LIST OF PRIORITY IMPROVEMENT AREAS
PRIORITIZATION TEMPLATE
IMPROVEMENT
AREAS STRATEGIC URGENCY MAGNITUDE FEASIBILITY AVERAGE INTERPRETATION
PARTICIPATION RATE 5 5 4 3 4.25 Highly Priority
(Performance Indicator)
FAILURE RATE 5 4 4 4 4.25 Highly Priority
( Performance Indicator)
DROPOUT RATE 5 5 3 2 3.75 Moderate Priority
( Performance Indicator)
RETENTION RATE 5 5 3 2 3.75 Moderate Priority
(Performance Indicator)
2|Page67
LIST OF PRIORITY IMPROVEMENT AREAS
PRIORITIZATION TEMPLATE
3|Page67
LIST OF PRIORITY IMPROVEMENT AREAS
PRIORITIZATION TEMPLATE
4|Page67
PLANNING WORKSHEET
(ACCESS)
DEPED PRIORITY
LEARNIN GENERAL SY: 2019- SY: 2020 SY: 2021
INTERMEDIATE IMPROVEMENT ROOT CAUSE
G STAGE OBJECTIVE 20 2021 2022
OUTCOME AREA
Participation
/Enrolment shall - Poverty
IO1. Learners
have been - Distance
are in school and Participation Rate 180 190 200
increased from from school
learning centers
170 to 200
K to 6 IO2. Learners
access programs
Failure Rate
responsive to Failures hall have - -Cannot
3 2 0
their needs and been reduced read and
consistent with from 5 to 0 comprehend
their interests
and aptitudes
5|Page67
PLANNING WORKSHEET
(ACCESS)
DEPED PRIORITY
LEARNING GENERAL SY:2019- SY:2020 SY:2021
INTERMEDIATE IMPROVEMENT ROOT CAUSE
STAGE OBJECTIVE 2020 2021 2022
OUTCOME AREA
101: Learners
are in school and Drop-out shall
in learning Zero have been - Financial
1 1 0
centers Drop-Out Rate decreased from Problem
2 to 0
K to 6
6|Page67
PLANNING WORKSHEET
(QUALITY)
Frustration readers
-Financial problem
from all grade level
--Absenteeism 13 8 5
IO5: Learners attain shall have been
Reading Level
K to 6 learning standards decreased
from 18 to 5
Independent
readers of grade IV
-Poor reading
to VI shall have 54 72 90
habit
been increased
from 35 to 90
7|Page67
PLANNING WORKSHEET
(QUALITY)
ICT Enhancement
of grades IV-VI -Lack of computer
IO5: Learners attain ICT enhancement
shall have been facilities 23 36 49
learning standards increased from 10
to 49
K to 6
8|Page67
PLANNING WORKSHEET
(QUALITY)
K to 6
Learning
performance
outcomes of pupils
106: Learners are Learning -Poor study
during periodical
will rounded performance on habits 75% 80% 85%
exam shall have
happy and smart periodical exam.
