A NGOC BT1-BOP-QM-ITP-1000-0001 - 0 - ITP For Road, Hardstand - Crane Pad Work
A NGOC BT1-BOP-QM-ITP-1000-0001 - 0 - ITP For Road, Hardstand - Crane Pad Work
PROJECT: BT1 Wind Farm PACKAGE: BOP PREPARED BY: VU HUY NGOC Revision: 0
DOCUMENT NO: BT1-BOP-QM-ITP-1000-0001_0 WORK: Road, Hardstand & Crane pad CHECKED BY: NGO VAN THUAN Date: 8/23/2020
Legend:
H = Hold N/A = Not applicable SU = Sub-Contractor
W = Witness A = Review and Approval CO = Contractor
RI=Random inspection IFA = Issued for authorization/Approval OW = The Owner/ Owner Engineer
R = Review of report I = Information IFC= Issue For Construction
Item REFERENCE INSPECTION/TEST ACCEPTANCE CONTROL RESPONSIBILITY
CHECK AND INSPECTION ITEM VERIFICATIONS
No. DOCUMENTS DETAILS CRITERIA FREQUENCY SU CO OW
I DOCUMENTS REVIEW
Borrow soil embankment layer Cutting road Filling road 1000m2/2 point/layer Test report
H W W
Lớp nền đất mượn Đường đào Đường đắp 1000m2 / 2 điểm / lớp Báo cáo thí nghiệm
Decree 46/2015/ND-CP on
quality management of within a month of
As-built drawing construction works work completion
4 IFA A
Bản vẽ hoàn công Nghị định 46/2019/ND-CP Trong 1 tháng hoàn
về quản lý chất lượng công thành công việc
trình