You are on page 1of 13

View Form https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?fo...

M/s. Abdul Hakim

Bill of Quantities

Bill of Quantities

Unit
Total
Price Unit Price Total Price
Price
ItemNo Group ItemCode DescriptionofItem MeasurementUnit Quantity
In In Words In Words
In Figures
figures (BDT) (BDT)
(BDT)
(BDT)

Earthwork in excavation of foundation


trenches, including layout, by excavating
earth to the lines, grades and elevation
as shown in the drawing providing center
lines, local bench mark pillars, fixing
bamboo spikes and marking layout with
chalk powder filling baskets, carrying and Six Hundred
One Hundred
disposing of all excavated materials at a and
Building and Fifty-Five
1 5.02.01 safe distance designated by the E-I-C in cum 4.011 155.001 621.709 Twenty-One
Works point Zero
all types of soils except rocky, gravelly, point Seven
Zero One
slushy or organic soil, leveling, ramming, Zero Nine
dressing and preparing the base, etc. all
complete for an initial excavation depth
of 2m and an initial lead not exceeding
20m, including arranging all necessary
tools and equipment at work site, etc.
complete as per direction of the E-I-C.

Sand filling in foundation trenches and


inside plinth with sand (minimum FM
Seven Sixty-Six
0.50) in 150mm layers in/c leveling,
Hundred and Thousand Six
Building watering and consolidating each layer up
2 5.02.02 cum 92.373 721.001 Twenty-One 66601.025 Hundred and
Works to finished level etc. all complete as per
point Zero One point Zero
direction of the E-I-C. Dry density after
Zero One Two Five
compaction shall not be less than 95% of
MDD (STD).

Single layer brick flat soling with 1st class


Sixty
or picked bricks, true to level, Three
Thousand Four
camber/super elevation and grade Hundred and
Building Hundred and
3 5.03.01.01 including carrying bricks, filling the sqm 168.869 358.001 Fifty-Eight 60455.271
Works Fifty-Five point
interstices tightly with sand of minimum point Zero
Two Seven
FM 0.80, etc. all complete as per Zero One
One
direction of the E-I-C.

Mass concrete work in foundation or floor


with Portland Composite Cement (CEM
II/AM, 42.5N), sand (minimum FM 1.20)
and 20mm down well graded 1st
class/picked brick chips (LAA value not
exceeding 38), including shuttering,
mixing by concrete mixer machine,
casting, laying compacting with
Seventy-Nine
mechanical vibrator machine and curing Six Thousand
Thousand
for the requisite period breaking bricks Eight
Eight Hundred
Building into chips etc. all complete as per Hundred and
4 5.03.04.02 cum 11.581 6894.001 79839.426 and
Works direction of the E-I-C. Cylinder crushing Ninety-Four
Thirty-Nine
strength of concrete should not be less point Zero
point Four Two
than 10.5Mpa at 28 days of curing Zero One
Six
(suggested mix proportion 1:3:6).
Additional quantity of cement to be
added if required to attain the strength at
the contractors own cost. Mass concrete
in floor (1:3:6) with Portland Composite
Cement (CEM II/AM, 42.5N), sand
(minimum FM 1.20) and 20mm down well
graded 1st class/picked brick chips..

25mm thick Damp Proof Course (DPC)


with cement concrete (1:2:4) in Portland
Composite Cement (CEM II/AM, 42.5N), Two Thousand
Three
sand (minimum FM 1.80) and 10mm Four Hundred
Hundred and
Building down well graded 1st class/picked brick and
5 5.03.07 sqm 8.075 307.001 Seven point 2479.033
Works chips (LAA value not exceeding 38), in/c Seventy-Nine
Zero Zero
casting by concrete mixture machine, point Zero
One
compacting, curing for requisite period, Three Three
coal tar/bitumen painting, etc. all
complete as per direction of the E-I-C.

Brick work with 1st class bricks in cement Five Twenty-Seven


Building mortar (1:6) in foundation and plinth with Thousand
6 5.04.01 cum 4.671 5989.001 27974.624 Thousand Nine
Works Portland Composite cement (CEM II/AM, Nine Hundred Hundred and

1 of 13 7/12/20, 10:15 PM
View Form https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?fo...

42.5N) and best quality sand (minimum


FM1.2), filling the interstices tightly with
and
mortar, raking out joints, cleaning and Seventy-Four
Eighty-Nine
soaking bricks at least for 24 hours point Six Two
point Zero
before use, washing of sand, curing for Four
Zero One
requisite period, etc. all complete as per
direction of the E-I-C.

Brick work of Kiln 1st class


bricks/automatic machine made first
class bricks in cement mortar (1:6) in
superstructure with Portland Composite
cement (CEM II/AM, 42.5N) and best
Six Thousand Thirty-Eight
quality sand (minimum FM1.2) with
Three Thousand
uniform width and depth joints, true to
Building Hundred and Three Hundred
7 5.04.03.01.1 vertical and horizontal lines, in/c raking cum 6.061 6321.001 38311.587
Works Twenty-One and Eleven
out joints, filling interstices tightly with
point Zero point Five
mortar, cleaning and soaking bricks at
Zero One Eight Seven
least for 24 hours before use, washing of
sand, necessary scaffolding, curing for
requisite period, etc. all complete as per
direction of the E-I-C. Kiln bricks Ground
Floor

125mm brick work with Kiln 1st class


bricks/automatic machine made first
class bricks in cement mortar (1:4) with
Portland Composite cement (CEM II/AM,
42.5N) and best quality sand (minimum Eighty-Three
Nine Hundred
FM1.2) and making bond with connected Thousand Five
and
Building walls with uniform width and depth joints, Hundred and
8 5.04.10.01.1 sqm 89.180 937.001 Thirty-Seven 83561.749
Works true to vertical and horizontal lines in/c Sixty-One
point Zero
necessary scaffolding, raking out joints, point Seven
Zero One
cleaning and soaking the bricks at least Four Nine
for 24 hours before use, washing of
sand, curing for requisite period, etc. all
complete as per direction of the E-I-C.
Kiln bricks Ground Floor

RCC:1:2:4, 20MPa, Stone Chips (SC):


