Beam Design & Comparison Using Table 3.15 bs8110
Beam Design & Comparison Using Table 3.15 bs8110
LEARNING OUTCOMES:
1
Beam C/5A – 1A
Span ⑤-④
3
Plan
ly = 8000 = 1
lx 8000
βvx = 0.33
βvy = 0.33 Vsy = Vsx = 0.33 x 10.18 x 8 = 27 kN/m
Both sides V = 27 x 2 = 54 kN/m
Span 4-3
4
ALTERNATIVE METHOD
-LOADING DISTRIBUTION FOR BEAM-
Ly
Lx W = NLx
3
5
ALTERNATIVE METHOD
W = NLx/3 Lx = 8 m
= 10.18 x 8 Ly = 8 m
3
= 27 KN/m (span 4-3) – triangular shape
W = NLx [ 1 - 1 ]
2 3(Ly/Lx)² Lx = 4 m
Ly = 8 m
= 10.18 x 4 [1 - 1 ]
2 3(8/4)²
6
Plan
ly = 8000 = 2
lx 4000
7
ly = 4000 = 1
lx 4000
Span 2A – 2
Similar to span 3 – 2A
8
Loading Diagram
.5 .5 .33 .67 .5 .5
⑤ ②
+276 -275 +212.2 -212.2 36.2 - 36.2 +36.2 -36.2
+ 4.0 + 8.2
- 1.0 - 2.0 - 2.0 - 1.0 - 2.0 - 4.1 - 4.1 - 2.0
+ 1.0 + 2.0
+282.4 -258.8 +258.8 -142.8 +142.8 - 0.2 + 0.3 - 54. 2
11
Individual Moment
Span 5 - 4
R5 = R4 = 2.7 x 8 + 54 x 6 = 172.8
2 2
M5-1 = 172.8 x 1 – 2.7 (1)2 = 171.45 kN/m
2
M cL = 172.8 x 4 – 2.7 (4)2 - 54 (3)2 = 426.6 kNm
2 2
Span 4 - 3
R4 = R3 = 2.7 x 8 + 41 x 6 = 134. 2 kN
2 2
M4.1 = 134.2 x 1 – 2.7 x 12 = 132.85 kNm
2
McL = 134.2 x 4 – 2.7 (4)2 - 41 x 32 = 330.7 kNm
2 2
12
R3 = R2A = 2.7 x 4 + 2.7 x 3 = 45.9 kN
2 2
M3.1 = 45.9 x .5 – 2.7 (.5)2 = 22.6 kN/m
2
M cL = 45.9 x 2 – 2.7 (2)2 - 27(1.5)2 = 56 kNm
2 2
Span 2A – 2
Similar to Span 3 – 2A
13
Individual Shear
Span 5 - 4 V5 = 172.8 kN
V5.1 = 172.8 – 2.7 x 1 = 170.1 kN
Vc
L = 172.8 – 2.7 x 4 = 54 x 3 = 0
Span 4 - 3
V4 = 134.2 kN
V4.1 = 134.2 – 2.7 x 1 = 131.5 kN
14
Span 3-2A
V3 = 45.9 kN
V3.1 = 45.9 – 2.7 x .5 = 44.55 kN
Span 2A-2
Similar to span 3-2A
15
BMD
5 4
Shear Span 5 - 4
+172.8 - 172.8
+282.4 + 282.4
8 8
Shear Span 4-3
-258.8 -258.8
4 3 8 8
+ 134.2 - 134.2 +175.75 - 169.86
+ 258.8 + 258.8
8 8
- 142.8 - 142.8
8 8
+ 148.7 - 119.7 16
Span 3 – 2A
3 2A
+ 45.9 - 45.9
+ 142.8 + 142.8
4 4
+ 81.6 - 10.2
Span 2A - 2
+ 45.9 - 45.9
- 54.2 - 54.2
4 4
+ 32.36 - 59.5
SFD 17
Beam C/5A – 1A
Size of beam 200 x 400
400
200
k = M
fcubd2
= 156 x 106
30 x 200 x 347.52
= 0.215 > 0.156
Design as doubly reinforced beam
18
z = d (0.5 + √ (0.25 – k )
0.9
= d (0.5 + √ (0.25 – 0.156)
0.9
= 0.78 d
∴ z= 0.78 d
= 0.78 (347.5)
= 271.05 mm
As’ = (k-k’)fcubd2
0.95 fy (d-d’)
= (0.215 – 0.156)(30)(200)(347.5) 2
0.95(460)(347.5 – 52.5)
= 332 mm2
19
Area = π(12)2 = 113 mm2
4
∴ Provide 3 T12
As’ = 339 mm2
As = k’fcubd2 + As’
0.95fyz
= 0.156(30)(200)(347.5)2 + 332
0.95 (450)(271.05)
= 954 + 332 = 1286 mm2
∴ Area, π(25)2 = 491 mm2
4
∴ Provide 3T25, As = 1473 mm2
k = M
fcubd2
= 282.4 x 106
(30)(200)(347.5)2
= 0.39 > 0.156
20
∴ Compression reinforcement is required.
