DAILY PROGRESS REPORT

Project Title : Rua Al Madinah Project Infrastructure Work


Project Reference: FMSA-22042 Record Ref. No. : FMSA22042-DPR-454
Employer : Rua Al Madinah Report Submission Date : Mon, 01/Apr/24
Management Consultant: Parsons Report Status Date : Sun, 31/Mar/24
Technical Supervision Consultant WSP Work Shift Day
Main Contractor: Al Ajmi Company and CR18
Sub Contractor: Freyssinet Menard Saudi Arabia
HSE
Desciption Today Cummulative Desciption Today Cummulative
Incident Reports 0 1 Equipment Inspections 6
Environmental Incident 0 Safety Inductions 0 9
Fatalities 0 Safety training 0
Lost time Incidents 0 Toolbox talks 1 1
Near-misses 0 4

Weather Observations Time Temprature Humidity Precipitation Sky Wind


Observation 1 : 7:00 AM 18°C 20% 0% Sunny 15 km/Hr
Observation 2 : 12:00 PM 28°C 15% 0% Sunny 30 km/hr

MANPOWER EQUIPMENT
Total Total
Designation Remarks Description Remarks
Numbers Numbers
Project Manager 1 CMC Rig 2 1 Idle
QC Engineer 1 CPT Rig 0
Site Engineer 0 Wheel Loader 1
Site Manager 0 Manlift 1
Safety Officer 1 Landini Pump 2
Logistics 1 Water Tank 2
Mechanic 1 Tower Light 0
CMC Rig Operator 1 ZLT Equipment 0
Surveyor 1 Mobile Crane 0
Wheel Loader Operator 1 Welding Machine 1
CPT/PMT Operator 0 SPT Rig 0
Mobile Crane Operator 0 GPS survey equipment 1
Welder 1 Portable Office 3
PLT/ZLT Technician 0 Workshop Container 2
Manlift Operator 1 Toilet 1
3rd Party Concrete testing technicion 1 Generator 1
Rigger 1 Light vehicles 2
Foreman 2 Pick up 3
Helpers 2

Total 16 Cummulative 8991 Total 22 Cummulative 10472

Activities done
1. Pre TBT and House keeeping prior to start of any activity.
2. Execution of CMC at Tunnel 1 station 0+41- to 0+300 -18 CMC (Concrete C25-59 Cum).
3. Setting out of CMC points.
4. Survey inspection of cmc Points at Tunnel 1
5. Taking as built of Executed CMC.
6. As built inspection of executed CMCs at Tunnel 1
Planned Activities in the Next 24 hours
1. Continue execution of CMC at Tunnel 1.
2. Seting out of CMC in Zone 9 Tunnel 1 .
3. Survey inspection at Zone 09 /Tunnel 1.

Areas of Concern
1. Please provide your execavation schedule. Accordingly we will provide our Soil improvement schedule.
2. Al ajmi to take care of areas barricaded at all working areas, for asbuilt inspection next day.
3. Rig 2 standby - area unavailable.
4. Tunnel 1 need proper deawtering ,preperation of working platform atleast 1.5m above water table and preparation of access.
5. Tunnel has no work front available after Monday (01.04.2024).

Sign: Sign:

Sub Contractor: Freyssinet Menard Saudi Arabia Sub Contractor: Freyssinet Menard Saudi Arabia Contractor: Al Ajmi Company
Name: Hais Ul Ibru Name: Mohamed Mydeen Name: Ahmad Awad
Job Title: QC Engineer Job Title: Project Manager Job Title:Senior Geotechnical Engineer
Prepared By Checked/Reviewed by Approved by
DAILY PROGRESS REPORT