been increased
from 70% to 85%
9|Page67
PLANNING WORKSHEET
(QUALITY)
10 | P a g e 6 7
PLANNING WORKSHEET
(GOVERNANCE)
IO3: Growing
number of Fund raising shall
stakeholders actively Brigada Eskwela have been -lack of motivation
120k 160k 200k
participate and increased from 80k
collaborate in to 200k
convergence
K to 6
IO2. Learners
Standard electrical
access programs
wirings for safety
responsive to their Replace Standard -Lack of budget –
purpose shall have 40% 60% 80%
needs and Electrical wiring
been replace from
consistent with their
20% to 80%
interests and
aptitudes
11 | P a g e 6 7
PLANNING WORKSHEET
(GOVERNANCE)
IO2. Learners
access programs implementation of
responsive to their Stage, Canteen stage, canteen and
needs and and Feeding feeding center shall -lack of budget
43% 56% 70%
consistent with their Center repair have been repaired
interests and from 30% to 70%
aptitudes
K to 6
IO1: Education
leaders and
managers practice School –Based
participative and Conduct School – Training shall have -Lack of budget –
3 4 5
inclusive Based Training been increased
management from 2 to 5
processes
12 | P a g e 6 7
PLANNING WORKSHEET
(GOVERNANCE)
13 | P a g e 6 7
PLANNING WORKSHEET
(GOVERNANCE)
K to 6
IO2: Internal
systems and
Heroes park shall
processes needed Installation of - No budget
have been installed 40% 60% 80%
for continuous Heroes park
from 20% to 80%
improvement in
place
14 | P a g e 6 7
PLANNING WORKSHEET
(GOVERNANCE)
ADDENDUM
DEPED PRIORITY SY: SY: SY:
LEARNING GENERAL
INTERMEDIATE IMPROVEMENT ROOT CAUSE 2019- 2020- 2021-
STAGE OBJECTIVE
OUTCOME AREA 2020 2021 2022
K to 6
IO2: Internal
systems and Learning materials
Provision of
processes needed shall have been -Modular class
additional learning 0 75% 100%
for continuous increased from
materials
improvement in 50% to 100%
place
15 | P a g e 6 7
Project Work Plan and Budget Matrix (ACCESS)
2021
Project Title: “PARTICIPATION RATE AY ITAAS PARA MAABOT AND EDUKASYON SA LAHAT”
Problem Statement: The school has 187 total enrolment compared from the previous enrolment of 170.
Project Objective Statement: Participation / Enrolment shall have been increased from 180 to 190
Root Cause: Poverty and distance from school
Date of
Activity Output Person Responsible Budget Budget Source
Implementation
Nancy R. Barton
Conduct Oplan Baling
Performance Indicator June 2020 P 4,085 MOOE
Myshyl R. Serina
SF4, SF2
-Conduct Home Visitation Mary Evelyn P. Perez
Tarpaulin
16 | P a g e 6 7
Project Work Plan and Budget Matrix (ACCESS)
2021
Date of
Activity Output Person Responsible Budget Budget Source
Implementation
Nancy R. Barton
Conduct remedial reading Myshyl R. Serina
Reproduction of reading
June 2020 Mary Evelyn P. Perez P13,110 MOOE
materials
Follow-up of Parents All teachers
17 | P a g e 6 7
Project Work Plan and Budget Matrix (ACCESS)
2021
Date of
Activity Output Person Responsible Budget Budget Source
Implementation
Nancy R. Barton
Conduct home visitations Happy Gay S. Sumagayan
Provision of school
August 2020 Jenelyn S. Sardido P5,150 MOOE
supplies/ activity sheets
Follow-up of Parents
18 | P a g e 6 7
Project Work Plan and Budget Matrix (ACCESS)
2021
Project Title: “ITAAS ANG RETENTION SA MAG-AARAL PARA LAHAT AY MAGSIPAGTAPOS SA PAARALAN”
Problem Statement: Some pupils were transfer of residence due unstable job and others are child labor.
Project Objective Statement: Retention Rate shall have been increased from 96% to 98%.
Root Cause: Poverty
Date of
Activity Output Person Responsible Budget Budget Source
Implementation
19 | P a g e 6 7
Project Work Plan and Budget Matrix (QUALITY)
2021
Date of
Activity Output Person Responsible Budget Budget Source
Implementation
Nancy R. Barton
20 | P a g e 6 7
Project Work Plan and Budget Matrix (QUALITY)
2021
Date of Person
Activity Output Budget Budget Source
Implementation Responsible
21 | P a g e 6 7
Project Work Plan and Budget Matrix (QUALITY)
2021
Date of
Activity Output Person Responsible Budget Budget Source
Implementation
Nancy R. Barton
-Purchase of fuel refill, -SF4, SF2
P 11,380. MOOE
kitchen utensils and other -PR /PO /RFQ October 2020 Gloria P. Layaguin
materials for the
competition in EPP - List of Materials Darley Hannah Maris D.
