You are on page 1of 1
MAGNETIC PARTICLE INSPECTION | = & REPORT No. 41 - an | CLIENT CONTRACTOR LOCATION Bill me SHEET 1 oF 1 aa Engineering FERROSTAAL | saRiR OILFIELD 7 i Construction Dept. | £CD462/2010 ~ Taknia ‘ons in Dept a ce REQUEST Ne. 1-22 (E.C.D) MATERIAL WELD PROCESS EQUIPMENT CONTACT SPACING Carbon Steel GTAW Permanent Magnet 4~6 0m. SIZE THICKNESS TYPE ‘CONTRAST PAINT fy 5.70mm Magnaflux WCP-2 Magnaflux ‘SCHEDULE PREPARATION ‘SURFACE COND'N. MAGNETIC INK Sch.C13000 Fillet Weld As welded ZHE Magnaflux LINE IDENTIFICATION ‘AREA 4-NG40008-A1 GC-2 DRAWING Ne. “ACCEPTANCE STD. WELD CLASS: 2385-NM-1350-102 ANS! 831.3 10% SPOOL / ITEM No. ‘OPERATOR DATE N/A JV,RE AE 22 JULY 2020 WELD wor | WELD toe, | DIA: | SCH. rata Ianen TYPE INTERPRETATION RESULT sw3 | 1” | cisooo| 10 | 100% | socKOLeT NSD A « —— *NOTHING FOLLOWS* = | COMMENT / SKETCH : COMPANY ‘AGOCO ‘AGOCO -Sarir NAME Rey Eduarda. ‘Abdul Hamed S, | DESIGNATION DT Inspector EC.D Dept;Goordinator SIGNATURE Eaiiud Foe athe DATE 72 JULY 2020 Va? sty 2020 LEGEN NSD NOSIGNIFICANT DEFECT PG-POROSTY LF LACK OF FUSION A-ACCEPTED [NIRSDD- NO REJECTABLE SIGNIFICANT DEFECT CK ~CRACK Sbe- UNDERCUT REPAIR

You might also like