Project Title : Rua Al Madinah Project Infrastructure Work


Project Reference: FMSA-22042 Record Ref. No. : FMSA22042-DPR-454
Employer : Rua Al Madinah Report Submission Date : Mon, 01/Apr/24
Management Consultant: Parsons Report Status Date : Sun, 31/Mar/24
Technical Supervision Consultant WSP
Main Contractor: Al Ajmi Company and CR18
Sub Contractor: Freyssinet Menard Saudi Arabia
PRODUCTION
CONTROLLED MODULUS COLUMN (CMC)
Total Area Total Number of Executed Points
Approx.
Item Activity Total % Completed
Total Planned
Planned Previous Today Cummulative Previous Today Cummulative
(Number)
Quantity
2
(m )
1 Initial Testing
1.1 Standard Penetration Test 38 36 0 36 94.74%
1.2 Cone Penetration Test 18 18 0 18 100.00%
2 Pre-Construction Testing
2.1 Execution of CMC at Tunnel 2 51.4 51.4 0.00 51.4 16 16 0 16 100.00%
2.2 Execution of CMC at Mechanical Room at Tunnel 2 51.4 46°C 0.00 51.4 16 16 0 16 100.00%
2.3 Execution of CMC at Tunnel 3 59.3 59.3 0.00 59.3 16 16 0 16 100.00%
2.4 Execution of CMC at Zone 6A 49.3 0.0 0.00 49.3 16 16 0 16 100.00%
2.5 Testing by Zone Load Test (ZLT) at Tunnel 2 2 1 0 1 50.00%
3 Execution
Tunnel 2
3.1 Execution of CMC at Tunnel 2 &MR stat. 0+40-0+280 7222.4 7222.4 0 7222.4 2249 2249 0 2249 100.00%
3.2 Execution of CMC at Tunnel 2&MR stat.0+280-0+342 3264.0 2773.3 0 2773.3 1051 893 0 893 84.97%
Zone 6 A
3.3 Execution of CMC at Zone 6A WUC Sta. 2+545 to 2+660 1196.7 1196.7 0.00 1196.7 388 388 0 388 100.00%
Execution of CMC at Zone 6A Dry utility Tunnel North
3.4 111.8 111.8 0.00 111.8 37 37 0 37 100.00%
station 2+025 TO 2+265 .

Execution of CMC at Zone 6A Dry utility Tunnel & MR


3.5 1655.4 693.7 0.0 693.7 525 220 0 220 41.90%
North station 2+260 TO 2+400 .
Tunnel 3
Execution of CMC at Tunnel 3 Station 0+115 to 0+166 &
3.6 4355.4 3340.6 0.00 3340.6 1176 902 0 902 76.70%
0+300 to 0+434
Execution of CMC at Mechanical Room at Tunnel3 Station
3.7 737.8 632.4 0.00 632.4 315 270 0 270 85.71%
0+360-0+ 434
Execution of CMC at Mechanical Room at Tunnel3-Egraiss
3.8 154.2 154.2 0.00 154.2 95 95 0 95 100.00%
stairs Station 0+320
Execution of CMC at Mechanical Room at Tunnel 3 0+115
3.9 1136.5 1136.5 0.00 1136.5 302 302 0 302 100.00%
to 0+166
Execution of CMC at Tunnel 3 & Mechanical Room Station
3.10 2169 2169.0 0.0 2169.0 666 666 0 666 100.00%
0+065 to 0+115
Zone 6 B
Execution of CMC at Zone 6B, Wet utility Tunnel Sta. 2+740
3.11 1839.5 1478.8 0.00 1478.8 510 410 0 410 80.39%
to 2+943
Execution of CMC at mechannical room in Zone 6B, Wet
3.12 649.2 432.8 0.00 432.8 180 120 0 120 66.67%
utility Tunnel Sta. 2+740 to 2+943
Execution of CMC at Zone 6B, Wet utility Tunnel Sta. 2+576
3.13 1871.2 992.0 0.00 992.0 547 290 0 290 53.02%
to 2+740
Zone 1

3.14 Execution of CMC at Zone 1 Station 0+350 to 0+400 1567 1567.0 0.00 1567.0 326 326 0 326 100.00%

3.15 Execution of CMC at Zone 1 Station 0+400 to 0+500 6089.75 5498.4 0.0 5498.4 1380 1246 0 1246 90.29%

3.16 Execution of CMC at Zone 1 Wet Culvert Station 0+230 to 0+300 1323.8 1323.8 0.0 1323.8 383 383 0 383 100.00%

Tunnel 1

3.17 Execution of CMC at Tunnel 1 Station 0+041 to 0+300 12032.6 613.6 52.10 665.7 4157 212 18 230 5.53%
Post Test
4.1 Testing by Zone Load Test (ZLT) at Zone 6 1 1 0 1 100.00%
4.2 Testing by Zone Load Test (ZLT) at Tunnel 2 5 5 0 5 100.00%
4.3 Testing by Zone Load Test (ZLT) at Tunnel 3 1 1 0 1 100.00%