Reinforced cement concrete works with
minimum cement content relates to mix
ratio (tentative 1:2:4) and maximum
water cement ratio 0.40 having minimum
required average strength, f'cr = 26 Mpa
and satisfying a specified compressive
strength f'c = 20 Mpa at 28 days on
standard cylinders as per standard
practice of Code AASHTO/ ASTM and
Portland Composite Cement conforming
to BDS EN 197-1 : 2003 CEM-II 42.5N,
best quality sand of minimum FM 2.2,
20mm down well graded crushed stone
chips (Preferably stone chips from
Madhyapara, Dinajpur) (LAA value not
exceeding 35) conforming to ASTM C 33
or Aggregate Grading Appendix-3 LGED
Schedule of Rates or any other
International recognized envelop and
Water reducing chemical admixture of
complying type A under ASTM C 494, Ten Twenty
in/c cost of breaking chips, screening Thousand Six Thousand Two
Building through proper sieves, cleaning and Hundred and Hundred and
9 5.05.02.01 cum 1.903 10630.001 20228.892
Works washing thoroughly, centering, shuttering Thirty point Twenty-Eight
in position, with plain 16 BWG steel Zero Zero point Eight
sheet fitted over 38mm thick wooden One Nine Two
plank panels suitably braced and
Standard size Bamboo Props making
shuttering fully leak proof, placing of
reinforcement cage in position, mixing
the aggregates with standard mixer
machine with hoper, fed by standard
measuring boxes, maintaining allowable
slump of 75mm to 100mm casting in
steel forms, compacting by Mechanical
vibrators and tapered rods and curing at
least for 28 days, removing centering-
shuttering after approved specified time
period, i/c cost of additional testing
charges of materials and cylinders
required. Excluding the cost of
reinforcement and its fabrication,
welding, coupling, placing, binding etc.
additional quantity of Plasticizer i.e.
Water reducing chemical admixture of
complying type A under ASTM C 494 to
reduce mixing water required for normal

2 of 13 7/12/20, 10:15 PM
View Form https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?fo...

workability and to maintain low water-


cement (W/C) ratio (Doses of admixture
to be fixed by the mix design from
approved laboratory instruction by the
Engineer) Additional quantity of cement
to be added if required to attain the
strength at the contractor's own cost etc.
all complete as per direction and
approval of the Engineer in charge.Note :
Using Concrete Mixer. In individual and
continuous footing of column, raft and
floor slab at plinth level.

RCC:1:2:4, 20MPa, Stone Chips (SC):


Reinforced cement concrete works with
minimum cement content relates to mix
ratio (tentative 1:2:4) and maximum
water cement ratio 0.40 having minimum
required average strength, f'cr = 26 Mpa
and satisfying a specified compressive
strength f'c = 20 Mpa at 28 days on
standard cylinders as per standard
practice of Code AASHTO/ ASTM and
Portland Composite Cement conforming
to BDS EN 197-1 : 2003 CEM-II 42.5N,
best quality sand of minimum FM 2.2,
20mm down well graded crushed stone
chips (Preferably stone chips from
Madhyapara, Dinajpur) (LAA value not
exceeding 35) conforming to ASTM C 33
or Aggregate Grading Appendix-3 LGED
Schedule of Rates or any other
International recognized envelop and
Water reducing chemical admixture of
complying type A under ASTM C 494,
in/c cost of breaking chips, screening
through proper sieves, cleaning and
washing thoroughly, centering, shuttering
in position, with plain 16 BWG steel
sheet fitted over 38mm thick wooden Eleven One Lakh
plank panels suitably braced and Thousand Fifty-Three
Standard size Bamboo Props making Seven Thousand Nine
Building
10 5.05.02.02 shuttering fully leak proof, placing of cum 13.134 11723.001 Hundred and 153969.895 Hundred and
Works
reinforcement cage in position, mixing Twenty-Three Sixty-Nine
the aggregates with standard mixer point Zero point Eight
machine with hoper, fed by standard Zero One Nine Five
measuring boxes, maintaining allowable
slump of 75mm to 100mm casting in
steel forms, compacting by Mechanical
vibrators and tapered rods and curing at
least for 28 days, removing centering-
shuttering after approved specified time
period, i/c cost of additional testing
charges of materials and cylinders
required. Excluding the cost of
reinforcement and its fabrication,
welding, coupling, placing, binding etc.
additional quantity of Plasticizer i.e.
Water reducing chemical admixture of
complying type A under ASTM C 494 to
reduce mixing water required for normal
workability and to maintain low water-
cement (W/C) ratio (Doses of admixture
to be fixed by the mix design from
approved laboratory instruction by the
Engineer) Additional quantity of cement
to be added if required to attain the
strength at the contractor's own cost etc.
all complete as per direction and
approval of the Engineer in charge.Note :
Using Concrete Mixer. In foundation
beam

RCC:1:2:4, 20MPa, Stone Chips (SC):


Reinforced cement concrete works with
minimum cement content relates to mix
ratio (tentative 1:2:4) and maximum Three Lakh
water cement ratio 0.40 having minimum Fifteen
Twenty-One
required average strength, f'cr = 26 Mpa Thousand
Thousand
Building and satisfying a specified compressive Three
11 5.05.02.03.1 cum 21.030 15300.001 321759.021 Seven
Works strength f'c = 20 Mpa at 28 days on Hundred
Hundred and
standard cylinders as per standard point Zero
Fifty-Nine point
practice of Code AASHTO/ ASTM and Zero One
Zero Two One
Portland Composite Cement conforming
to BDS EN 197-1 : 2003 CEM-II 42.5N,
best quality sand of minimum FM 2.2,

3 of 13 7/12/20, 10:15 PM
View Form https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?fo...

