You are on page 1of 6

S A

E R
/H
104278

18
/1
23
20
/
A1 Remark

S T
P U
S A
E R
/H
8
A2

1 1
/
Please refer the remark from approved drawing PUST21271

A3

2 3
2 0
/
Add stringer of T.BHD : L 300x100x8 mm @1800ABL

S T
P U
S A
E R
/H
18
/1
23
20
T /
S
P U
Busan Friday, March 10, 2023
(Encl.: 6 ) PT ORELA SHIPYARD

JALAN RAYA NGEMBOH RT. 002 RW.001, NGEMBOH-


UJUNG PANGKAH
GresikIDN INDONESIA

Our Ref.: PUST/2023/118/HERSA File No.: (X3/2023/X3/01/222 )


Subject: 104278 S-153 - DRAWING FOR APPROVAL

Copy to: 6 ) PT RINA Indonesia


Indonesia Marine

Gedung 46 Abdul Muis, 2nd Floor Jalan Abdul Muis


No. 46
10160 JAKARTA (EE) INDONESIA
Your Ref.: S153 LCT 40 M -Thursday, March 2, 2023

We send the following approved drawings:

Number Sheets Date Title Of Drawing / Your Annuls/Replaces


Ref
PUST-21269 3 Wednesday, March 8, CONSTRUCTION PROFILE
2023 - S153_A-10-003
Remarks requiring a written reply by client to this Plan Approval Centre:
A1.The detail section drawing of Fr. #37 ~ Fr. FP is to be provided for further review.
A2.The detail transverse section drawing Fr. #0 ~ Fr. #8 is to be provided for further review.
A3.Main Engine seating foundation is to be submitted for further review.
Remarks to the drawing to be managed by client and verified by the attending surveyor (a written reply to this Plan Approval
Centre is not required):
B1.Please see the comment as specified on the approved drawing.
PUST-21269
PUST-21270 1 Wednesday, March 8, BULKHEAD
2023 CONSTRUCTION-R0 -
S153_A-10-004
Remarks to the drawing to be managed by client and verified by the attending surveyor (a written reply to this Plan Approval
Centre is not required):
B1.Please see the comment as specified on the approved drawing.
B2.The minimum door sill height is to be 600 mm in position 1 and to be 380 in position 2.
PUST-21270
PUST-21271 3 Wednesday, March 8, TYPICAL TRANSVERSE
2023 SECTION - S153_A-10-
005
Remarks to the drawing to be managed by client and verified by the attending surveyor (a written reply to this Plan Approval
Centre is not required):
B1.Please see the comment as specified on the approved drawing.
PUST-21271
PUST-21272 3 Wednesday, March 8, SUPERSTRUCTURE

RINA Services S.p.A.


Korea Plan Approval Centre
14th Floor Centum Green Tower, TEL: +82 51 4655412
78 Centumjungang-Ro, Haeundae-Gu FAX: +82 51 4655535
612-020 Busan - Republic of Korea E-MAIL: segpupc@rina.org

Page 1 of 3
2023 CONSTRUCTION-R0 -
S153_A-10-006
Remarks to the drawing to be managed by client and verified by the attending surveyor (a written reply to this Plan Approval
Centre is not required):
B1.The minimum door sill height is to be 600 mm in position 1 and to be 380 mm in position 2.
B2.Please see the remark as specified on the approved drawing.
PUST-21272
PUST-21273 1 Wednesday, March 8, WHEELHOUSE
2023 CONSTRUCTION_R0 -
S153_A-10-008
Remarks to the drawing to be managed by client and verified by the attending surveyor (a written reply to this Plan Approval
Centre is not required):
B1.Please see the comment as specified on the approved drawing.
PUST-21273
PUST-21275 1 Wednesday, March 8, FUNNEL
2023 CONSTRUCTION_R0 -
S153_A-10-013
Remarks to the drawing to be managed by client and verified by the attending surveyor (a written reply to this Plan Approval
Centre is not required):
B1.Please see the comment as specified on the approved drawing.
PUST-21275

Additional Information
# IT IS BROUGHT TO YOUR KIND ATTENTION THAT APPROVAL OF THIS DRAWING IS PRELIMINARY SINCE THE TRIM AND
STABILITY BOOKLET IS NOT AVAILABLE DURING THIS PHASE OF PLAN REVIEW.

# IN PARTICULAR, IT IS DEEMED TO HIGHLIGHT THAT PLAN HAS BEEN REVIEWED UNDER THE FOLLOWING CONDITIONS
: # NAVIGATION NOTATION IS CONSIDERED AS UNRESTRICTED.
# SERVICE NOTATION CONSIDERED AS CARGO SHIP
# SCANTLING DRAUGHT AS 2.35 M (TO BE CONFIRMED BY STABILITY VERIFICATION) # MIN. BOW DRAFT AT BALLAST OR
PARTIAL LOADING CONDITION IS TO BE 0.854 M
# MAXIMUM AHEAD SERVICE SPEED IS 10 KNOTS.
# DESIGN CARGO DECK LOAD AS 5 T/SQ.M

# PLANS HAVE BEEN REVIEWED ON THE BASIS OF CURRENT RELATED APPLICABLE RULES (AS AVAILABLE IN LEOSHIP). THEY ARE
TO BE DULY CONSIDERED DURING THE ISSUANCE OF CERTIFICATES. IN CASE OF APPLICABLE RULES MODIFICATION,
ADDITIONAL REMARKS OR NEW SUBMISSION OF PLANS MAY BE NECESSARY.

# IT IS HIGHLIGHTED TO MONITOR THE PLAN APPROVAL STATUS (MISSING DOCUMENT / OPEN REMARKS) THROUGH THE
ATTENDING SURVEYOR IN CHARGE

In case of any question please contact HERLAMBANG SATRIAYOGA at Herlambang.Satriayoga@rina.org.

RINA Services S.p.A.


Korea Plan Approval Centre
14th Floor Centum Green Tower, TEL: +82 51 4655412
78 Centumjungang-Ro, Haeundae-Gu FAX: +82 51 4655535
612-020 Busan - Republic of Korea E-MAIL: segpupc@rina.org

Page 2 of 3
Yours faithfully,
RINA Services S.p.A.
DOO HWAN HAN

RINA Services S.p.A.


Korea Plan Approval Centre
14th Floor Centum Green Tower, TEL: +82 51 4655412
78 Centumjungang-Ro, Haeundae-Gu FAX: +82 51 4655535
612-020 Busan - Republic of Korea E-MAIL: segpupc@rina.org