Actual Executed CMC Remaining

Item Zone Total CMC Total Area Actual % Accumulated Accumulated Design Status
Daily CMC Area
CMC Area (m2)

1 Tunnel 2 3332 10589 95% - 3174 10098.5 158 490.7 Code B


2 Tunnel 3 2570 8612 88% - 2251 7492.0 319 1120.2 Code B
690 2489 77% - 530 1911.6 160 577.1
3 Zone 6B,Wet utility Tunnel( Sta. 2+826 to 3+020) Code B
4 Zone 6B,Wet utility Tunnel( Sta. 2+660 to 2+826) 547 1871 53% - 290 992.0 257 879.1 Code B

5 Zone 6A Wet utility Tunnel Sta. 2+545 to 2+660 404 1246 100% - 404 1246.0 0 0.0 Code B

6 Zone 1 Station 0+350 to 0+400 326 1567 100% - 326 1567.0 0 0.0 Code B
Execution of CMC at Zone 6A Dry utility -
7 37 112 100% 37 111.8 0 0.0 Code B
Tunnel North station 2+025 TO 2+265 .
8 Zone 6A,Dry Utility culvert(260-400) 525 1655 42% - 220 693.7 305 961.7 Code B

9 Zone 1 Station 0+400 to 0+500 1380 6090 90% - 1246 5498.4 134 591.3 Code B

10 Zone 6A 2+200-2+320 & Mechanical Room - 4227 - - - - - (Under Design)

11 Tunnel 1 Station 0+041 to 0+300 4157 12033 6% 18 230 665.7 3927 11366.9 Code B

12 Zone 1 Wet Culvert Station 0+230 to 0+300 383 1324 100% - 383 1323.8 0 0.0 Code B

Total 14351 51814 - - 9091 31600.6 5260 20213.7


Sign: Sign: Sign:

Sub Contractor: Freyssinet Menard Saudi Arabia Sub Contractor: Freyssinet Menard Saudi Arabia Contractor: Al Ajmi Company

Name: Hais Ul Ibru Name: Mohamed Mydeen Name: Ahmad Awad

Job Title: QC Engineer Job Title: Project Manager Job Title: Senior Geotechnical Engineer

Prepared By Checked/Reviewed by Approved by


DAILY PROGRESS REPORT

Project Title : Rua Al Madinah Project Infrastructure Work


Project Reference: FMSA-22042 Record Ref. No. : FMSA22042-DPR-454
Employer : Rua Al Madinah Report Submission Date : Mon, 01/Apr/24
Management Consultant: Parsons Report Status Date : Sun, 31/Mar/24
Technical Supervision Consultant WSP
Main Contractor: Al Ajmi Company and CR18
Sub Contractor: Freyssinet Menard Saudi Arabia
PHOTOGRAPHS

Photo.1 TBT on "Electrical Safety" Photo. 2 . Tunnel 1 -Needs Backfilling and compaction

Photo. 3 . As Built inspection - Tunnel 1 Photo. 3 . Execution of CMC - Tunnel 1

Sign: Sign: Sign:

Sub Contractor: Freyssinet Menard Saudi Arabia Sub Contractor: Freyssinet Menard Saudi Arabia Contractor: Al Ajmi Company

Name: Hais Ul Ibru Name: Mohamed Mydeen Name: Ahmad Awad


Job Title: QC Engineer Job Title: Project Manager Job Title:Senior Geotechnical Enginner

