You are on page 1of 2

Directorate of Erbil Borehole log

Construction Laboratory Based on ASTM D1587-00 & D6032-02

.Test Form No S - 12 Revision 05 Approve date 04.04.2019

Field Data
Project Name Con or rozh tawer
Erbil BH No. A7 Lab No.
Drilling Method Wash drilling Groundwater level N.W.T Starting Date 30-8-2021
Machine Name scania Level & Coordinate Sending Date 30-8-2021

Climat
e&
Sample Lab Material Description CR RQD No. of Blows
S Depth (m) (%) (%) Field
Type No. (30 cm)
Remar
ks
1 0.0 2.5 D 2567 Br. Silt clay with gravel
Br. Silt clay with gravel 50″
2 2.5 3.0 SS 2568 40 5

2569 Br. Silt clay with gravel


3 3.0 5.5 D
2570 Br. Silt clay with gravel 50″
4 5.5 6.0 SS 43 5

2571 Br. Silt clay with gravel


5 6.0 9.0 D
2572 Br. Silt clay with gravel 50″
6 9.0 9.5 SS 43 5

2573 Br. Silt clay with gravel


7 9.5 12.5 D
2574 Br. Silt clay with gravel 50″
8 12.5 13.0 SS 45 4

2575 Br. Silt clay with gravel


9 13.0 16.0 D
2576 Br. Silt clay white spot 50″
10 16.0 16.5 SS 45 5

2577 Br. Silt clay with gravel


11 16.5 19.0 D
12 19.0 19.5 SS 2578 Br. Silt clay with gravel 50″5
2579 Br. Silt clay with gravel
13 19.5 22.0 D
2580 Br. Silt clay with gravel
14 22.0 22.5 SS 50″5
2581 Br. Silt clay with gravel
15 22.5 24.5 D
2582 Br. Silt clay with gravel
16 24.5 25.0 SS 50″5
2583 Br. Silt clay with gravel
17 25.0 29.5 D
18 29.5 30.0 SS 2584 Br. Silt clay with gravel 50″5
2585 Br. Silt clay with gravel
19 30.0 36.0 D
20 36.0 36.5 SS 2586 Br. Silt clay with gravel 50″5

Remarks:
1-1
Tested by: Checked by: Approved by:
(Title/Name/Date/Signature)
Directorate of Erbil Borehole log
Construction Laboratory Based on ASTM D1587-00 & D6032-02

.Test Form No S - 12 Revision 05 Approve date 04.04.2019

Tested by: Checked by: Approved by:


(Title/Name/Date/Signature)

You might also like