20mm down well graded crushed stone


chips (Preferably stone chips from
Madhyapara, Dinajpur) (LAA value not
exceeding 35) conforming to ASTM C 33
or Aggregate Grading Appendix-3 LGED
Schedule of Rates or any other
International recognized envelop and
Water reducing chemical admixture of
complying type A under ASTM C 494,
in/c cost of breaking chips, screening
through proper sieves, cleaning and
washing thoroughly, centering, shuttering
in position, with plain 16 BWG steel sheet
fitted over 38mm thick wooden plank
panels suitably braced and Standard size
Bamboo Props making shuttering fully
leak proof, placing of reinforcement cage
in position, mixing the aggregates with
standard mixer machine with hoper, fed
by standard measuring boxes,
maintaining allowable slump of 75mm to
100mm casting in steel forms,
compacting by Mechanical vibrators and
tapered rods and curing at least for 28
days, removing centering-shuttering after
approved specified time period, i/c cost of
additional testing charges of materials
and cylinders required. Excluding the
cost of reinforcement and its fabrication,
welding, coupling, placing, binding etc.
additional quantity of Plasticizer i.e.
Water reducing chemical admixture of
complying type A under ASTM C 494 to
reduce mixing water required for normal
workability and to maintain low water-
cement (W/C) ratio (Doses of admixture
to be fixed by the mix design from
approved laboratory instruction by the
Engineer) Additional quantity of cement
to be added if required to attain the
strength at the contractor's own cost etc.
all complete as per direction and
approval of the Engineer in charge.Note :
Using Concrete Mixer. In pedestal,
column, capital lift wall and wall : Below
Plinth Level and in Ground Floor

RCC:1:2:4, 20MPa, Stone Chips (SC):


Reinforced cement concrete works with
minimum cement content relates to mix
ratio (tentative 1:2:4) and maximum
water cement ratio 0.40 having minimum
required average strength, f'cr = 26 Mpa
and satisfying a specified compressive
strength f'c = 20 Mpa at 28 days on
standard cylinders as per standard
practice of Code AASHTO/ ASTM and
Portland Composite Cement conforming
to BDS EN 197-1 : 2003 CEM-II 42.5N,
best quality sand of minimum FM 2.2,
20mm down well graded crushed stone
chips (Preferably stone chips from
Madhyapara, Dinajpur) (LAA value not
exceeding 35) conforming to ASTM C 33
or Aggregate Grading Appendix-3 LGED Twelve
Twenty-Nine
Schedule of Rates or any other Thousand
Thousand One
Building International recognized envelop and Nine Hundred
12 5.05.02.04.1 cum 2.256 12915.001 29136.242 Hundred and
Works Water reducing chemical admixture of and Fifteen
Thirty-Six point
complying type A under ASTM C 494, point Zero
Two Four Two
in/c cost of breaking chips, screening Zero One
through proper sieves, cleaning and
washing thoroughly, centering, shuttering
in position, with plain 16 BWG steel
sheet fitted over 38mm thick wooden
plank panels suitably braced and
Standard size Bamboo Props making
shuttering fully leak proof, placing of
reinforcement cage in position, mixing
the aggregates with standard mixer
machine with hoper, fed by standard
measuring boxes, maintaining allowable
slump of 75mm to 100mm casting in
steel forms, compacting by Mechanical
vibrators and tapered rods and curing at
least for 28 days, removing centering-
shuttering after approved specified time

4 of 13 7/12/20, 10:15 PM
View Form https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?fo...

period, i/c cost of additional testing


charges of materials and cylinders
required. Excluding the cost of
reinforcement and its fabrication,
welding, coupling, placing, binding etc.
additional quantity of Plasticizer i.e.
Water reducing chemical admixture of
complying type A under ASTM C 494 to
reduce mixing water required for normal
workability and to maintain low water-
cement (W/C) ratio (Doses of admixture
to be fixed by the mix design from
approved laboratory instruction by the
Engineer) Additional quantity of cement
to be added if required to attain the
strength at the contractor's own cost etc.
all complete as per direction and
approval of the Engineer in charge.Note :
Using Concrete Mixer. In Tie Beam and
Lintel : Below Plinth Level and in Ground
Floor

RCC:1:2:4, 20MPa, Stone Chips (SC):


Reinforced cement concrete works with
minimum cement content relates to mix
ratio (tentative 1:2:4) and maximum
water cement ratio 0.40 having minimum
required average strength, f'cr = 26 Mpa
and satisfying a specified compressive
strength f'c = 20 Mpa at 28 days on
standard cylinders as per standard
practice of Code AASHTO/ ASTM and
Portland Composite Cement conforming
to BDS EN 197-1 : 2003 CEM-II 42.5N,
best quality sand of minimum FM 2.2,
20mm down well graded crushed stone
chips (Preferably stone chips from
Madhyapara, Dinajpur) (LAA value not
exceeding 35) conforming to ASTM C 33
or Aggregate Grading Appendix-3 LGED
Schedule of Rates or any other
International recognized envelop and
Water reducing chemical admixture of
complying type A under ASTM C 494,
in/c cost of breaking chips, screening
through proper sieves, cleaning and
washing thoroughly, centering, shuttering
in position, with plain 16 BWG steel
sheet fitted over 38mm thick wooden
plank panels suitably braced and
Thirteen
Standard size Bamboo Props making One Lakh
Thousand
shuttering fully leak proof, placing of Twenty-Two
Three
Building reinforcement cage in position, mixing Thousand Nine
13 5.05.02.05.1 cum 9.240 13307.001 Hundred and 122956.689
Works the aggregates with standard mixer Hundred and
Seven point
machine with hoper, fed by standard Fifty-Six point
Zero Zero
measuring boxes, maintaining allowable Six Eight Nine
One
slump of 75mm to 100mm casting in
steel forms, compacting by Mechanical
vibrators and tapered rods and curing at
least for 28 days, removing centering-
shuttering after approved specified time
period, i/c cost of additional testing
charges of materials and cylinders
required. Excluding the cost of
reinforcement and its fabrication,
welding, coupling, placing, binding etc.
additional quantity of Plasticizer i.e.
Water reducing chemical admixture of
complying type A under ASTM C 494 to
reduce mixing water required for normal
workability and to maintain low water-
cement (W/C) ratio (Doses of admixture
to be fixed by the mix design from
approved laboratory instruction by the
Engineer) Additional quantity of cement
to be added if required to attain the
strength at the contractor's own cost etc.
all complete as per direction and
approval of the Engineer in charge.Note :
Using Concrete Mixer. In Tee Beam, Ell
Beam, Rectangular Beam etc. (exposed
breadth and width of ribs to be measured
only). Below Plinth Level and in Ground
Floor

5 of 13 7/12/20, 10:15 PM
View Form https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?fo...