Prepared By Checked/Reviewed by Approved by


ROOM-3B N=2706307.3440 KEY PLAN (DO NOT SCALE)
DRY CULVERT

WET CULVERT

TUNNEL-03
AIRPORT TUNNEL

JADAT AL HARAM TUNNEL


TUNNEL-02

KAAR TUNNEL
TUNNEL-01

JADAT AL HARAM TUNNEL


AL HARAM

DRY CULVERT D9-1

DRY CULVERT D9-2


WET CULVERT

DRY CULVERT

GENERAL NOTES:
24 96 69 43 16 89 62 35 08 1 3 7
T-3 T-2 T-2 T-2 T-2 T-1 T-1 T-1 T-1 T-8 T-5 T-2
1. COORDINATE SYSTEM IS UTM WGS 84- ZONE 37.
55 29 03 77 51 25 98 71 44 17 90 63 36 09 2 5 8 2. ALL STATIONS ARE IN METERS UNLESS OTHERWISE NOTED.
6 81 T-4 T-4 T-4 T-3 T-3 T-3 T-2 T-2 T-2 T-2 T-1 T-1 T-1 T-1 T-8 T-5 T-2 T-1
T-4
3. ALL LEVELS ARE IN METERS UNLESS OTHERWISE NOTED.
0
31 T-5 4. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS NOTED OTHERWISE.
56 T-5
-58
1 T-5 5. AREA ENCLOSED IN THE DRAWING-12032.6 SQ.M

-65
7 32 07 82T 57 32 07 82 56 30 04 78 52 26 99 72 45 18 91 64 37 10 3 6 9
82 T T-6 T-6 T-5 T-5 T-5 T-5 T-4 T-4 T-4 T-4 T-3 T-3 T-3 T-2 T-2 T-2 T-2 T-1 T-1 T-1 T-1 T-8 T-5 T-2 T-2
32
07 T-6
T-7
-75
5 T-7
2 80 7T 3 8 3 58 33 08 83 58 33 08 83 57 31 05 79 53 27 00 73 46 19 92 65 38 11
24 T-80 T-7 T-7
5
T-7
3
T-7
0
T-6
8
T-6 T-6 T-6 T-5 T-5 T-5 T-5 T-4 T-4 T-4 T-4 T-3 T-3 T-3 T-3 T-2 T-2 T-2 T-1 T-1 T-1 T-1 T-8
4
T-5
7
T-3
0
T-3
46 T-8
68 T-8
2 90 T-8
-91 T-8 LEGENDS/ABBREVIATIONS:
4 3 2 1 0 9 T
12 10 08 06 04 01 98 77 56 35 14 92 70 47 25 03 81 58 34 09 84 59 34 09 84 59 34 09 84 58 32 06 80 54 28 01 74 47 20 93 66 39 12 5 8 1
T-1 T-1 T-1 T-1 T-1 T-1 T-9 T-9 T-9 T-9 T-9 T-8 T-8 T-8 T-8 T-8 T-7 T-7 T-7 T-7 T-6 T-6 T-6 T-6 T-5 T-5 T-5 T-5 T-4 T-4 T-4 T-4 T-3 T-3 T-3 T-3 T-2 T-2 T-2 T-1 T-1 T-1 T-1 T-8 T-5 T-3 T-4
CMC -600 mm Dia - 4157 Cmcs

5 4 3 2 1 0
12 -11
0
-10
8
-10
6 04 02 -99
9
-97
8
-95
7
-93
6
-91
5
-89
3 71 48 26 -80
4 82 59 -73
5 10 -68
5 60 35 -61
0 85 60 35 -51
0
-48
5 59 33 07 81 -35
5
-32
9 02 75 48 -22
1
-19
4 67 40 13 6 9 -32 NEW PROGRESS
T-1 T T T T-1 T-1 T T T T T T T-8 T-8 T-8 T T-7 T-7 T T-7 T T-6 T-6 T T-5 T-5 T-5 T T T-4 T-4 T-4 T-3 T T T-3 T-2 T-2 T T T-1 T-1 T-1 T-8 T-5 T T-5
OLD PROGRESS
6 5 4 3 2 1 0
12 10 08 06 04 02 00 79 58 37 16 94 7 2 49 27 05 83 60 36 11 86 6 1 36 11 86 61 36 11 86 60 34 08 82 56 30 03 76 49 22 95 68 41 14 7 0 3
T-1 T-1 T-1 T-1 T-1 T-1 T-1 T-9 T-9 T-9 T-9 T-8 T-8 T-8 T-8 T-8 T-7 T-7 T-7 T-7 T-6 T-6 T-6 T-6 T-5 T-5 T-5 T-5 T-4 T-4 T-4 T-4 T-3 T-3 T-3 T-3 T-2 T-2 T-2 T-1 T-1 T-1 T-1 T-8 T-6 T-3 T-6

