Soil Imporvement works Date: 03.01.2024 Time:8.00am to 4.

00pm
Total Area CMC
Sub Total Area of Work Remaining Handed over upto Previous Total No. of No. of
Sl.No Zone Location Station Required Total No. of Daily CMC Remarks
contractor design completed completed area for CMC area to CR18 in days CMC CMC remaining
CMC in m2 CMC points progressed
in m2 in m2 in m2 m2 status completed CMC
0+014 to 0+100 1989 - - - 5296 - - - - - No need for soil improvement Handed over St
0+062.48 to 0+277.765 thirteen segments
0+100 to 0+280 4349 4349 4349 1206 1206 0 1206 0
Tunnel portion
MIP-JVC-CAL-GEO-000021-02-B-28.10.2023
0+280 to +342 1549 1549 1549 0 - 426 426 0 426 0
MIP-JVC-SHD-GEO-000075-01-B-30.11.2023
0+342 to 0+404 1638 1638 - - - - - - - - Requried soil improvement.
Zone 10
1 Menard 0+155 to 0+280 3073 3073 3073 0 1075 1075 0 1075 0 CMC Completed
(Tunnel-02) Mechanical room no-11
0+280 to 0+342 1628 1628 1178 450 572 414 0 414 158 MIP-JVC-CAL-GEO-000021-02-B-28.10.2023
Egress stair -12 0+315 139 139 139 0 53 53 0 53 0 MIP-JVC-SHD-GEO-000075-00-B-09.11.2023
Pump station-05 0+404 415 - - - - - - - - - No need for soil improvement
Room-27 0+340 to 0+400 678 678
Room-26 0+020 Under study
Dry culvert basement-02 0+000 to 0+376.386
0+020 to 0+065 1149 No need for soil improvement
0+065 to 115 1044 1044 1044 0 274 274 0 274 0
Handed over st 0+060 to 0+154 five segments
0+115 to 0+154 850 850 850 0 1993 220 220 0 220 0
Tunnel portion
0+154 to 0+210 1361 - - - - - - - Soil replacement Handed over St 0+154 to 0+310 seven
4087 4087
0+210 to 0+310 2726 - - - - - - - segments
Zone-11 0+310 to 0+434 3281 3281 2461 820 822 940 705 0 705 235 Handed over 0+310 to 0+340 Two segments
2 Menard
(Tunnel-03) 0+065 to 115 1237 1237 1237 0 - 389 389 0 389 0
Mechanical room no -12B CMC Completed
0+115 to 0+160 1187 1187 1187 0 - 302 302 0 302 0
Mechanical room no -12A 0+346 to 0+412 850 850 728 121 315 270 0 270 45
Egress Staircase -15 0+313 36 36 36 0 - 21 21 0 21 0
CMC Completed
Egress Staircase -16 0+313 177 177 177 0 - 67 67 0 67 0
Pump station -06 0+434
Tunnel st 2+200 to 2+320+Dry
culvert st 1+973.94 to 2+025+Wet
No need for Soil improvement. MIP-JVC-CAL-GEO-
culvert st 2+203.199 to 2+320+ 6414 - - - - - - - -
000053-00-B
utility culvert room-05+Pump
station-04
MIP-JVC-CAL-GEO-000017-01-B. No need for Soil
Tunnel st 2+320 to 2+540 6494 - - - - - - - -
improvement.