RCC:1:2:4, 20MPa, Stone Chips (SC):


Reinforced cement concrete works with
minimum cement content relates to mix
ratio (tentative 1:2:4) and maximum
water cement ratio 0.40 having minimum
required average strength, f'cr = 26 Mpa
and satisfying a specified compressive
strength f'c = 20 Mpa at 28 days on
standard cylinders as per standard
practice of Code AASHTO/ ASTM and
Portland Composite Cement conforming
to BDS EN 197-1 : 2003 CEM-II 42.5N,
best quality sand of minimum FM 2.2,
20mm down well graded crushed stone
chips (Preferably stone chips from
Madhyapara, Dinajpur) (LAA value not
exceeding 35) conforming to ASTM C 33
or Aggregate Grading Appendix-3 LGED
Schedule of Rates or any other
International recognized envelop and
Water reducing chemical admixture of
complying type A under ASTM C 494,
in/c cost of breaking chips, screening
through proper sieves, cleaning and
washing thoroughly, centering, shuttering
in position, with plain 16 BWG steel
sheet fitted over 38mm thick wooden
plank panels suitably braced and
Standard size Bamboo Props making Thirteen Two Lakh
shuttering fully leak proof, placing of Thousand Eighty-Five
Building reinforcement cage in position, mixing Two Hundred Thousand Five
14 5.05.02.06.1 cum 21.611 13213.001 285546.165
Works the aggregates with standard mixer and Thirteen Hundred and
machine with hoper, fed by standard point Zero Forty-Six point
measuring boxes, maintaining allowable Zero One One Six Five
slump of 75mm to 100mm casting in
steel forms, compacting by Mechanical
vibrators and tapered rods and curing at
least for 28 days, removing centering-
shuttering after approved specified time
period, i/c cost of additional testing
charges of materials and cylinders
required. Excluding the cost of
reinforcement and its fabrication,
welding, coupling, placing, binding etc.
additional quantity of Plasticizer i.e.
Water reducing chemical admixture of
complying type A under ASTM C 494 to
reduce mixing water required for normal
workability and to maintain low water-
cement (W/C) ratio (Doses of admixture
to be fixed by the mix design from
approved laboratory instruction by the
Engineer) Additional quantity of cement
to be added if required to attain the
strength at the contractor's own cost etc.
all complete as per direction and
approval of the Engineer in charge.Note :
Using Concrete Mixer. In roof slab of all
types, cantilever slab and drop panels
(excluding floor slab of ground floor at
plinth level). Below Plinth Level and in
Ground Floor

RCC:1:2:4, 20MPa, Stone Chips (SC):


Reinforced cement concrete works with
minimum cement content relates to mix
ratio (tentative 1:2:4) and maximum
water cement ratio 0.40 having minimum
required average strength, f'cr = 26 Mpa
and satisfying a specified compressive
strength f'c = 20 Mpa at 28 days on
standard cylinders as per standard
practice of Code AASHTO/ ASTM and Eighteen
Ten Thousand
Portland Composite Cement conforming Thousand
Nine Hundred
Building to BDS EN 197-1 : 2003 CEM-II 42.5N, AND
15 5.05.02.07.1 cum 0.606 18038.001 10931.029 and Thirty-One
Works best quality sand of minimum FM 2.2, Thirty-Eight
point Zero Two
20mm down well graded crushed stone point Zero
Nine
chips (Preferably stone chips from Zero One
Madhyapara, Dinajpur) (LAA value not
exceeding 35) conforming to ASTM C 33
or Aggregate Grading Appendix-3 LGED
Schedule of Rates or any other
International recognized envelop and
Water reducing chemical admixture of
complying type A under ASTM C 494,
in/c cost of breaking chips, screening

6 of 13 7/12/20, 10:15 PM
View Form https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?fo...

through proper sieves, cleaning and


washing thoroughly, centering, shuttering
in position, with plain 16 BWG steel sheet
fitted over 38mm thick wooden plank
panels suitably braced and Standard size
Bamboo Props making shuttering fully
leak proof, placing of reinforcement cage
in position, mixing the aggregates with
standard mixer machine with hoper, fed
by standard measuring boxes,
maintaining allowable slump of 75mm to
100mm casting in steel forms,
compacting by Mechanical vibrators and
tapered rods and curing at least for 28
days, removing centering-shuttering after
approved specified time period, i/c cost of
additional testing charges of materials
and cylinders required. Excluding the
cost of reinforcement and its fabrication,
welding, coupling, placing, binding etc.
additional quantity of Plasticizer i.e.
Water reducing chemical admixture of
complying type A under ASTM C 494 to
reduce mixing water required for normal
workability and to maintain low water-
cement (W/C) ratio (Doses of admixture
to be fixed by the mix design from
approved laboratory instruction by the
Engineer) Additional quantity of cement
to be added if required to attain the
strength at the contractor's own cost etc.
all complete as per direction and
approval of the Engineer in charge.Note :
Using Concrete Mixer. In sunshade,
cornice, railing, drop wall, louver and fins
(Average 62mm to 87mm thick) Below
Plinth Level and in Ground Floor

RCC:1:2:4, 20MPa, Stone Chips (SC):


Reinforced cement concrete works with
minimum cement content relates to mix
ratio (tentative 1:2:4) and maximum
water cement ratio 0.40 having minimum
required average strength, f'cr = 26 Mpa
and satisfying a specified compressive
strength f'c = 20 Mpa at 28 days on
standard cylinders as per standard
practice of Code AASHTO/ ASTM and
Portland Composite Cement conforming
to BDS EN 197-1 : 2003 CEM-II 42.5N,
best quality sand of minimum FM 2.2,
20mm down well graded crushed stone
chips (Preferably stone chips from
Madhyapara, Dinajpur) (LAA value not
exceeding 35) conforming to ASTM C 33
or Aggregate Grading Appendix-3 LGED
Schedule of Rates or any other
International recognized envelop and
Water reducing chemical admixture of
complying type A under ASTM C 494, Thirteen
in/c cost of breaking chips, screening Thousand Sixty-Five
through proper sieves, cleaning and Seven Thousand
Building
16 5.05.02.08.1 washing thoroughly, centering, shuttering cum 4.763 13710.001 Hundred and 65300.735 Three Hundred
Works
in position, with plain 16 BWG steel Ten point point Seven
sheet fitted over 38mm thick wooden Zero Zero Three Five
plank panels suitably braced and One
Standard size Bamboo Props making
shuttering fully leak proof, placing of
reinforcement cage in position, mixing
the aggregates with standard mixer
machine with hoper, fed by standard
measuring boxes, maintaining allowable
slump of 75mm to 100mm casting in
steel forms, compacting by Mechanical
vibrators and tapered rods and curing at
least for 28 days, removing centering-
shuttering after approved specified time
period, i/c cost of additional testing
charges of materials and cylinders
required. Excluding the cost of
reinforcement and its fabrication,
welding, coupling, placing, binding etc.
additional quantity of Plasticizer i.e.
Water reducing chemical admixture of
complying type A under ASTM C 494 to
reduce mixing water required for normal

