NATIONAL UNIVERSITY OF TECHNOLOGY

(Department of Civil Engineering)


Assignment – 2 (CLO-1, PLO-1, LL-C3)

Course Title : Construction Engineering Course code : CE4103


Batch Number : 2020 Date : 11th Mar 2024
Total Marks : 30 Time Allowed : 2 days
FM Name : Lec. Saad Fawad Azim Semester : Spring 2024
Student Name : ________________________ Student ID : _______________

Plagiarism: Any kind of plagiarism/copying among the class in any form will be dealt with
strictly, and zero marks will be given. Disciplinary action may also be taken depending on the
nature of the offence.
Note:
1. This assignment should be submitted in hard copy and should be hand written
2. AI generated text will not be accepted.
Question CLO-1, PLO-1, LL-C3 Total Marks: 30
Apply your apprehension of construction engineering to answer the following questions with
regards to the site visit conducted on 8th March 2024, Friday.
a. (15 Marks)
i. What types of work are underway during your visit – for example concrete pouring,
excavation of soil, steel erection, wood framing etc. Follow-up question: What are the
names of the trades performing the work you observed (carpenters, scaffolders etc.), and
what work were they performing?
ii. What are the weather conditions during your visit (temperature, precipitation, humidity,
sky cover)? How is this affecting the work?
iii. What materials are being stored, delivered, or removed from the site (excavation soil
being trucked off-site, stockpiling of lumber, plywood, aggregate etc.)
iv. What kinds of temporary supports, construction, or protection can you see (excavation
shoring, erosion control, dewatering, temporary bracing, scaffolding, formwork, tree
protection, wind protection, temporary heating, power, safety devices, etc.)? Explain
their purpose.

b. (15 Marks)
How did you inspect the slab and beam work prior to concreting (steel, electrical works, and
formwork)? Give more importance to steel work in answering this question as this was the
primary inspection done by you. Should the slab be allowed for concreting with the current
QA/QC status?