7 6 5 4 3 2 1
12 10 08 06 04 02 00 80 59 38 17 95 73 50 28 06 84 61 37 12 87 62 37 12 87 62 37 12 87 61 35 09 83 57 31 04 77 50 23 96 69 42 15 8 1 4
T-1 T-1 T-1 T-1 T-1 T-1 T-1 T-9 T-9 T-9 T-9 T-8 T-8 T-8 T-8 T-8 T-7 T-7 T-7 T-7 T-6 T-6 T-6 T-6 T-5 T-5 T-5 T-5 T-4 T-4 T-4 T-4 T-3 T-3 T-3 T-3 T-2 T-2 T-2 T-1 T-1 T-1 T-1 T-8 T-6 T-3 T-7

8 07 86 65 44 23 02 REFERENCE DRAWINGS
12 1 0 0 0 0 0 81 60 39 18 96 74 51 29 07 85 62 38 13 88 63 38 13 88 63 38 13 88 62 36 10 84 58 32 05 78 51 24 97 70 43 16 9 2 5
T-1 T-1 T-1 T-1 T-1 T-1 T-1 T-9 T-9 T-9 T-9 T-8 T-8 T-8 T-8 T-8 T-7 T-7 T-7 T-7 T-6 T-6 T-6 T-6 T-5 T-5 T-5 T-5 T-4 T-4 T-4 T-4 T-3 T-3 T-3 T-3 T-2 T-2 T-2 T-1 T-1 T-1 T-1 T-8 T-6 T-3 T-8 S. No TYPE DRAWING No.

01 IFC RAM-WSP-SW-ZZ-DR-CRD-9203 (GROUND IMPROVEMENT LAYOUT PLAN)

9 08 87 66 45 24 03
12 1 0 0 0 0 0 82 61 40 19 97 75 52 30 08 86 63 39 14 89 64 39 14 89 64 39 14 89 63 37 11 85 59 33 06 79 52 25 98 71 44 17 0 3 6
T-1 T-1 T-1 T-1 T-1 T-1 T-1 T-9 T-9 T-9 T-9 T-8 T-8 T-8 T-8 T-8 T-7 T-7 T-7 T-7 T-6 T-6 T-6 T-6 T-5 T-5 T-5 T-5 T-4 T-4 T-4 T-4 T-3 T-3 T-3 T-3 T-2 T-2 T-2 T-1 T-1 T-1 T-1 T-9 T-6 T-3 T-9

0 9 8 7 6 5 4
13 10 08 06 04 02 00 83 62 41 20 98 76 53 31 09 87 64 40 15 90 65 40 15 90 65 40 15 90 64 38 12 86 60 34 07 80 53 26 99 72 45 18 1 4 7 0
T-1 T-1 T-1 T-1 T-1 T-1 T-1 T-9 T-9 T-9 T-9 T-8 T-8 T-8 T-8 T-8 T-7 T-7 T-7 T-7 T-6 T-6 T-6 T-6 T-5 T-5 T-5 T-5 T-4 T-4 T-4 T-4 T-3 T-3 T-3 T-3 T-2 T-2 T-2 T-1 T-1 T-1 T-1 T-9 T-6 T-3 T-1
DRAWING TYPE:

1 10 89 68 47 26 05
SHOP DRAWING
13 1 0 0 0 0 0 8 4 6 3 4 2 2 1 99 7 7 5 4 3 2 10 8 8 6 5 41 1 6 91 6 6 4 1 1 6 9 1 6 6 4 1 1 6 9 1 6 5 3 9 1 3 8 7 6 1 3 5 0 8 8 1 5 4 2 7 0 0 7 3 4 6 1 9 2 5 8 1
T-1 T-1 T-1 T-1 T-1 T-1 T-1 T-9 T-9 T-9 T-9 T-8 T-8 T-8 T-8 T-8 T-7 T-7 T-7 T-7 T-6 T-6 T-6 T-6 T-5 T-5 T-5 T-5 T-4 T-4 T-4 T-4 T-3 T-3 T-3 T-3 T-2 T-2 T-2 T-2 T-1 T-1 T-1 T-9 T-6 T-3 T-1