Laurejas
22 | P a g e 6 7
Project Work Plan and Budget Matrix (QUALITY)
2021
Date of
Activity Output Person Responsible Budget Budget Source
Implementation
23 | P a g e 6 7
Project Work Plan and Budget Matrix (QUALITY)
2021
Nancy R. Barton
- List of pupils w/ learning
-Conduct learning remedial
remedial
October 2020 Gloria P. Layaguin P 15,000. MOOE
-Provision of activity
- -PR /PO /RFQ
sheets per pupil December 2020 All teachers
-MPS Test result
quarterly February 2021
-Conduct quarterly exam. April 2021
24 | P a g e 6 7
Project Work Plan and Budget Matrix (QUALITY)
2021
Date of
Activity Output Person Responsible Budget Budget Source
Implementation
Nancy R. Barton
-Conduct training of the
- List of pupils with
different academic Gloria P. Layaguin
potentials in academic
competitions by grade October 2020 P 5,690 MOOE
competitions by grade
level on the selected All teachers
level December 2020
learners
25 | P a g e 6 7
Project Work Plan and Budget Matrix (QUALITY)
2021
26 | P a g e 6 7
Project Work Plan and Budget Matrix (GOVERNANCE)
2021
-Organize School BE
- BE 1-7
committee with their Nancy R. Barton
functions -Tarpaulin
Jenelyn A. Sardido P 6,875 MOOE
- Solicitation Letter MAY 2021
-Solicit funds and materials Mary Evelyn P. Perez
use during brigade
Eskwela
27 | P a g e 6 7
Project Work Plan and Budget Matrix (GOVERNANCE)
2021
28 | P a g e 6 7
Project Work Plan and Budget Matrix (GOVERNANCE)
2021
Project Title: “IMPROVEMENT OF STAGE, CANTEEN & FEEDING CENTER, THAT.S GREAT”
Problem Statement: School stage, canteen & feeding center needs minor repair.
Project Objective Statement: Repairable stage, canteen & feeding center shall have been implemented from 40 % to 56%
Root Cause: Lack of budget
Date of
Activity Output Person Responsible Budget Budget Source
Implementation
Nancy R. Barton
-Purchase of construction
-PR /PO /RFQ Gloria P. Layaguin P 14,385 MOOE
materials for minor repair November 2020
Mary Evelyn P. Perez
-Availability of funds
29 | P a g e 6 7
Project Work Plan and Budget Matrix (GOVERNANCE)
2021
Training and LAC sessions Attendance and pictures October 2020 Teochie P. Babanto
P 11,000 MOOE
For pupils and teachers -Availability of funds December 2020
Mary Evelyn P. Perez
30 | P a g e 6 7
Project Work Plan and Budget Matrix (GOVERNANCE)
2021
31 | P a g e 6 7
Project Work Plan and Budget Matrix (GOVERNANCE)
2021
32 | P a g e 6 7
Project Work Plan and Budget Matrix (GOVERNANCE)
2021
Nancy R. Barton
-Provision of of supplies to
support the yearly activity - -Availability of funds Gloria P. Layaguin
P 5,000 MOOE
on lagobo and kahayag November 2020
festival of Carmen Mary Evelyn P. Perez
-PR/PO/RFQ /Liquidation
33 | P a g e 6 7
Project Work Plan and Budget Matrix (GOVERNANCE)
2021
Nancy R. Barton
34 | P a g e 6 7
Project Work Plan and Budget Matrix (GOVERNANCE)
2021
ADDENDUM
Project Title: ”ALAGAAN ANG SARILI, COVID 19 IWASAN PALAGI ”
Problem Statement: Due to Covid 19 pandemic, self protection is the best preparation.
Project Objective Statement: School readiness for self-protection shall have been implemented from 50% to 75%.
