PROVIDING AND LAYING SEWERAGE NETWORK INCLUDING

HOUSE SERVICE CONNECTION AND CONSTRUCTION OF


PROJECT SEWAGE OF SEWAGE PUMPING STATION IN ZONE 5,6 AND 7
OF TIRUPPUR CITY MUNICIPAL CORPORATION - PACKAGE - 1

DOCUMENT EPE/UGSS-TPR/MPS/Z-V/STR/PP PREP., CHEK., APPROV., REV


NO ROOM/002 VJ VJ MGK 0
TITLE STRUCTURAL DESIGN CALCULATION OF PUMP ROOM

S1 Length - 4.385m x Breath - 2.885m

Grade of Concrete = M25


Grade of Steel Fe500
Cover to Main reinforcement = 25mm
Sizes of the panel L1 = 4.385 m
L2 = 2.885 m
Sizes of the panel L1 = 4.48 m
L2 = 2.98 m
Ratio ly/lx = 1.50
Thickness of the slab = 125 mm
Thickness of the slab = 125 mm

Floor finish = 2.40 KN/m2


Live Load = 0.75 KN/m2
Total Load = 6.28 KN/m2

Boundary condition Two Adjacent Edges discontinuous

Shorter direction
Moment coefficients
Positive = 0.056
Negative = 0.075
Moment Values
Positive = 3.13
Negative = 4.186
% of Reinforcement (pt)
Positive = 0.111
Negative = 0.150
Area of Reinforcement (Ast)
Positive = 105.7
Negative = 142.9
Design Results along short span
Detailing for Bar dia (mm) Spacing req(mm) Spacing pro(mm)
Positive Steel 10 285 c/c 150 c/c
Negative Steel 10 285 c/c 150 c/c

Longer direction
Moment coefficients
Positive = 0.035
Negative = 0.047
Moment Values
PROVIDING AND LAYING SEWERAGE NETWORK INCLUDING
HOUSE SERVICE CONNECTION AND CONSTRUCTION OF
PROJECT SEWAGE OF SEWAGE PUMPING STATION IN ZONE 5,6 AND 7
OF TIRUPPUR CITY MUNICIPAL CORPORATION - PACKAGE - 1

DOCUMENT EPE/UGSS-TPR/MPS/Z-V/STR/PP PREP., CHEK., APPROV., REV


NO ROOM/002 VJ VJ MGK 0
TITLE STRUCTURAL DESIGN CALCULATION OF PUMP ROOM
Positive = 1.950
Negative = 2.619
% of Reinforcement (pt)
Positive = 0.086
Negative = 0.117
Area of Reinforcement (Ast)
Positive = 73.3
Negative = 110.8

Design Results along long span


Detailing for Bar dia (mm) Spacing req (mm)Spacing pro (mm)
Positive Steel 10 285 c/c 150 c/c
Negative Steel 10 285 c/c 150 c/c

Maximum allowable spacing = 285 mm


Distribution Reinforcement = Y10 at 200 c/c (Minimum steel)

Check for Deflection

Ast provided = 10 @ 150 c/c


Ultimate Moment M = 4.69 KNm
Effective depth d = 95 mm
Mu/bd2 = 0.5195

Modification factor = 0.55+(477-fs)/(120*(0.9+M/bd2)) <=2


fs = (2*fy*As req)/(3* As prov)
= 3.02
Allowable Deflection = 2*26 = 52 mm
Actual Deflection L/d = 31.368 mm SAFE
< 52

Check for Shear


Shear Vu = 21.084 kN
Tau v= Vu/bd = 0.22 N/mm^2
pt provided = 0.5509
Tau c = 0.51 N/mm^2
Enhanced Shear Strength = 1.02 N/mm^2
> 0.22 N/mm^2 SAFE
SLAB RESULT:

Provided slab thickness 125 mm

Bottom Reinforcement (Span)


PROVIDING AND LAYING SEWERAGE NETWORK INCLUDING
HOUSE SERVICE CONNECTION AND CONSTRUCTION OF
PROJECT SEWAGE OF SEWAGE PUMPING STATION IN ZONE 5,6 AND 7
OF TIRUPPUR CITY MUNICIPAL CORPORATION - PACKAGE - 1

DOCUMENT EPE/UGSS-TPR/MPS/Z-V/STR/PP PREP., CHEK., APPROV., REV


NO ROOM/002 VJ VJ MGK 0
TITLE STRUCTURAL DESIGN CALCULATION OF PUMP ROOM
Provide 10 mm dia reinforcement at 150 mm c/c along shorter direction as a main reinforcement
Provide 10 mm dia reinforcement at 150 mm c/c along longer direction as a main reinforcement

Top Reinforcement (Support)


Provide 10 mm dia reinforcement at 150 mm c/c along shorter direction as a main reinforcement
Provide 10 mm dia reinforcement at 150 mm c/c along longer direction as a main reinforcement