2 1 0 9 8 7 6
13 11 09 06 04 02 00 85 64 43 22 00 78 55 33 11 89 66 42 17 92 67 42 17 92 67 42 17 92 66 40 14 88 62 36 09 82 55 28 01 74 47 20 3 6 9 2
T-1 T-1 T-1 T-1 T-1 T-1 T-1 T-9 T-9 T-9 T-9 T-9 T-8 T-8 T-8 T-8 T-7 T-7 T-7 T-7 T-6 T-6 T-6 T-6 T-5 T-5 T-5 T-5 T-4 T-4 T-4 T-4 T-3 T-3 T-3 T-3 T-2 T-2 T-2 T-2 T-1 T-1 T-1 T-9 T-6 T-3 T-1

C1 18-JAN-2024 HI ISSUED FOR REVIEW AND APPROVAL MM MV


3 2 1 0 9 8 7
13 11 09 07 04 02 00 86 65 44 23 01 79 56 34 12 90 67 43 18 93 68 43 18 93 68 43 18 93 67 41 15 89 63 37 10 83 56 29 02 75 48 21 4 7 0 3
T-1 T-1 T-1 T-1 T-1 T-1 T-1 T-9 T-9 T-9 T-9 T-9 T-8 T-8 T-8 T-8 T-7 T-7 T-7 T-7 T-6 T-6 T-6 T-6 T-5 T-5 T-5 T-5 T-4 T-4 T-4 T-4 T-3 T-3 T-3 T-3 T-2 T-2 T-2 T-2 T-1 T-1 T-1 T-9 T-6 T-4 T-1
REV DATE BY DESCRIPTION CHK APD

ACTION
A APPROVED B APPROVED AS NOTED C REVISED & RESUBMIT D REJECTED E OTHER
4 13 92 71 50 29 08
13 1 0 0 0 0 0 8 7 6 6 4 5 2 4 02 8 0 5 7 3 5 13 9 1 6 8 44 1 9 94 6 9 4 4 1 9 9 4 6 9 4 4 1 9 9 4 6 8 4 2 1 6 9 0 6 4 3 8 1 1 8 4 5 7 3 0 0 3 7 6 4 9 2 2 5 8 1 4
T-1 T-1 T-1 T-1 T-1 T-1 T-1 T-9 T-9 T-9 T-9 T-9 T-8 T-8 T-8 T-8 T-7 T-7 T-7 T-7 T-6 T-6 T-6 T-6 T-5 T-5 T-5 T-5 T-4 T-4 T-4 T-4 T-3 T-3 T-3 T-3 T-2 T-2 T-2 T-2 T-1 T-1 T-1 T-9 T-6 T-4 T-1

5 4 3 2 1 0 9
13 11 09 07 05 03 00 88 67 46 25 03 81 58 36 14 92 69 45 20 95 70 45 20 95 70 45 20 95 69 43 17 91 65 39 12 85 58 31 04 77 50 23 6 9 2 5
T-1 T-1 T-1 T-1 T-1 T-1 T-1 T-9 T-9 T-9 T-9 T-9 T-8 T-8 T-8 T-8 T-7 T-7 T-7 T-7 T-6 T-6 T-6 T-6 T-5 T-5 T-5 T-5 T-4 T-4 T-4 T-4 T-3 T-3 T-3 T-3 T-2 T-2 T-2 T-2 T-1 T-1 T-1 T-9 T-6 T-4 T-1

6 5 4 3 2 1 0
13 11 09 07 05 03 01 89 68 47 26 04 82 59 37 15 93 70 46 21 96 71 46 21 96 71 46 21 96 70 44 18 92 66 40 13 86 59 32 05 78 51 24 7 0 3 6
T-1 T-1 T-1 T-1 T-1 T-1 T-1 T-9 T-9 T-9 T-9 T-9 T-8 T-8 T-8 T-8 T-7 T-7 T-7 T-7 T-6 T-6 T-6 T-6 T-5 T-5 T-5 T-5 T-4 T-4 T-4 T-4 T-3 T-3 T-3 T-3 T-2 T-2 T-2 T-2 T-1 T-1 T-1 T-9 T-7 T-4 T-1