Root Cause: Protection from Covid 19
Date of
Activity Output Person Responsible Budget Budget Source
Implementation
Nancy R. Barton
June 2020
-Provision of COVID 19 - -Availability of funds Gloria P. Layaguin
P 18,000 MOOE
supplies and materials
September 2020 Mary Evelyn P. Perez
-PR/PO/RFQ /Liquidation
35 | P a g e 6 7
Project Work Plan and Budget Matrix (GOVERNANCE)
2021
ADDENDUM
Project Title: ”MODULAR DELIVERY SA NEW NORMAL DAPAT PAGHANDAAN ”
Problem Statement: Due to Covid 19 pandemic, learning modules / activity sheets is not available.
Project Objective Statement: School readiness in modular delivery shall have been implemented from 50% to 75%.
Root Cause: Modular class
Date of
Activity Output Person Responsible Budget Budget Source
Implementation
Nancy R. Barton
-Activity Design June 2020
-Provision and Gloria P. Layaguin
reproduction of learning P 30,000 MOOE
materials for modular Mary Evelyn P. Perez
- -Availability of funds September 2020
-PR/PO/RFQ /Liquidation
Participation /
“’PARTICIPATIO Enrolment shall -Performance Conduct Nancy R. Barton
N RATE AY have been Indicator Oplan Baling June 2020 P 4,085 MOOE
ITAAS PARA increased from -SF4, SF2 Myshyl R. Serina
MAABOT AND 180 to 190 -Tarpaulin -Conduct
EDUKASYON SA Home Mary Evelyn P.
LAHAT” Visitation Perez
37 | P a g e 6 7
ANNUAL IMPLEMENTATION PLAN
(ACCESS) 2021
SCHOOL SCHEDULE
PROJECT OUTPUT FOR THE PERSONS BUDGET/A BUDGET
IMPROVEMENT ACTIVITIES /
OBJECTIVE YEAR RESPONSIBLE CTIVITY SOURCE
PROJECT TITLE VENUE
Nancy R. Barton
Drop-out Rate Conduct home August P5,150
“DROP-OUT Provision / reproduction
shall have been of school supplies/ visitations Happy Gay S. 2020
RATE DAPAT MOOE
decreased from activity sheets Sumagayan
MAIWASAN,
1 to 0. Follow-up of
HOME Parents Jenelyn S.
VISITATION
Sardido
KAILANGAN”
38 | P a g e 6 7
ANNUAL IMPLEMENTATION PLAN
(QUALITY) 2021
39 | P a g e 6 7
ANNUAL IMPLEMENTATION PLAN
(QUALITY) 2021
-ICT hands-on of
grade
Nancy R. Barton
IV-VI learners
: ICT enhancement -List of ICT
schedule Mary Evelyn P.
“COMPUTER of grade IV-VI -Procure of
Perez September
LITERATE AY learners shall have computer CPU, P4,865 MOOE
And labor of the 2020
NAKAKAAKIT” been increased Darley Hannah
from 23 to 36 -PR/ RFQ computer repair
Maris D.
-Activity Laurejas
-Conduct School-
Design / based Training in
Attendance ICT of teachers
enhancement
40 | P a g e 6 7
ANNUAL IMPLEMENTATION PLAN
(QUALITY) 2021
41 | P a g e 6 7
ANNUAL IMPLEMENTATION PLAN
(QUALITY) 2021
42 | P a g e 6 7
ANNUAL IMPLEMENTATION PLAN
(QUALITY) 2021
October 2020
Learning
performance December
outcomes of - List of pupils 2020
-Conduct learning Nancy R. Barton
pupils during w/ learning remedial
“LEARNING every periodical remedial P 15,000.
Gloria P.
