PREPARED BY Yuvakanth K S APPROVED BY Stephen Rajkumar

CLIENT AL QABIL - SAMAR, C/O Al Nashwan Ship Repair LLC


DESCRIPTION OF 1. Overhaul of Towing Winch Break Cylinder
THE WORK 2. Overhaul of Towing Motor
3. Overhaul of Power Pack
4. Overhaul of Azimuth Thruster
5. Overhaul of Provision Crane
CLIENT PO Verbal LOCATION Dubai Maritime City- Wet
REFERENCE Confirmation by Birth:02
the Client
(Capt.Vijay)
231/2023 & START DATE 19.10.2023
OUR REFERENCE 18.10.2023 END DATE 31.10.2023

W386, Dubai Maritime City – Post Box No. 6177 – Dubai, UAE
:+971 4 4229230,  + 9 7 1 5 5 3 7 3 2 6 3 5
 : E Mail: info.uae@wintech-group.net, www.wintech-group.net
HAZARD IDENTIFICATION /RISK ASSESSMENT

S.NO. DESCRIPTION RISK PROBABILITY SEVERITY ACTIONS TO MINIMIZE RISK


1. JOB RELATED RISKS
1.1. Access & 1. Slip Unlikely Moderate 1. Access must be clear from
carrying 2. Trip & fall on obstructions
material to the same level 2. Appropriate Lighting,
work area 3. Manual maintain good Housekeeping,
handling of the avoid loose trailing cables on
materials ground
4. Improper 3. Deploy adequate number of
access & taking workers for manual handling
short cuts. to reduce the load (Less than
5. Body 25 kg's per person).
injuries/back 4. Team lifting by the worker
6. injuries in case of heavy load lifting.
5. Proper signage to be
affixed. Dotted hand gloves,
Dust Mask, Safety Go y les
should be worn.
1.2. Surface 1. Dust Unlikely Moderate 1. In order to avoid an
preparation particles incident from happening from
2. Protrudingor this, the following needs to be
sharp edges considered as preventive
3. Eye injuries, actions.
Minor Laceration 2. Water sprinkling to control
dust
3. Barricade the workplace &
Appropriate signage to be
affixed
4. Prior to start Protruding
sharp objects /edges shall be
protected.
5. Maintain good
housekeeping
6. Tool box talk
7. Dotted hand gloves, Dust
Mask, Safety Goggles should be
worn.
1.3. Housekeeping 1. Property Unlikely Moderate 1. Housekeeping should
damage, slip, be addressed dailybasis.
trip and fall 2. Waste to be collected in
hazard. the designated area provided
2. Cut and by concernedperson.
bleed cases 3. Use Rubber (chemical
bruise or protective)hand gloves,
bodily Dust Mask, Safety Goggles
environmental should be worm.
impact

W386, Dubai Maritime City – Post Box No. 6177 – Dubai, UAE
:+971 4 4229230,  + 9 7 1 5 5 3 7 3 2 6 3 5
 : E Mail: info.uae@wintech-group.net, www.wintech-group.net
1.4. Components such as hoses /
Slip 1. The activity Likely Moderate pipes / cables should be either
Hazard/Oil & involves the use of routedover head on trays or
Greases on the hydraulic oil. suspended with sufficient
Cranes These components supports. In situations where
when left on the the said components cannot be
floor and the laid overhead and pass through
working area raise passage wherepersonnel
the potential risk movement ispresent, they
of slipping which should beplaced in between
may cause injury crossing ramps
to personnel
1.5. Unlikely Catastrophic 1. Use of equipment’s and
Since the material which arehaving
equipment is at valid test certificates
Access by height and during 2. Check ladder and
ladder the service at the platform bolts.
time of climbing 3. Check cleanliness ofladder
the oily surface (No Grease, oil etc.) prior to
may cause injury climbing ladder clean soles of
to personnel. shoes for grease, oil and mud.
4. point contact to be
made at all times while
climbing ladder.
2. EXTERNAL RISKS
2.1 Moderate Moderate 1. All personnel performing the
1. Plant hazard job should be trained and have
awareness awareness of riskinvolved in
2. Entry or access the job andhow to handle it.
Man Power to plant & 2. Personnel enteringsite
Equipment should be inducted and
3. Weather briefed about site safety
Conditions requirement, areas ofaccess,
etc.
3. Sufficient water, air and light
supply shouldbe arranged to
overcome weather conditions.

W386, Dubai Maritime City – Post Box No. 6177 – Dubai, UAE
:+971 4 4229230,  + 9 7 1 5 5 3 7 3 2 6 3 5
 : E Mail: info.uae@wintech-group.net, www.wintech-group.net

You might also like