7 6 5 4 3 2 1
13 11 09 07 05 03 01 90 69 48 27 05 83 60 38 16 94 71 47 22 97 72 47 22 97 72 47 22 97 71 45 19 93 67 41 14 87 60 33 06 79 52 25 8 1 4 7
T-1 T-1 T-1 T-1 T-1 T-1 T-1 T-9 T-9 T-9 T-9 T-9 T-8 T-8 T-8 T-8 T-7 T-7 T-7 T-7 T-6 T-6 T-6 T-6 T-5 T-5 T-5 T-5 T-4 T-4 T-4 T-4 T-3 T-3 T-3 T-3 T-2 T-2 T-2 T-2 T-1 T-1 T-1 T-9 T-7 T-4 T-1
CLIENT:

8 7 6 5 4 3 2
13 11 09 07 05 03 01 91 70 49 28 06 8 4 61 39 17 95 72 48 23 98 7 3 48 23 98 73 48 23 98 72 46 20 94 68 42 15 88 61 34 07 80 53 26 9 2 5 8
T-1 T-1 T-1 T-1 T-1 T-1 T-1 T-9 T-9 T-9 T-9 T-9 T-8 T-8 T-8 T-8 T-7 T-7 T-7 T-7 T-6 T-6 T-6 T-6 T-5 T-5 T-5 T-5 T-4 T-4 T-4 T-4 T-3 T-3 T-3 T-3 T-2 T-2 T-2 T-2 T-1 T-1 T-1 T-9 T-7 T-4 T-1

PROJECT MANAGEMENT CONSULTANT:


9 8 7 6 5 4 3
13 11 09 07 05 03 01 92 71 50 29 07 85 62 40 18 96 73 49 24 99 74 49 24 99 74 49 24 99 73 47 21 95 69 43 16 89 62 35 08 81 54 27 00 3 6 9
T-1 T-1 T-1 T-1 T-1 T-1 T-1 T-9 T-9 T-9 T-9 T-9 T-8 T-8 T-8 T-8 T-7 T-7 T-7 T-7 T-6 T-6 T-6 T-6 T-5 T-5 T-5 T-5 T-4 T-4 T-4 T-4 T-3 T-3 T-3 T-3 T-2 T-2 T-2 T-2 T-1 T-1 T-1 T-1 T-7 T-4 T-1

0 9 8 7 6 5 4
14 11 09 07 05 03 01 93 72 51 30 08 86 63 41 19 97 74 50 25 00 75 50 25 00 75 50 25 00 74 48 22 96 70 44 17 90 63 36 09 82 55 28 01 4 7 0
T-1 T-1 T-1 T-1 T-1 T-1 T-1 T-9 T-9 T-9 T-9 T-9 T-8 T-8 T-8 T-8 T-7 T-7 T-7 T-7 T-7 T-6 T-6 T-6 T-6 T-5 T-5 T-5 T-5 T-4 T-4 T-4 T-3 T-3 T-3 T-3 T-2 T-2 T-2 T-2 T-1 T-1 T-1 T-1 T-7 T-4 T-2
SAUDI ARABIAN PARSONS LIMITED

1 0 9 8 7 6 5
14 -11
2
-10
9
-10
7 05 03 -10
1
-99
4
-97
3
-95
2
-93
1
-90
9 87 64 42 -82
0 98 75 -75
1 26 -70
1 76 51 -62
6 01 76 51 -52
6
-50
1 75 49 23 97 -37
1
-34
5 18 91 64 -23
7
-21
0 83 56 29 02 5 -48 -21
TECHNICAL SUPERVISION / DESIGN CONSULTANT:
T-1 T T T T-1 T-1 T T T T T T T-8 T-8 T-8 T T-7 T-7 T T-7 T T-6 T-6 T T-6 T-5 T-5 T T T-4 T-4 T-4 T-3 T T T-3 T-2 T-2 T T T-1 T-1 T-1 T-1 T-7 T T