7 of 13 7/12/20, 10:15 PM
View Form https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?fo...

workability and to maintain low water-


cement (W/C) ratio (Doses of admixture
to be fixed by the mix design from
approved laboratory instruction by the
Engineer) Additional quantity of cement
to be added if required to attain the
strength at the contractor's own cost etc.
all complete as per direction and
approval of the Engineer in charge.Note :
Using Concrete Mixer. In Stair case slab
and step Below Plinth Level and in
Ground Floor

Supplying and fabrication of Ribbed or


deformed bar reinforcement for all types
of RCC work including straightening,
removing ruts, cleaning, cutting, hooking,
bending, lapping and/or welding
wherever required as directed, placing in
position, tieing with 22 BWG black
annealed binding wire (PVC coated in
case of FBEC rebar) double fold, cost of
binding wire and anchoring to the
adjoining members wherever necessary,
supplying and placing with proper cover
blocks (1:1), supports, chairs, spacers,
splices or laps etc. including cost of all
materials, cost of labour, cost of
equipment & machinery, loading and
unloading, transportation, all other
incidental charges and work at all leads
and lifts etc. to complete the work as per
design, drawing, specifications and
direction of the E-I-C. Measurement
relating to nominal mass, dimensions Ten Lakh
and tolerances of various types of steel Seventy-Eight
shall conform to relevant BDS/ ASTM Seventy-Eight Thousand Nine
Building
17 5.06.01.02 codes. Reinforcement shall be measured kg 13833.129 78.001 point Zero 1078997.895 Hundred and
Works
only in lengths of bar as actually placed Zero One Ninety-Seven
in position on standard weight i.e. 7850 point Eight
kg/m3 (BNBC Table 6.2.1) basis. No Nine Five
separate payment shall be allowed for
Chairs of any shape & profile, spacer bar
of any shape & profile, lap/ splice unless
otherwise shown in the drawing,
wastages, binding wire, concrete cover
blocks etc. as the cost of these is
included in the unit rate. Note: Tests for
reinforcing bars shall be conducted at
LGED/ BUET/ DUET/ CUET/ KUET/
RUET. Grade 400 (RB 400/ 400W):
Ribbed or Deformed bar produced and
marked as per BDS ISO 6935-2:2006
with minimum yield strength, fy (ReH) =
400 MPa, but the tested yield strength
shall not exceed fy by more than the 125
MPa and the ratio of tested ultimate
strength, fu (Re) to tested yield strength
(fy) shall be at least 1.25 and minimum
elongation after fracture (A5.65) &
minimum total elongation at maximum
force (Agt) is 14% and 2.5% respectively.

Minimum 12mm thick cement plaster


(1:4) with Portland Composite cement
(CEM II/AM, 42.5N) and best quality
sand (minimum FM1.2) to dado, plinth
Two Hundred Fifteen
wall up to 150mm below ground level,
and Thousand Nine
Building water tank or any where directed with
18 5.12.01 sqm 64.438 247.001 Forty-Seven 15916.250 Hundred and
Works neat cement finishing in/c washing of
point Zero Sixteen point
sand, racking out joint and picking up
Zero One Two Five
cement morter i/c finishing the edges and
corners and curing for the requisite
period etc. all complete as per direction
of the E-I-C.

Minimum 12mm thick cement plaster


(1:6) with Portland Composite cement
(CEM II/AM, 42.5N) and best quality Forty-Six
Two Hundred
sand (minimum FM1.2) to wall both inner Thousand Four
Building and Fifteen
19 5.12.02.01 and outer surface, finishing the corner sqm 216.059 215.001 46452.901 Hundred and
Works point Zero
and edges in/c washing of sand cleaning Fifty-Two point
Zero One
the surface, scaffolding and curing for the Nine Zero One
requisite period etc. all complete as per
direction of the E-I-C. Ground floor

8 of 13 7/12/20, 10:15 PM
View Form https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?fo...

Minimum 6mm thick cement plaster (1:4)


with Portland Composite cement (CEM
II/AM, 42.5N) and best quality sand Seventy
(minimum FM1.2) to ceiling RCC One Hundred Thousand
columns, beams, surface of stair case, and Three Hundred
Building
20 5.12.03.01 sunshades, cornices, railings, drop wall, sqm 353.709 199.001 Ninety-Nine 70388.445 and
Works
louvers, fins and finishing the corners point Zero Eighty-Eight
and edges in/c washing of sand cleaning Zero One point Four
the surface, scaffolding and curing for the Four Five
requisite period etc. all complete as per
direction of the E-I-C. Ground Floor

Plaster rule pointing works


250mmx75mm size as brick shape by
10mmx10mm grove on outside wall over
minimum 12mm thick cement plaster
Two Hundred Twenty-Two
(1:6) with Portland Composite cement
and Thousand Five
Building (CEM II/AM, 42.5N), best quality sand
21 5.12.22 sqm 84.254 268.001 Sixty-Eight 22580.156 Hundred and
Works (minimum FM1.2), finishing the corners
point Zero Eighty point
and edges including washing of sand,
Zero One One Five Six
cleaning the surface, scaffolding and
curing for requisite period etc. all
complete as per drawing and direction of
the E-I-C.

Providing drip course/nosing/throating at


the edge of sunshade or cornice with Seven
One Hundred
cement mortar (1:2) with Portland Thousand Two
and
Building Composite cement (CEM II/AM, 42.5N) Hundred and
22 5.12.10 m 58.330 124.001 Twenty-Four 7232.978
Works and best quality sand (minimum FM1.2) Thirty-Two
point Zero
in/c. scaffolding, curing at least for 7 days point Nine
Zero One
etc. all complete for all floors as per Seven Eight
direction of the E-I-C .