z = d(0.5 + √(0.25 – k)
0.9
= d (0.5 + √(0.25 – 0.156)
0.9
= 0.78 d
∴ z = 0.78 d
= 0.78 (347.5)
= 271.05 mm
As’ = (k – k’)fcubd2
0.95 fy (d – d’)
= (0.39 – 0.156)(30)(200)(347.5)2
0.95 (460)(347.5 – 52.5)
= 1315 mm2
∴ Provide 3T25, As’ = 1473 mm2
21
As = k’fcubd2 + As’
0.95 fyz
= 0.156 (30)(200)(437.5) + 1315
0.95 (460) (271.05)
= 954 + 1315 = 2269 mm
∴ Provide 5T25, As = 2455 mm2
Shear Reinforcement
Vmax = 175.8 kN
Shear stress, v =V
bd
= 175.8 x 103
200 x 347.5
= 2.53 N/mm2
100As = 100 (2455) = 3.53
bd 200 x 347.5 22
Table 3.9 - by interpolation,
vc = (0.98 – 0.91) x 52.5 + 0.91
100
= 0.947 N/mm2
v - vc = 2.53 – 0.947
= 1.583 N/mm2 400
300 347.5
(vc + 0.4) < v<0.8√fcu or 5 N/mm2
<0.8 √fcu or 5 N/mm2
1.347 <2.53 <0.8 x √30 = (4.38)
24
∴ Increase the size of beam to 250 x 500 mm
∴ Deflection ------- OK
25
26
27
28
29
30
31
32
33
34
35
Span 2A – 2, support Moment M= 54.2 kNm
k = M = 54.2 x 106
fcubd2 30x250x447.52
= 0.036 < 0.156
Design as singly reinforced beam.
Ƶ = d{ 0.5 + √ (0.25 – k )}
0.9
= {0.5 + √(0.25 – 0.036)} d
0.9
Ƶ = 0.958 d
Take Ƶ = 0.95 d = 0.95 x 447.5 = 425.13 mm
As = M = 54.2 x 106
0.87fyƵ 0.87x460x425.13
As = 319 mm2
Check min reinforcement As min = 0.26 x bh
100
Shear V = 59.45 kN
Shear stress, V = V = 59.45 x 103
bd 250 x 447.5
V = 0.53 N/mm2
min link
37
Asv ≽ 04 bvsv = 0.4 x 250 x Sv
0.87fyv 0.87 x 250
≽ 0.46 Sv
Say Sv = 250
Asv ≽ 0.46 x 250 = 115 mm2
use Øsv = 10 mm
∴ Asv = 2π(10)2 = 157.1 mm2
4
38
Conclusion
Span 5 – 4 (Beam size 250 x 500)
Support 5
39
Mid Span 5 – 4
40
Support ②
41
Support ⑤, ④, & ③
Top Reinforcement 5T 25
Bottom Reinforcement 3T25
Shear Reinforcement R10 – 125
Support 5A 2A & ②