EG02.J.95.001.112NM 05 1 Publication
EG02.J.95.001.112NM 05 1 Publication
02
Code A Accepted / Final - Manufacturing can proceed. Submit As-Built Drawings when
Manufacturing is complete as identified on the RED Form.
Code B Minor Comments. Manufacturing can proceed subject to incorporation of
changes. Please resubmit.
Code C Rejected / Major Comments. Manufacturing cannot proceed until document
has achieved A or B code. Please resubmit.
ENGINEERING PROCUREMENT CONSTRUCTION & INSTALLATION (EPCI) FOR BSP EGRET EAST
Project Title : DEVELOPMENT PROJECT
SUPPLY: SUPPLY AND DELIVERY OF PRESSURE RELIEF VALVE (EGWJ-02)
Document Title : Painting Report
Document No. : EG02.J.95.001.112NM
Customer : Sapura Fabrication Sdn Bhd (Brunei)
Rev. No. : 4
Date : 12 January, 2023
Actual surface profile reading will only be recorded if this has been
Please provide the actual surface profile reading under a separate
2 requested as a special painting requirement - not offered during 30-Aug-22 Y
attachment.
quotation (standard painting report by factory).
Actual surface profile reading will only be recorded if this has been
3 Please detail out the actual surface profile reading achieved. requested as a special painting requirement - not offered during 30-Aug-22 Y
quotation (standard painting report by factory).