25mm thick artificial patent stone floor


(1:2:4) with Portland Composite cement
(CEM II/AM, 42.5N), best quality coarse
Sixty
sand (minimum FM1.8) and 10mm down Three
Thousand
well graded picked brick chips (LAA Hundred and
Building Eight Hundred
23 5.13.01 value not exceeding 38) in/c breaking sqm 191.358 318.001 Eighteen 60852.035
Works and Fifty-Two
graded picked chips, screening, mixing, point Zero
point Zero
laying the concrete in alternate panels, Zero One
Three Five
compacting and finishing the top with
neat cement, curing, etc. all complete as
per direction of the E-I-C.

Painting with plastic emulsion paint of


best quality and approved colour in a
seal container from authorized
manufacturer. Applying each coat and
successive coat is to be applied as per
manufacturer special procedure, to wall
and ceiling in two coats over a coat of
priming coat of water sealer and ready
mixed putty of approved brand. It applied
on sand papered and cleaned surface
Eighty-Nine
and after drying applied sealer coat, 2
Thousand
coats of ready mixed wall putty of Two Hundred
Seven
Building approved brand, each coat dried and and Two point
24 5.16.05.01 sqm 444.272 202.001 89743.388 Hundred and
Works smoothened by sand papering. Applying Zero Zero
Forty-Three
plastic emulsion paint one vertical and One
point Three
one horizontal coat for each coat and
Eight Eight
successive coat is to be applied after
drying up of previous coat by brush/roller
/spray in/c cleaning the plinth, floors,
doors, windows, portions and ventilators
by washing, rubbing, as necessary and
sand papering the surface and necessary
scaffolding, etc. curing for the requisite
period etc. all complete for all floors i/c
cost of all materials as per direction of
the E-I-C.

On exterior surface applying as per


manufacturer instruction specific coat of
weather coat of approved quality and
colour delivered from authorized local
agent of the manufacturer in a sealed
container. Applying one vertical and one Forty-Five
Two Hundred
horizontal coat for each coat and Thousand
Building and Fifteen
25 5.16.09.01 successive coat is to be applied after sqm 209.750 215.001 45096.460 AND
Works point Zero
drying up of previous coat by brush/roller Ninety-Six
Zero One
/spray in/c cleaning, washing, rubbing, as point Four Six
necessary and sand papering the surface
and necessary scaffolding, etc. all
complete for all floors i/c cost of all
materials as per direction of the E-I-C. 3

9 of 13 7/12/20, 10:15 PM
View Form https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?fo...

coat

Manufacturing, supplying, fitting and


fixing collapsible gate made of
20mmx20mmx3mm/25mmx25mmx3mm
MS angle placed @112mm c/c vertically
and connecting the same with each other
with 20mmx3mm/25mmx3mm MS flat
bar scissors 525mm/600mm long
provided in three rows in/c cutting the
different MS members to required sizes,
fabricating, welding, riveting with required
size rivets, providing required size
wheels, pulling handles on both sides,
suitable looking arrangement and finally
Twenty-Three
placing the same in position in between Three
Thousand
two nos. 50mmx50mmx6mm MS Tee rail Thousand Six
Eight Hundred
Building made by welding two nos. 50mmx6mm Hundred and
26 5.18.01.01 sqm 6.497 3669.001 23837.499 and
Works MS flat bar fitted and fixed at top and Sixty-Nine
Thirty-Seven
bottom with R.C.C. lintel/roof slab, floors point Zero
point Four
and side wall with required nos. 150mm Zero One
Nine Nine
to 225mm long 38mmx6mm MS flat bar
clamps one end welded with the gate
member and the other end bifurcated
and embedded in Cement Concrete
(1:2:4) in/c cutting holes and mending
good the damages, painting two coats
with approved synthetic enamel paint
over a coat of anticorrosive painting etc.
all complete as per drawing and design
and direction of E-I-C. Collapsible gate
made of 20mm x 20mm x 3mm M.S.
angle as vertical member and 20mm x
3mm F.I bar as scissors.

Supplying, fitting and fixing verandah


drop or ventilation Grill or anywhere as
directed made of 10mmX10mm MS
square bar series @ 35mm c/c
Horizontally (25mm gap inbetween) and
1 pair vertical 10mmX10mm squre bar
with 25mm gap @ 535mm c/c between
Three
consecutive pair, welded to outer frame Thirty-Two
Thousand
made of MS flat bar of size 25mmx3mm Thousand Two
Two Hundred
Building having anchoring Clamps of Hundred and
27 5.10.14 sqm 9.866 3268.001 and 32242.098
Works 25mmx25mmx3mm MS Angle @750mm Forty-Two
Sixty-Eight
c/c to be embaded in RCC or Brick work point Zero
point Zero
i/c cost of fabricating, cutting, welding, Nine Eight
Zero One
painting 2 coats of synthetic enamel paint
over a coat of anticorrosive priming in/c.
cutting grooves in the R.C.C. or brick
work, mending good the damages with
Cement Concrete (1:2.4) for all floors etc.
all complete as per design and direction
of the E-I-C.

Supplying, fitting & fixing of Pad lock &


Two Thousand
key heavy duty Steel sheet body of Four Hundred
Nine Hundred
approved and accepted color, quality and and
Building and
28 5.08.30.01 type made in India or equivalent best each 7.000 426.001 Twenty-Six 2982.007
Works Eighty-Two
quality etc. all complete as per direction point Zero
point Zero
of the E-I-C. 75mm Pad lock & key heavy Zero One
Zero Seven
duty Steel sheet body

Painting to dado, skirting, out side plinth


wall from 6'' below GL to plinth level with
two coats of synthetic enamel paint of
prior approved colour and brand over a
Twelve
coat of priming. Applying one vertical and
One Hundred Thousand Two
one horizontal coat for each coat and
Building and Ninety Hundred and
29 5.16.10.04 successive coat is to be applied after sqm 64.438 190.001 12243.284
Works point Zero Forty-Three
drying up of previous coat by brush/
Zero One point Two
roller/ spray in/c cleaning, washing,
Eight Four
rubbing, as necessary and sand papering
the surface and necessary scaffolding,
etc. all complete for all floors i/c cost of
all materials as per direction of the E-I-C.

