Professional Documents
Culture Documents
5 kN/m² 0 kN/m²
W.T.
G.L. G.L.
W.T. W.T.
2] In the tank
Force due to Soil Force due to Water
F4 = 0.5 x 0.0 x Hs2 F5 = 0.5 x 0.0
= 0.5 x 0.0 x #REF! = 0.5 x 0.0
F4 = #REF! kN F5 = 0 kN
gw Hw2 Ka G Hs2 Ka g Hs1
30 0
Left Right
b b
a g a g
b G b G
Ka SL2
0
LEFT SIDE
Submerged Soil
Only Soil (KagsHs1) Water (gwHw1) Dry Soil (KagsHds)
(KagsatHw1)
Ht Value Ht Value Ht Value Ht Value
0 0 0 0 0 0 0 0
0.53 4.8 0.2 2 0.2 1.8 0.67 6
1.07 9.6 0.4 4 0.4 3.6 1.33 12
1.6 14.4 0.6 6 0.6 5.4 2 18
2.13 19.2 0.8 8 0.8 7.2 2 18
2.67 24 1 10 1 9 2 18
3.2 28.8 1.2 12 1.2 10.8 2 18
RIGHT SIDE
Submerged Soil
Only Soil (KagsHs2) Water (gwHw1) Dry Soil (KagsHds)
(KagsatHw1)
Ht Value Ht Value Ht Value Ht Value
0 0 0 0 0 0 0 0
0 0 0.5 5 0.5 4.5 -1
0 0 1 10 1 9 -2
0 0 1.5 15 1.5 13.5 -3
0 0 2 20 2 18 -3
0 0 2.5 25 2.5 22.5 -3
0 0 3 30 3 27 -3
5 kN/m² 0 kN/m²
W.T.
G.L. G.L.
W.T.
PRESSURES:
LEFT RIGHT
Soil = 28.8 kN/m² Soil = 0 kN/m²
Water = 0 kN/m² Water = 30 kN/m²
Submerged = 0 kN/m² Submerged = 0 kN/m²
Dry = 0 kN/m² Dry = 0 kN/m²
Surcharge = 2.5 kN/m² Surcharge = 0 kN/m²
FORCES:
LEFT SIDE
WITH ONLY SOIL WITH WATER TABLE
Submerged Soil
Only Soil (KagsHs1) Water (gwHw1) Dry Soil (KagsHds)
(KagsatHw1)
Ht Value Ht Value Ht Value Ht Value
0 0 0 0 0 0 0
0.53 4.8 0 0 0 0 1.07 9.6
1.07 9.6 0 0 0 0 2.13 19.2
1.6 14.4 0 0 0 0 3.2 28.8
2.13 19.2 0 0 0 0 3.2 28.8
2.67 24 0 0 0 0 3.2 28.8
3.2 28.8 0 0 0 0 3.2 28.8
RIGHT SIDE
E SURCHARGE WITH ONLY SOIL WITH WATER TABLE SURCHARGE
Surcharge load Submerged Soil Surcharge load
Dry Soil (KagsHds) Only Soil (KagsHs1) Water (gwHw1) Dry Soil (KagsHds)
(load x Ka) (KagsatHw1) (load x Ka)
Value Ht Value Ht Value Ht Value Ht Value Ht Value Ht
0 2.5 0 0 0 0 0 0 0 0
0.53 2.5 0 0 0.5 5 0.5 2 -1 -9 0
1.07 2.5 0 0 1 10 1 4 -2 -18 0
1.6 2.5 0 0 1.5 15 1.5 6 -3 -27 0
2.13 2.5 0 0 2 20 2 8 -3 -27 0
2.67 2.5 0 0 2.5 25 2.5 10 -3 -27 0
3.2 2.5 0 0 3 30 3 12 -3 -27 0
SURCHARGE BOTTOM
Surcharge load Water (gwHw1)
(load x Ka)
Value Ht Value
0 0 0
0 0.53 5.33
0 1.07 10.7
0 1.6 16
0 2.13 21.3
0 2.67 26.7
0 3.2 32
DESIGN OF RECTANGULAR WATER TANK
5 kN/m²
Hs1
3.2 m H Hw
3.6 m 3 m
Pressure Diagram
S L x Ka gw x Hw
2.5 30
Ka x g x Hs1
28.8
Fsur
Fs
Fw
Ms = 62.0 x 1.5
Ms = 92.9 kN.m
Mw = 45.0 x 1.5
Mw = 67.5 kN.m
REINFORCEMENT DETAILS
b = 1000 mm
Mu = 0.13 x fck x b x d² cover = 30 mm
d = Mu Φ = 16 mm
0.13 x fck x b
d = 92928000
0.13 x 30 x 1000
d = 152.61 mm
D = d + cover + Φ/2
D = 153 + 30 + 8
D = 191 mm
D ≈ 200 mm
d = 162 mm
pt = 50 1 - 1 - 4.6 Mu
fck b d²
fy / fck
pt = 50 1 - 1 - 4.6 92928000
30 1000 162 ²
500 / 30
pt = 0.97 %
Ast = pt x b x d
100
Ast = 0.97 x 1000 x 162
100
Ast = 1574.34 mm²
Provide
Φ = 16 mm
ast = 201 mm² provide 16 Φ @ 125 mm c/c
spacing = 128 mm
(ii) At Water Side:
pt = 50 1 - 1 - 4.6 Mu
fck b d²
fy / fck
pt = 50 1 - 1 - 4.6 67500000
30 1000 162 ²
500 / 30
pt = 0.67 %
Ast = pt x b x d
100
Ast = 0.67 x 1000 x 162
100
Ast = 1077.86 mm²
Provide
Φ = 12 mm
ast = 113 mm² provide 12 Φ @ 90 mm c/c
spacing = 105 mm Astprov = 1256.64 mm²
CRACKWIDTH CALCULATION
σcbc = 10 N/mm²
Water Side: m = 280 = 9.33
3σcbc
z = d - x
3
z = 164 - 17.1
z = 147 mm
fs = Mw fc = 2 x Mw
z x As z b x
fs = 45000000 fc = 90000000
147 x 1257 147 x 1000 x 51.4
fs = 243.82 N/mm² fc = 11.92 N/mm²
fs < 0.6fy = 300 N/mm² fc < 0.4fck = 12 N/mm²
fs < 0.6fy i.e. O.K. fc < 0.4fck i.e. O.K.
11.92
51.39
Stress at extreme point
σ = 244
(D-x) 113
243.8 112.6 σ = 321.8 N/mm²
90
acr = 57.6 - 6
acr = 51.6 mm
57.6 36 Cmin = 30 mm
Crackwidth
w = 3 x acr x εm
1 + 2 acr - cmin
h - x
w = 3 x 51.6 x ###
1 + 2 51.6 - 30
200 - 51.39
Don’t Delete
Φ = 0.61