You are on page 1of 4

PROJECT : APARNA MALL & MULTIPLEX -Weekly Site Quality Observations (03

Basements +Ground + 05 floors +Terrace floor----->Total-9 floor slabs)

STRUCTURAL POST CONCRETE OBSERVATIONS (Dt from : 17-01-24 to 27-01-24 )


Grid or Column
S.no DATE OBSERVATION ACTIVITY LOCATION FROM SITE IMAGES RECTIFIED IMAGES
ID

Observed the bulged wall offset


found 20 to 30 mm at vertical joint Ramp side wall from B1 to
1 19-01-2024
inform to rectity by using approved
Post checking
G.F level
17,18 /J Open
methodolgy.

Observed and informed to provied the


2 21-01-2024 anchoring with lock set of the slab Prior checking Pour-4 / B1 uper level slab 8/J Closed by 22-01-24
bars into the column both sides.

Observed and informed to remove the


Pour-1 / podium level
3 20-01-2024 struck runner in the retaining wall joint Post checking
retaining wall Type-5
19 / J Open
stoper at podium level.

Observed and informed to do the


consolidation and compaction along
4 17-01-2024
the West side retaining wall back
Soil consolidation west side road soil filling 1 to 19 / near A W.I.P
filling soil.
PROJECT : APARNA MALL & MULTIPLEX -Weekly Site Quality Observations (03
Basements +Ground + 05 floors +Terrace floor----->Total-9 floor slabs)

STRUCTURAL POST CONCRETE OBSERVATIONS (Dt from : 17-01-24 to 27-01-24 )


Grid or Column
S.no DATE OBSERVATION ACTIVITY LOCATION FROM SITE IMAGES RECTIFIED IMAGES
ID

Observed and informed to remove the


5 20-01-2024
debries in all basement areas
House keeping B3 to B1 levels All Basements Open

Observed and informed to collect the


6 20-01-2024
scrap steel and stack at Ground floor.
House keeping B3 to B1 levels All Basements Open

Observed and informed to rectify the


Waterproofing
7 20-01-2024 water lekage at B3 level Type-1
works
B3 / Type-1 R/W G / 1,2 Open
Retaining wall, at vertical wall joint.

Observed and informed to start the


8 21-01-2024 ramp west side pending up stand wall Site observation B3 to B2 Ramp upstand wall 14,15 / G Open
concreting

Observed and informed to fill the slab


shutter board joint gap found up to Pour-4 up stand slab on B1
9 21-01-2024
20mm of the up stand slab Pour-4 / B1
Prior checking
level.
J,K / 7 Closed by
level.
PROJECT : APARNA MALL & MULTIPLEX -Weekly Site Quality Observations (03
Basements +Ground + 05 floors +Terrace floor----->Total-9 floor slabs)

STRUCTURAL POST CONCRETE OBSERVATIONS (Dt from : 17-01-24 to 27-01-24 )


Grid or Column
S.no DATE OBSERVATION ACTIVITY LOCATION FROM SITE IMAGES RECTIFIED IMAGES
ID

Observed and informed to rectify the


Waterproofing
10 17-01-2024 water lekage at B3 level Type-1
works
B3 / Type-1 R/W H,J / 1,2 Closed by 19-01-24
Retaining wall from tierod holes.

Observed and informed to stressing of


the PT tendon strands for pour strip
11 24-01-2024
area ,already Cube test results given 1
Post checking Podium level A / 14,15 Open
week ago.

Observed and informed to remove the


12 20-01-2024 struck runner in the fire tank wall joint Post checking B1 to G.F level. N / 14 Closed by 24-01-24
at B1 to G.F level.
PROJECT : APARNA MALL & MULTIPLEX -Weekly Site Quality Observations (03
Basements +Ground + 05 floors +Terrace floor----->Total-9 floor slabs)

STRUCTURAL POST CONCRETE OBSERVATIONS (Dt from : 17-01-24 to 27-01-24 )


Grid or Column
S.no DATE OBSERVATION ACTIVITY LOCATION FROM SITE IMAGES RECTIFIED IMAGES
ID

Observed and informed to rectify the


lift wall board joint having concrete
13 17-01-2024 undulations , bulging up to 10 to 15 Post checking B2 to B1 level K,L / 8 Open
mm and surface Honeycomb by using
approved methodolgy.

FLOORS POUR-1 POUR-2 POUR-3 POUR-4 POUR-5 Pour-6

STARTING DATE ENDING DATE STARTING DATE ENDING DATE STARTING DATE ENDING DATE STARTING DATE ENDING DATE STARTING DATE ENDING DATE STARTING DATE ENDING DATE

BASEMENT-02 27-04-2023 28-04-2023 15-08-2023 16-08-2023 22-08-2023 23-08-2023 17-12-2023 17-12-2023 11-11-2023 12-11-2023

BASEMENT-01 15-07-2023 16-07-2023 08-09-2023 09-09-2023 20-09-2023 20-09-2023 23-01-2024 23-01-2024 27-11-2023 28-11-2023

GROUND FLOOR 14-10-2023 15-10-2023 02-12-2023 03-12-2023 02-12-2023 03-12-2023 28-12-2023 29-12-2023

FIRST FLOOR

SECOND FLOOR

THIRD FLOOR

TERRACE FLOOR