Inscribing (writing) the name plate with


some selected information like as name
of School/ Organisation, year of Nine Hundred Three
construction, project, implementing and Thousand Six
Building agency, location (Upazila, District or any
30 5.12.25 sqm 3.658 987.001 Eighty-Seven 3610.450 Hundred and
Works other selected information) in front of point Zero Ten point Four
Building or where select by the authority Zero One Five
with Sand cement morter (2:1) of
Portland Composite cement (CEM II/AM,

10 of 13 7/12/20, 10:15 PM
View Form https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?fo...

42.5N) and best quality sand (minimum


FM1.2) in Bengali letters of standard size
and fonts which 12mm thick raised
over12mm thick cement plaster surface,
including finishing the corner and edges,
washing of sand, cleaning the surface,
scaffolding and curing for the requisite
period and Painting two coats of weather
coating over a coat of priming of
approved best quality paint and colour
etc. all complete as accepted by the
Engineer-in-charge.

Supplying, fitting and fixing stair railing or


any where directed made of 50mm dia GI
pipe of minimum wall thickness 2.90mm
hand rail on top and 20mm dia GI pipe
series of minimum wall thickness
2.1mm-2.2mm provided 50mm c/c
parallel to hand rail as per drawing (top
and bottom gap 125mm) fixed with
Three
vertical 40mm dia GI pipe post minimum
Thousand Twenty-Seven
wall thickness 2.65mm @ 900mm c/c
Seven Thousand Five
Building which fixed in 6mm thick MS plate angle
31 5.19.04 sqm 7.284 3778.001 Hundred and 27518.959 Hundred and
Works cleat (top 75mmx75mm and vertical
Seventy-Eight Eighteen point
75mmx100mm) welded to vertical post
point Zero Nine Five Nine
fixed to stair concrete with 12mm dia MS
Zero One
royal bolt (4 nos) i/c cost of fabricating,
cutting, bending, welding, painting 2
coats of synthetic enamel paint over a
coat of anticorrosive priming in/c. cutting
grooves in the R.C.C. or brick work,
mending good the damages with C.C.
(1:2.4) for all floors etc. all complete as
per design and direction of the E-I-C.

Providing and maintenance one project


profile signboards of the size not
exceeding 1 m x 2 m, to be placed at a
One
suitable place of the site including One Thousand
Thousand
submission of proposals for the materials Nine Hundred
Additional Nine Hundred
32 CE.01.1.7 of the signboards and text layout to the each 1.000 1936.001 1936.001 and Thirty-Six
Item and Thirty-Six
Engineer for approval which will be point Zero
point Zero
positioned as directed by the Engineer Zero One
Zero One
and removing the same on completion of
the Works or as instructed by the
Engineer.

Marble stone laying in wall or brick


massonry works with Indian or equivalent
Asian country best quality white marble
stone of approved quality, texture and
size fixed over 25mm thick cement sand
mortar (1:2) or 75mm thick cement
concrete (1:3:6) with Portland Composite
cement (CEM II/AM, 42.5N) and best
quality sand (minimum FM1.2) including
Four
placing cement slurry below the stone, Three
Thousand
cutting the marble stone to desired size, Thousand Two
Two Hundred
Building grinding and finishing the edges, Hundred and
33 5.15.17.01 sqm 0.766 4229.001 and 3239.415
Works inscribing the necessary information in Thirty-Nine
Twenty-Nine
Bengali lettering i/c setting in position in point Four One
point Zero
proper level filling the gaps with white Five
Zero One
cement and colouring pigments including
supplying all necessary equipments /
materials and finishing, polishing the top
by pumic stone and necessary auxiliary
materials and water, electricity and other
charges complete in all respect as per
direction of the E-I-C. 12 mm thick White
Marble stone (Indian) or equivalent Asian
country best quality

Supplying, fitting and fixing in position


flag stand made by 40mm dia stainless
steel pipe of 2.50mm wall thickness and
standard length (length minimum 6.02m
or as per drawing) with 3 nos stainless
steel flag hook of standard size and Seven Four Thousand
minimum 0.762mx0.457m size or Hundred and Five Hundred
Building
34 5.19.14 standard size Bangladesh national flag m 6.000 766.001 Sixty-Six 4596.006 and Ninety-Six
Works
made by best quality fabrics. The bottom point Zero point Zero
part of the flag stand (stainless steel Zero One Zero Six
same Pipe) embedded to Cement
concrete (1:2:4) base fixed with M.S
clamp of standard size and length, i/c
cutting the pipe, welding, finishing,

11 of 13 7/12/20, 10:15 PM
View Form https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?fo...

polishing and cost of all other materials


and labour, etc. all complete as per
drawing and direction of the E.I.C.

Supplying, fitting and fixing verandah


railing or any where as directed made of
20mm dia GI pipe of minimum wall
thickness 2.1mm-2.2mm @ 100mm c/c
and 50mm dia GI pipe of minimum wall
thickness 2.65mm top in horizontal ways
(top and bottom gap 125mm) as per
design and drawing fixed with vertical
800mmx100mmx6mm H type MS plate
post @ 900mm c/c which fixed in middle
Three Ninety-Three
portion 20mm dia GI pipe post in
Thousand Six Thousand Four
between 50mmx25mmx5mm FI bar) with
Building Hundred and Hundred and
35 5.19.08 provision of 20mm GI pipe of minimum sqm 25.457 3670.001 93427.215
Works Seventy point Twenty-Seven
wall thickness 2.1mm-2.2mm passing
Zero Zero point Two One
hole in/c making hole in MS plate and FI
One Five
bars in required diameter. All post fixing
in floor by 100mmx150mm x 6mm MS
base plate with 12mm dia MS royal bolt
i/c cost of fabricating, cutting, welding,
painting 2 coats of synthetic enamel paint
over a coat of anticorrosive priming in/c.
cutting grooves in the R.C.C. or brick
work, mending good the damages with
C.C. (1:2.4) for all floors etc. all complete
as per design and direction of the E-I-C.