“PERFORMANCE exam result -Provision of activity Layaguin February
shall have been - -PR /PO sheets per pupil 2021 MOOE
IS THE KEY TO
increased from /RFQ All teachers
SUCCESS”
75% TO 80% -MPS Test
result quarterly -Conduct quarterly exam April 2021
43 | P a g e 6 7
ANNUAL IMPLEMENTATION PLAN
(QUALITY) 2021
44 | P a g e 6 7
ANNUAL IMPLEMENTATION PLAN
(QUALITY) 2021
45 | P a g e 6 7
ANNUAL IMPLEMENTATION PLAN
(GOVERNANCE) 2021
Purchase of standard
Standard Nancy R. Barton
Electrical wirings
electrical -
“: “STANDARD Gloria P.
wirings for -PR /PO /RFQ P 10,500 MOOE
ELECTRICAL Layaguin September
safety purpose -Re=wirings using
WIRINGS AY NO. 2020
shall have been standards wirings in 3 Mary Evelyn P.
1”
replaced from -Liquidation classrooms Perez
40% to 60%
47 | P a g e 6 7
ANNUAL IMPLEMENTATION PLAN
(GOVERNANCE) 2021
Repairable
““IMPROVEMENT stage, canteen Nancy R. Barton
OF STAGE, & feeding -PR /PO /RFQ -Purchase of Gloria P.
CANTEEN & center shall November
construction materials for Layaguin MOOE
FEEDING have been 2020 P 14,385
minor repair
CENTER, implemented -Availability of Mary Evelyn P.
THAT.S GREAT” from 40 % to funds Perez
56%
48 | P a g e 6 7
ANNUAL IMPLEMENTATION PLAN
(GOVERNANCE) 2021
September
- Conduct School- Nancy R. Barton 2020
““TEACHERS
School- based -Activity Based
TRAINING AND
trainings and Design / Teochie P. October 2020
SLAC SESSION Training and LAC Babanto P 11,000 MOOE
SLAC session
PA MORE” Attendance sessions December
shall have been
and pictures Mary Evelyn P. 2020
increased from For pupils and teachers
3 to 4 Perez
-Availability of
funds
49 | P a g e 6 7
(GOVERNANCE) 2021
Nancy R. Barton
Installation of September
water supply - -Availability -Installations of water 2020 MOOE
Teochie P.
““: “HEALTH IS shall have been of funds supply in all classroom Babanto October 2020
WEALTH” increased on CR’s, hand washing and
-
health practices tooth brushing lavatories Mary Evelyn P. December P 31.000
PR/PO/RFQ
from 38% to Perez 2020
/Liquidation
61%.
50 | P a g e 6 7
ANNUAL IMPLEMENTATION PLAN
(GOVERNANCE) 2021
school
”SCHOOL -Provision of paints Nancy R. Barton
beautification September
BEAUTIFICATIO - -Availability for classroom walls,
and gulayan sa 2020
N AND of funds buildings, tires and Teochie P.
paaraln Babanto MOOE
GULAYAN SA landscaping December
program shall
PAARALAN ARE 2020 P 10.000
have been Mary Evelyn P.
WONDERFUL” implemented - Perez February
PR/PO/RFQ -Purchase of gardening
from 63% to 2021
/Liquidation tools
70%.
51 | P a g e 6 7
ANNUAL IMPLEMENTATION PLAN
(GOVERNANCE) 2021
Nancy R. Barton
” ”KAHAYAG AT Support
LAGOBO kahayag and - -Availability
-Provision of supplies to Gloria P.
FESTIVAL NG lagobo festival of funds Layaguin
support the yearly activity MOOE
CARMEN AY shall have been P 5,000
on lagobo and kahayag November
LAGING implemented Mary Evelyn P.
festival of Carmen 2020
SUPORTAHAN ” from 87% to - Perez
94%. PR/PO/RFQ
/Liquidation
52 | P a g e 6 7
ANNUAL IMPLEMENTATION PLAN
(GOVERNANCE) 2021
Nancy R. Barton
53 | P a g e 6 7
ANNUAL IMPLEMENTATION PLAN
(GOVERNANCE) 2021
ADDENDUM
54 | P a g e 6 7
ANNUAL IMPLEMENTATION PLAN
(GOVERNANCE) 2021
ADDENDUM
55 | P a g e 6 7
PROJECT MONITORING REPORT FORM
(ACCESS) 2021
“’PARTICIPATION Participation /
RATE AY ITAAS Enrolment shall March, 30,
PARA MAABOT have been 2021
AND increased from 180
EDUKASYON SA to 190
LAHAT”
“FAILURE RATE
Failure Rate shall
AY BAWASAN March,30,
have been reduced
PARA SA 2021
from 3 to 2.
