SPAN WORK DETAILS

SL NO Work Description Remarks


Aug-23 Sep-23 Oct-23 Nov-23 Dec-23 Jan-23
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 10 11 12 13 14 15 16 17 18 19

1 Span machine indent & Order Done

2 Structural Material Indent Done

3 Material Order Done

4 Material Receive

5 Structural Fabrication & erection

6 Fabrication of Structure Done

Blasting of structure Done

7 Structure Painting

8 material Shifting fron U-4 to U2

9 Civil Work

10 Erection of structure

11 Machine Receive (CB 700 and Sand Mixture)

12 Sand Conveying line finalization Done

13 Drawing of sand conveying line

14 material indent for sand conveying line

15 waterline Finalization

16 Waterline drawing

17 waterline material indent

18 Air line Finalization

19 Air line drawing

20 Air line Material Indent

21 Sand Conveying line material Receive

22 water line material receive

23 Air line material receive

24 water line fabrication start

25 Air Line fabrication start

26 waterline and air line erection

27 sand conveying line erection

28 Machine shifting and commissiong New CB 700

29 Machine trial

30 Ready for production

31 CB 300 machine receive

32 old CB 700 machine shifting


Old CB 700 and CB 300 machine positioning and
33
commissioning
34 Trial

35 Ready for production

36 Old CB 800 dismentling and shifting


old CB 800 machine assembly and
37
commissioning
38 Trial

39 Ready for production