Supplying, fitting and fixing door frame


with MS angle (50mmx50mmx6mm),
fixing, 250mm long 6 nos. of iron clamps
of same size (one end bifurcated) with
vertical members of the frame, fixing the
frame in wall with cement concrete
(1:2:4) in Portland Composite cement
CEM II/AM, 42.5N), best quality sand Thirty
(minimum FM1.8) and 20mm down well Nine Hundred Thousand Two
Building graded 1st class brick chips, mending and Fifty-Four Hundred and
36 5.07.03.1 m 31.680 954.001 30222.752
Works good damages, fixing 3 nos. of 100mm point Zero Twenty-Two
size iron hinges with the vertical Zero One point Seven
members of the frame for single leaf Five Two
shutter, painting all iron faces in 2 coats
over a coat of priming with enamel paint
of approved colour and quality, in/c
cutting, sizing, welding for all floors, etc.
all complete as per plan and direction of
the E-I-C MS angle 50mmx50mmx6mm
size

Supplying, fitting and fixing 38mm


finished thick well matured natural
seasoned wooden panel door shutters
(minimum 250mm wide plank), top rail
and styles of sections (150mmx38mm),
lock rail (150mmx38mm) and bottom rail
(150mmx38mm) paneling 38mm thick
Seven
both sides raised, provided with best Ninety-Six
Thousand
quality minimum 6 nos. 100mm Stainless Thousand Two
Four Hundred
Building Steel hinges, 1 nos. best quality 15mm Hundred and
37 5.08.23.01 sqm 12.972 7423.001 and 96291.169
Works dia 300mm long Stainless Steel Hatch Ninety-One
Twenty-Three
bolt, 150mm long 1 No Stainless Steel point One Six
point Zero
socket bolts & 200mm long 1 No tower Nine
Zero One
bolt provide on middle and top, 2nos
heavy type Stainless Steel handle (inside
and out side), hinge cleats, buffer blocks
and finished with sand papering for all
floors etc. all complete as per direction of
the E-I-C. (Single leaf. All sizes of wood
are finished). Mehagoni Wood

Supplying, fitting and fixing combined


steel window shutter, frames and grill
welded together as per drawing & design
having requisite Nos. of vertical and
horizontal standard MS Three Ninety-Two
(19mmx19mmx3mm) ?Z' section for Thousand Thousand
shutter and MS flat bar all around One Hundred Eight Hundred
Building (25mmx4.5mm) and (19mmx3mm),
38 5.08.12.02 sqm 29.373 3162.001 and 92877.455 and
Works 10mm square bar as grill welded Sixty-Two Seventy-Seven
horizontally @ 100mm c/c, only catch point Zero point Four Five
locking handle position gap should Zero One Five
125mm, at inner face of window frame
with F.I. clamp 75mmx3mm duly
embedded with Cement Concrete (1:2:4:)
and mending good the damages in/c all

12 of 13 7/12/20, 10:15 PM
View Form https://www.eprocure.gov.bd/resources/common/ViewBOQForms.jsp?fo...

cost of charges for fabrication and


manufacture by welding, riveting, etc.
supplying all essential fittings like
stopper, handle, 3 nos catch hook
300mm long adjustable iron cleat, 50mm
long pin hinge in/c supplying, fitting, fixing
18 BWG M.S. sheet in position welded to
steel shutter with Tee stiffener (2 nos.)
made with 25mm and 19mm flat bars
fitted to shutter frame in Two equal part
and upper part should be provided with
5mm clear glass, vertically in each
shutter panel and putty and painting the
window with two coats of synthetic
enamel paint over a coat of anticorrosive
priming, , etc for all floors. all complete as
per direction of the E-I-C

Painting to door and window frames,


shutters and any type of MS rod, FI bar,
MS box, MS angle grill, gate etc. in two
coats with synthetic enamel paint of best
quality and approved colour over a coat
Six Thousand
of priming. Applying one vertical and one One Hundred
One Hundred
Building horizontal coat for each coat and and Ninety
39 5.16.10.01 sqm 32.430 190.001 6161.732 and Sixty-One
Works successive coat is to be applied after point Zero
point Seven
drying up of previous coat by brush/roller Zero One
Three Two
/spray in/c cleaning, washing, rubbing, as
necessary and sand papering the surface
and necessary scaffolding, etc. all
complete for all floors i/c cost of all
materials as per direction of the E-I-C.

Providing black board


(3.66mx1.22m/2.44mmx1.22mm or
directed size) made of 12mm thick
cement sand plaster of proportion (1:3) Three Four Thousand
with Portland Composite cement (CEM Hundred and AND
Building
40 5.12.05 II/AM, 42.5N) and best quality sand sqm 13.395 304.001 Four point 4072.093 Seventy-Two
Works
(minimum FM1.2) on walls finished Zero Zero point Zero
smooth with cement grouting mixed with One Nine Three
black oxide board paint over the cement
finishing etc. all complete as per direction
of the E-I-C.

Fancy screen (Ornamental Screen) work


with different size machine made design
blocks with uniform colour and size,
carefully laid in coloured cement sand
mortar (1:3) in all floors in wall with
Portland Composite cement (CEM II/AM,
42.5N) and best quality sand (minimum
Three
FM1.2) with uniform mortar joints, true to Eleven
Thousand
vertical and horizontal line including Thousand
One Hundred
Building racking out joints, cleaning and soaking Three Hundred
41 5.04.14.01.1 sqm 3.600 3148.001 and 11332.804
Works the blocks for minimum 24 hours before and Thirty-Two
Forty-Eight
use including washing and screening of point Eight
point Zero
sand, scaffolding, curing for requisite Zero Four
Zero One
period (minimum 7 days), including
supply of all necessary materials and
other charges etc. all complete as per
direction of the E-I-C. Fancy screen
Block :110mmx110mmx110mm Size
(MCW-CF2, Design No.3 or equivalent
volume & design) Ground floor

Thirty-Two
Lakh
Fifty-Three
Thousand Five
Grand Total: 3253524.539
Hundred and
Twenty-Four
point Five
Three Nine

This Bill of Quantities is Electronically Signed by Ms. Abdul Hakim on behalf of M/s. Abdul Hakim

13 of 13 7/12/20, 10:15 PM

You might also like