MIP-JVC-CAL-GEO-000001-01-B- St 2+098 to 2+186
Dry culvert st 2+025 to 2+260 + MIP-JVC-CAL-GEO-000044-01-B st 2+025 to 2+098 &
Zone-6A (2+200 to 2+660) 3606 - - - 1446 - - - - -
utility culvert room -04 2+186 to 2+260 No need for Soil improvement. Handed
over St 2+138 to 2+258.874 Six segments
Zone-6 Haram
MIP-JVC-CAL-GEO-000031-01-B Handed over st
3 Menard tunnel st 2+200 Dry culvert St2+260 to 2+393.397 1703 1703 714 989 544 525 220 0 220 305
2+258.874 to 2+318.874 -3segments
to 3+020
MIP-JVC-CAL-GEO-000017-01-B - No need for Soil
Wet culvert st 2+320 to 2+460
2829 1184 improvement. Hand over st2+348.746 to 2+460 Six
(including Utility culvert room -09
segments
MIP-JVC-CAL-GEO-000029-01-B Handed overed St
Wet culvert st 2+460 to 2+576.715 1380 1380 1380 0 1226 404 404 0 404 0
2+460 to 2+563.746 five segments
Dry culvert st 2+393.397 to 2+718 4261 4261 0 4261 1168 0 0 0 1168 MIP-JVC-CAL-GEO-000018-01-B-17-6-2023
MIP-JVC-CAL-GEO-000031-01-B
Wet culvert st 2+576.715 to 2+740 2062 2062 1093 969 962 547 290 0 290 257 MIP-JVC-SHD-GEO-000046-00-B Hander over
Zone-6B 2+660 to 3+020
st2+643.746 to 2+740 five segments
Wet culvert st 2+740 to 2+943 2707 2707 2079 628 1370 690 530 0 530 160 Hander over st2+740 to to 2+883.746 seven segments
Tunnel portion 0+040 to 0+300 9486 9486
MIP-JVC-CAL-GEO-000047-00-B. Required soil
Vehicular tunnel room -03 140 to 0+280 2895 2895
improvement .
Zone-09 Egress stair -05 0+080 109 109
4 Menard
(Tunnel-01) Room-29 0+060
Dry culvert basement-01 0+060 to 0+334.981 After backfilling. Under study
Utility culvert room -07 0+020
No need for Soil improvement. MIP-JVC-CAL-GEO-
wet culvert & utility culvert room-22 0+000 to 0+140 1832
000050-01-B-07.11.2023
Required Soil improvement. MIP-JVC-CAL-GEO-000051-
Wet culvert & utility culvert room-21 0+140 to 0+207 973 973
01-B-30.12.2023
Wet culvert 0+207 to 0+278 573 573
Required Soil improvement. Under design
Dry culvert 0+00 to 0+44 535 535
No need for Soil improvement. MIP-JVC-CAL-GEO-
0+100 to 0+233 4145
000050-01-B-07.11.2023
No need for Soil improvement. MIP-JVC-CAL-GEO-
4 Menard Zone-01 0+233 to 0+300 1997
000051-01-B-30.12.2023
Required Soil improvement. MIP-JVC-CAL-GEO-000052-
Haram tunnel 0+300 to 0+350 1427 1427
00-B-18.11.2023
MIP-JVC-CAL-GEO-000040-01-B-02.10.2023
0+350 to 0+400 1672 1672 1672 0 326 326 0 326 0 MIP-JVC-SHD-GEO-000071-01-B-12.10.2023 Handed
4024
over 0+353.028 to 470.033 six segment
0+400 to 0+500 3411 3411 3411 0 722 722 0 722 0 MIP-JVC-CAL-GEO-000041-02-B-05.11.2023
Vehicular tunnel room-01 0+400 to 0+500 2379 2379 1905 474 492 394 0 394 98 MIP-JVC-SHD-GEO-000069-02-B-21.11.2023 Pump
Pump station-01 0+480 93 station-01 No need for soil improvement
0+500 to 1+020 19350 19350 15436 3913 7722 5424 4296 31 4327 1097
Haram
Intersection-01 3162 3162 0 3162 868 0 0 0 868 MIP-JVC-CAL-GEO-000026-02-B
Egress stair 3 0+760 103 103 103 0 30 30 0 30 0 MIP-JVC-SHD-GEO-000040-05-B & MIP-JVC-SHD-GEO-