2 1 0 9 8 7 6
14 12 10 07 05 03 01 95 74 53 32 10 88 65 43 21 99 76 52 27 02 77 52 27 02 77 52 27 02 76 50 24 98 72 46 19 92 65 38 11 84 57 30 03 6 9 2
T-1 T-1 T-1 T-1 T-1 T-1 T-1 T-9 T-9 T-9 T-9 T-9 T-8 T-8 T-8 T-8 T-7 T-7 T-7 T-7 T-7 T-6 T-6 T-6 T-6 T-5 T-5 T-5 T-5 T-4 T-4 T-4 T-3 T-3 T-3 T-3 T-2 T-2 T-2 T-2 T-1 T-1 T-1 T-1 T-7 T-4 T-2
MIDDLE EAST AND PARTNER SAUDI COMPANY FOR ENGINEERING CONSULTANCY

3 2 1 0 9 8 7 PROJECT MAIN CONTRACTOR:


14 -11
2
-11
0
-10
8 05 03 -10
1
-99
6
-97
5
-95
4
-93
3
-91
1 89 66 44 -82
2 00 77 -75
3 28 -70
3 78 53 -62
8 03 78 53 -52
8
-50
3 77 51 25 99 -37
3
-34
7 20 93 66 -23
9
-21
2 85 58 31 04 7 -50 -23
T-1 T-1 T-1 T-8 T-8 T-8 T-8 T-7 T-7 T-6 T-6 T-6 T-5 T-5 T-4 T-4 T-4 T-3 T-3 T-2 T-2 T-1 T-1 T-1 T-1 T-7
3

T T T T T T T T T T T T T T T T T T T T T
12

9
10

8
08

06

03

01
T-1

T-1

T-1

T-1

97 JV
T-1

76
T-1

5
T-9 T-9 T-9
5 34
13
T-9 T-9 91 69 67 45 23 01 78 54 29 04 79 54 29 04 79 54 29 04 78 52 26 00 74 48 21 94 67 40 13 86 59 32 05
T-8 T-8 T-8 T-8 T-8 T-8 T-7 T-7 T-7 T-7 T-6 T-6 T-6 T-6 T-5 T-5 T-5 T-5 T-4 T-4 T-4 T-4 T-3 T-3 T-3 T-2 T-2 T-2 T-2 T-1 T-1 T-1 T-1 T-7
8
T-5
1
T-2
4
9

56
7
T-7

T-7

1
T-73
05 80 55 30 05 80 55 30 05 79 53 27 01 75 49 22 95 68 41 14 87 60 33 06 9 2 5
T-7 T-6 T-6 T-6 T-6 T-5 T-5 T-5 T-5 T-4 T-4 T-4 T-4 T-3 T-3 T-3 T-2 T-2 T-2 T-2 T-1 T-1 T-1 T-1 T-7 T-5 T-2 Abdul Ali Al Ajmi Company
Branch of China Railway 18th Bureau Group Co. Ltd
30 www.alajmicompany.com

T-7 PROJECT SPECIALIZED SUB CONTRACTOR:


0 4 28 2 6 0 3 7 0 2 5 8 1 4 7
06 81 56 31 06 -33 -27 S-
21
T-4
8
T-4
5
T-4 T-4
0
T-3
7
T-3
5
T-3
2
T-2
9
T-2
7
T-2
4
T-2
1
T-1
8
T-1
6
T-1
3
T-1
0
T-8
0
T-5
4
T-2
6
ES ES E
T-7 T-6 T-6 T-6 T-6

-34 -28 -22 -16 -11 -6 -1


ES ES ES ES ES ES ES
PROJECT:

35 -29 3 7 2 7 2 RUA AL MADINAH PROJECT


E S- ES E S-2 E S-1 E S-1 E S- E S-
MAIN INFRASTRUCTURE PACKAGE
-36 -30 -24 -18 -13 -8 -3
ES ES ES ES ES ES ES DRAWING TITLE:
JADAT AL HARAM TUNNEL
CMC LAYOUT OF ZONE 09-
-37 -31 -25 -1 9 -14 -9 -4
ES ES ES ES ES ES ES TUNNEL1 STATION 0+43 - 0+300
-38 -32 -26 -20 -15 -10 -5 GEOTECHNICAL
ES ES ES ES ES ES ES
Mohamed Vahid
DRAWING No: SCALE A1: REV:

R02Z00-C021-JVC-09-XXX-SDW-GT-GT-02001 N.T.S C0