MAGANDANG
KINABUKASAN”
56 | P a g e 6 7
PROJECT MONITORING REPORT FORM
(ACCESS) 2021
57 | P a g e 6 7
PROJECT MONITORING REPORT FORM
(QUALITY) 2021
Independent
readers increased
from 54 to 72
58 | P a g e 6 7
PROJECT MONITORING REPORT FORM
(QUALITY) 2021
“LUTONG
MASARAP, Participation EPP
KATAPAT ANG upgrading and
KUMPLETONG cooking skill February 15,
SANGKAP” activities shall have 2021
been increased
from 45 to 60
59 | P a g e 6 7
PROJECT MONITORING REPORT FORM
(QUALITY) 2021
Learning
performance
“LEARNING outcomes of pupils March,25,
“PERFORMANCE during every 2021
IS THE KEY TO periodical exam
SUCCESS” result shall have
been increased
from 75% to 80%
60 | P a g e 6 7
PROJECT MONITORING REPORT FORM
(QUALITY) 2021
“TALENTO NG Participation in
MGA KABATAN Academic festival
PINAKIKITA SA of selected January 15,
ACADEMIC learners shall have 2021
FESTIVAL” been increased
from 8 to 11
61 | P a g e 6 7
PROJECT MONITORING REPORT FORM
(GOVERNANCE) 2021
Standard electrical
: “STANDARD
wirings for safety
ELECTRICAL
purpose shall have
WIRINGS AY NO. January 15,
been replaced from
1” 2021
40% to 60%
62 | P a g e 6 7
PROJECT MONITORING REPORT FORM
(GOVERNANCE) 2021
School- based
““TEACHERS
trainings and SLAC
TRAINING AND
session shall have March 15,
SLAC SESSION
been increased 2021
PA MORE”
from 3 to 4
63 | P a g e 6 7
PROJECT MONITORING REPORT FORM
(GOVERNANCE) 2021
”SCHOOL school
BEAUTIFICATION beautification and
AND GULAYAN gulayan sa paaraln March 15,
SA PAARALAN program shall have 2021
ARE been implemented
WONDERFUL” from 63% to 70%.
64 | P a g e 6 7
PROJECT MONITORING REPORT FORM
(GOVERNANCE) 2021
:
School Heroes
”OUR IDOLS, THE March 15,
Park shall have
PHILIPPINE 2021
been installed from
HEROES ”
30% to 60%.
65 | P a g e 6 7
PROJECT MONITORING REPORT FORM
(GOVERNANCE) 2021
ADDENDUM
(1) (2) (3) (4) (5) (6) (7)
Name of Project Project Date of Accomplishment Issues/ Recommendations Signature of
Objectives Monitoring s/ Status to Date Problems/ / Action Points SPT & Project
Challenges Team Leader
:
School readiness
”ALAGAAN ANG
for self-protection
SARILI, COVID 19
shall have been January 15,
IWASAN PALAGI
implemented from 2021
”
50% to 75%.
: School readiness
in modular delivery
” MODULAR March 15,
shall have been
DELIVERY SA 2021
implemented from
NEW NORMAL
50% to 75%.
DAPAT
PAGHANDAAN ”
66 | P a g e 6 7
PROJECT MONITORING REPORT FORM
(QUALITY)
Mid-year: ________________
Year-End: _______________
To decrease number
“PERIMETER of pupils who kept on May 2019
FENCE IS cutting classes from March, 2020
FOREVER” 20% to 0%.
67 | P a g e 6 7