Egress stair 4 0+830 141 141 141 0 43 0 0 43 0 000078-00-B intersection Handed over 0+530 to 0+710
5 Ammico ZONE-02 Egress stair 2 0+530 129 129 129 0 39 39 0 39 0 & 0+770 to 0+810 -11 segments
Pump station-02 1+000 299 299 299 0 88 88 0 88 0
Utility culvert room-16 1+000
Utility culvert room-18 0+660 Under study
Utility culvert room-19 0+520
Tunnel portion 1+020 to 1+260 9043 9043 9043 0 6244 2283 2283 0 2283 0 MIP-JVC-CAL-GEO -000012-02-B-11.12.2023
Egress stair-09 1+000 700 700 333 367 210 100 0 100 110 MIP-JVC-SHD-GEO-000044-00-B-17.06.2023 MIP-JVC-
6 Ammico Zone-03 SHD-GEO-000018-03-B-20.12.2023 Handed over st
Egress stair-10 1+040 337 337 0 337 99 0 0 0 99
1+093.979 to 1+273.979 nine segments
Utility culvert room-15 st1+220 1+220
zone-04A Tunnel portion 1+260 to1+380 4247 4247 4133 114 1424 1080 1051 0 1051 29 Handed over St1+273.979 to 1+293.979 Two segments
Handed over ST 1+393.979 to 1+593.979 & 1+653.979
Zone-04B Tunnel portion 1+380 to 1+773 14545 14545 14545 0 11829 2752 2752 0 2752 0
to 1+773.979 16segments
Egress stair 13 1+333 270 270 270 0 - 68 68 0 68 0
Egress stair 14 1+333 128 128 0 128 - 33 0 0 0 33
7 Ammico Zone-04
Egress stair 17 1+633 256 256 256 0 - 64 64 0 64 0
MIP-JVC -CAL-GEO-000015-02-B-24.10.2023
Egress stair 18 1+633 128 128 128 0 - 32 32 0 32 0
MIP-JVC-SHD-GEO-000021-04-B-18.11.2023
Pump station-03 1+360 237 237 237 0 - 72 72 0 72 0
Vehicular room no 6 1+360 to 1+407 957 957 394 563 - 243 100 0 100 143
Utility culvert room-14 1+540
Under study
Utility culvert room-13 1+640
Haram 1+773 to 2+200 1+773 to 2+200 16939 16939 1360 15579 4496 320 41 361 4135
Egress stair no-19 1+860 140 140 0 140 40 0 0 0 40
MIP-JVC-CAL-GEO-000060-00-B &
Egress stair no-20 1+880 235 235 0 235 57 0 0 0 57
MIP-JVC-SHD-GEO-000079-00-B
8 Ammico Zone-05 Egress stair no-22 2+120 195 195 0 195 47 0 0 0 47
vehicular tunnel room-10 2+000 to 2+140 4187 4187 0 4187 1046 0 0 0 1046
vehicular tunnel room-12 1+760 to 1+820
Under study
Utility culvert room-11 2+040
D9-1 0+000 to 0+191.109 2270 - 968 - - - - - MIP-JVC-CAL-GEO-000028-00-B-02.07.2023 No need
MEP room-30 D9-1 st 0+020 to 0+020 224 for Soil improvement. D9-1 St0+020 to 0+100 Handed
MEP room-31 D9-1 st 0+140 to 0+180 410 over
9 Ammico Dry culvert
D9-2 0+000 to 0+238.838 1762 - - - - - - - - -
MIP-JVC-CAL-GEO-000028-00-B-02.07.2023 No need
MEP room-32 D9-2 st 0+000 to 0+020 153 - - - - - - - - -
for Soil improvement.
MEP room-33 D9-2 st 0+146 to 0+191.45 435 - - - - - - - - -
MIP-JVC-CAL-GEO-000043-01-B-17.10.2023 No need
0+040 to 0+320 11329 - - - 3302 - - - - - for Soil improvement. Handed over st 0+045 to 0+095
10 Ammico Zone-08 Kaar Tunnel & st 0+195 to 0+218
MIP-JVC-CAL-GEO-000054-00-B- 16.11.2023 Requird
0+320 to 0+552.999 10731 10731
soil improvement
MIP-JVC-CAL-GEO-000062-O Required soil
0+020 to 0+200 5300 5300 0 5300 1420 0 0 0 1420
11 Ammico Zone-07 Airport tunnel improvement TSC under review
0+200 to 0+360 4039 No need for soil improvement
204721 149048 81157 67890 54440 31268 19603 72 19718 11550