You are on page 1of 1
MAGNETIC PARTICLE INSPECTION REPORT No. 13 CLIENT CONTRACTOR LOCATION _| ‘AGOCO ROST AA GL | Feenost, SHEET 1 OF 1 rrr Engineering SARIR OILFIELD i Constr Dept. | £CD462/2015 Taknia | constuction Dep essa REQUEST No. 1-22 (E.C.D) MATERIAL WELD PROCESS EQUIPMENT CONTACT SPACING Carbon Stee! GTAW Permanent Magnet 4~6cm. SIZE THICKNESS TYPE CONTRAST PAINT 10 3.38mm, Magnaflux wep-2 Magnaflux SCHEDULE PREPARATION SURFACE COND’N. MAGNETIC INK Sch.40 Fillet Weld/Socket ‘As welded 7HE Magnaflux LINE IDENTIFICATION ‘AREA 1"NG-40021.3-A1 G3 DRAWING Ne. "ACCEPTANCE STD. WELD CLASS N/A ANSI B31.3 10% SPOOL / ITEM Ne. OPERATOR DATE NA IV,RLEAE 30 MAY 2020 WELD wir | WELD went, (DIA: |scH. | MAPR | Roee | TvPE INTERPRETATION RESULT swo7 | 1” | 40 | For | 100% | PIPE NSD swiie| 1” | 40 | Foi | 100% | ELBow NSD swazo| 1” | 40 | For | 100% | evpow | NSD sswizi| 4” | 40 | Fo1__| 100% |_ PIPE NSD swi2s| | 40 | For | 100% | PIPE NSD + = —— > a a =] COMMENT / SKE TCH: TAKERS COMPANY f. AGOCO l AGOCO -Sarir [NAME ‘Yeseph Villanueva, SALE ELIA ROK DESIGNATION IE E.C.D Dept. Coordinator SIGNATURE i DATE 7 *TMAV2020 LEGEND: NSD NOSIGNIFICANT DEFECT PG-POROSITY LF LACK OF FUSION A-accer NIRSD- No RE JECTABLE SIGNIFICANT DEFECT GK ~ CRACK. SUC- UNDERCUT REPAIR

You might also like