01, 2015

project or within Metro Manila).

2. Establish approved control points given by client reference or from client surveyor.

3. Mark the grid line of the building as reflected on the approved plan.

4. Establish the horizontal and vertical control and the line and grade of structure.
Document Code:

SITE SURVEY BIPI-ENG-WI-001-00

WORK INSTRUCTION Effectivity Date:


April 01, 2015
Document Code:

SITE SURVEY BIPI-ENG-WI-001-00

WORK INSTRUCTION Effectivity Date:


April 01, 2015