EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.
LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.
SCHEDULED TEST DATE & TIME ACTUAL TEST DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?
ITEM
TEST PROCEDURE ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-TEST DATE
No.
SAES-P-104
A1 Erect safety barriers and post safety man at conductor remote end.
Sec. 4.1
SAES-P-104
A3 Insulate overhead conductors from ground.
Sec. 4.1
Check the conductor connections & phases identification and color coded SAES-P-104
A6
as per specification and drawings. Sec. 4.1
SAES-P-104
A8 Check for proper conductor support, clamping and blocking.
Sec. 4.1
SAES-P-104
A9 Insulate associated feeder cable cores from ground.
Sec. 4.1
Page 1 of 7
SAES-P-104
A14 Check tightness of all bolted connections (Torque Wrench Method).
Sec. 4.1
Page 2 of 7
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - JUNE 2008) REV 3 30-Jun-08
SATR NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO TEST REPORT
Overhead T&D - Circuit Polarity, Continuity and Insulation
SATR-P-3219 1-Dec-09 ELECT
Resistance Testing
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
ITEM
TEST RESULTS ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-TEST DATE
No.
Check that the cable test results are recorded in the Saudi Aramco Pre- SAES-P-104
A15
Commissioning Forms. Sec. 13.5 (a)
B. TEST EQUIPMENT
Schedule Q
B2 The test equipment calibration cycle shall not exceed twelve months. Att. IV
Sec. 7
C. TEST RESULTS
D. CONCLUSIONS
ITEM
TEST RESULTS ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-TEST DATE
No.
Compare test results with previous test results and with manufacturer
SAES-P-104
D1 data corrected for temperature variations using manufacturer
Sec. 3.2
recommended correction factors.
SAES-P-104
E2 Connect C1 and P1 of the test set to one end of the conductor.
Sec. 3.2
Page 3 of 7
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - JUNE 2008) REV 3 30-Jun-08
SATR NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO TEST REPORT
Overhead T&D - Circuit Polarity, Continuity and Insulation
SATR-P-3219 1-Dec-09 ELECT
Resistance Testing
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
ITEM
TEST RESULTS ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-TEST DATE
No.
Connect the C2 and P2 of the test set to the other end of the conductor.
NOTE: Observe the correct orientation for the current circuit (C2) and the SAES-P-104
E3
potential circuit (P2) hook-ups at the opposite end (P2 connection closer Sec. 3.2
to the specimen than C2).
SAES-P-104
E4 Record result.
Sec. 3.2
SAES-P-104
F1 Test shall be performed using a Ductor, DLRO.
Sec. 3.2
Schedule Q
F2 The test equipment calibration cycle shall not exceed twelve months. Att. IV
Sec. 7
G. TEST RESULTS
Conductor # Cable type Cable length Resistance (Ω) Pass Fail Re-Test Date
H. CONCLUSIONS
Investigate any breaks in continuity, along with any resistance values in SAES-P-104
H1
excess of 10 ohms per 1000 feet of cable. Sec. 3.2
REMARKS:
REFERENCE DOCUMENTS:
1. Schedule G -- Material, Tools and Equipment (Pro Forma MP-IK-LS Contract)
2. Schedule Q -- Quality Requirements (Pro Forma Contract), February, 2008
3. SAES-P-100 Basic Power System Design Criteria, 25 June 2007
4. SAES-P-104 -- Wiring Methods and Materials, 13 January 2008
5. S A Pre-Commissioning Form # P-000 Testing Guide Lines, Issue Date (10/97)
Page 4 of 7
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - JUNE 2008) REV 3 30-Jun-08
SATR NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO TEST REPORT
Overhead T&D - Circuit Polarity, Continuity and Insulation
SATR-P-3219 1-Dec-09 ELECT
Resistance Testing
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
ITEM
TEST RESULTS ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-TEST DATE
No.
NOTES:
1. Approved - Acceptable to the authority having jurisdiction (i.e., Saudi Aramco ID).
2. Identified - Recognizable as suitable for the specific application by a qualified testing laboratory (i.e., listing and/or labeling).
3. Listed - Equipment and materials included in a list published by an approved qualified organization concerned with evaluation of products
or services, that maintains periodic inspection of production of listed equipment or materials or periodic evaluation of services, and whose listing
states
that the equipment, material, or services either meets appropriate designated standards or has been tested and found suitable for a specified
purpose.
4. Labeled - Equipment or materials to which has been attached a label, symbol, or other identifying mark of an approved qualified organization
concerned
with product evaluation, that maintains periodic inspection of production of labeled equipment or materials, and by whose labeling the manufacturer
indicates compliance with appropriate standards or performance in a specified manner.
*Person Responsible for Implementation of Test and Analysis of Results Y = YES N = NO F = FAILED
Page 5 of 7
SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - JUNE 2008) REV 3 30-Jun-08
SATR NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO TEST REPORT
Overhead T&D - Circuit Polarity, Continuity and Insulation
SATR-P-3219 1-Dec-09 ELECT
Resistance Testing
Attachment 1 --
Page 6 of 7
Page 7 of 7