You are on page 1of 1
MAGNETIC PARTICLE INSPECTION REPORT No, 43 CLIENT CONTRACTOR LOCATION _ a AGoco SHEET 1 OF 1 mmm | Engineering FERROSTAAL | Sapir OILFIELD + i Construction Di 0462/2011 Taknia | Construction Dept. | £¢D462/2010 Gc-2 mequestne, 322 (C0) MATERIAL WELD PROCESS EQUIPMENT CONTACT SPACING Carbon Steel GTAW Permanent Magnet 4~6 cm, SE THICKNESS TYPE CONTRAST PAINT 3/4" 4.90mm Mograflux WCP-2 Magnaflux SCHEDULE PREPARATION SURFACE COND’N. MAGNETIC INK Sch. CL3000 Fillet Weld As welded 7HE Magnaflux LINE IDENTIFICATION ‘AREA 3-C-40015-A1 GC-2 DRAWING No. ‘ACCEPTANCE STD. WELD CLASS 2385-NM-1350-102 ANS! B31.3 10% SPOOL / ITEM Ne. ‘OPERATOR DATE - WA IV,REAE 22 JULY 2020 WELD wipe | WELD IDENT 1A. | scH. laa TYPE INTERPRETATION RESULT swas | 3/4” [c13000 | Fo1__| 100% PIPE NSD A — 5; = > L *NOTHING FOLLOWS* | | =| COMM =1iT / SKETCH: com) A TAKNIA | ‘AGOCO ‘AGOCO -Sarir NAM Eduard6) ‘Abdul Hamed §, DESIGNATION | ECD Dept. oordinator _ | SIGNATURE cs yy — JULY 2020 JULY 2020 LEGEND: NSH NO SIGNIFICANT DEFECT PG-POROSITY LF LACK OF FUSION ‘A ACCEPTED N1/SD-NO REIECTABLE SIGNIFICANT DEFECT CK — CRACK SUC- UNDERCUT H-REPAIR

You might also like