Professional Documents
Culture Documents
TABLE OF SPECIFICATIONS
No. of Items 50
SUBJECT: TLE 10 AFA (ACP NC I) Grade Level: 10 Quarter: Third Quarter
LEVEL OF QUESTIONING
Easy Moderate Difficult
TOPICS # of Hours
Percentage
# of Test 60% 30% 10%
Taught Items
COGNITIVE LEVELS
Remembering Understanding Applying Analyzing Evaluating Creating
10 0 0
A.) Irrigation Materials, Tools,
Equipment and Structures
5 20% 10 1,2,3,4,5 6,7,8,9,10
5 5 0
B.) Routine Check-Up of Tools and
Equipment in Irrigation Work
5 20% 10 16,17,18,19,20 11,12,13,14,15
5 5 3
C.) Irrigation Systems and Components; 6.5 26% 13
38,36 21,25,33 40,34 22,23,24 35,37,39
10 0 0
D.) Common OHS Hazards, Risks and
its Control in Irrigation Work
5 20% 10 41,42,43,49,50 44,45,46,47,48
0 0 7
E.) Required Personal Protective
Equipment (PPE) in Irrigation Work
3.5 14% 7
TOTAL 25 100% 50 30 10 10