Professional Documents
Culture Documents
5 6062399059027558904
5 6062399059027558904
Renovation
ITEM Quantit
NO.
Description Unit Rate (LE) Subtotal (LE)
y
Carrefour Express - Mokattam - Renovation
1 DEMOLITION WORK :
General Conditions :
To Summary LE 0
Carrefour Express- Mokattam
Renovation
To Summary LE 0
Carrefour Express- Mokattam
Renovation
To Summary LE 0
Carrefour Express- Mokattam
Renovation
6.1 Doors
Repair Automatic sliding Glass Door for Entrance Type ( D
A 1 no -
1 ).
Repair Automatic sliding Glass Door for Entrance Type ( D
B 1 no -
2 ).
Supply and apply Steel Flush Door Fire rated 2 hours Type
C 1 no -
( D 3 ).
6.2 Windows no
Repair double glazzed Aluminium windows , wherever
A 1 LS -
necessary.
6.3 Access
A Supply and apply Access panels to roof 60x60 cm 4 No -
-
6.4 Anti Blast Safety Film
Supply and apply Anti Blast Safety Film for all Glazed
A 1 LS -
Doors and Windows to Façade Side.
To Summary LE 0
Carrefour Express- Mokattam
Renovation
To Summary LE 0
Carrefour Express- Mokattam
Renovation
* The rates for Finishes shall include but not limited to the provision and installation of
materials, labours, metal stop or angle beads, lathing at joints of different backgrounds,
movement or joint sealants,all Types of Fixtures ,accesories ,trim and Special Shapes,
together with the provision of any samples or sample panels
To Collection LE 0
Carrefour Express- Mokattam
Renovation
To Collection LE 0
Carrefour Express- Mokattam
Renovation
8 FINISHES:
COLLECTION
Page 6 -
Page 7 -
To Summary LE 0
Carrefour Express- Mokattam
Renovation
SUMMARY
1 DEMOLITION WORK : -
3 MASONRY : -
4 METALWORK : -
7 SPECIALTIES : -
8 FINISHES : -
ALL CONTRACTORS MUST VISIT THE SITE AND STUDY EACH ITEM
BEFORE PUTTING HIS OWN PRICE IN THE B.O.Q
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
LE LE
A DUCTED SPLIT UNITS :
Connection, Testing and Commission of ducted split units complete
with compressors, evaporator, condensers, fans, motors, filters,
control panel and all accessories as shown on drawings and
specifications.
1 - D-60 ( NOMINAL COOLING CAPACITY 60, 000 BTU/ HR ). NO 35
B WALL MOUNTED SPLIT UNITS :
Connection, Testing and Commission of wall mounted split units
complete with compressors, evaporator, condensers, fans, motors,
filters, control panel and all accessories as shown on drawings and
specifications.
1 - S-15 ( NOMINAL COOLING CAPACITY 15, 000 BTU/ HR ) NO 3
2 - S-24 ( NOMINAL COOLING CAPACITY 24, 000 BTU/ HR ) NO 3
3 - S-36 ( NOMINAL COOLING CAPACITY 36, 000 BTU/ HR ) NO 1
C FANS :
connection, testing, commissioning and balancing of fans with all
accessories , components , devices as per schedules and
specifications complete with - but not limited to cleanable filter (for
supply fans), gravity shutters, earthing, base and frame, rubber pads,
sealers for leakage, vibration isolation , tags, labels, flow indicators
and color code finishing, duct connection and flexible duct on outlet
and inlet as per schedule drawings and specifications.
01 Inline Type
A EXF-1 ( 200 CFM, 0.25 IN W.G ) NO 1
B EXF-2 ( 250 CFM, 0.25 IN W.G ) NO 1
C EXF-3 ( 3600 CFM, 1.0 IN W.G ) NO 1
D EXF-4 ( 3000 CFM, 2.0 IN W.G ) NO 1
E EXF-6 ( 1500 CFM, 0.75 IN W.G ) NO 1
F EXF-10 ( 100 CFM, 0.375 IN W.G ) NO 1
G SF-1 ( 3200 CFM, 1.0 IN W.G ) NO 2
H SF-2 ( 3400 CFM, 0.5 IN W.G ) NO 4
02 Propeller Type
EXF-P1 ( 300 CFM, 0.1 IN W.G ) NO 8
03 RooftopType
A EXF-5 ( 2000 CFM, 0.75 IN W.G ) NO 4
B EXF-7 ( 650 CFM, 0.5 IN W.G ) NO 23
C EXF-8 ( 600 CFM, 1.0 IN W.G ) NO 1
D EXF-9 ( 100 CFM, 0.25 IN W.G ) NO 1
To Summary LE
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
LE LE
04 AIR CURTAINS
A AC-R-1 ( 2000 MM WIDTH) No 1
B AC-R-2 ( 1600 MM WIDTH)
D DUCTWORK :
To Summary LE
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
LE LE
E AIR DISTRIBUTION :
Connection, Balancing and Commission of Grille and square ceiling
diffuser from painted aluminum section complete with all accessories
as shown on drawings and specifications.
A Supply air diffusers
- Size 16" x 16" NO 72
B Exhaust air grilles
1 - Size 9" x 9" NO 6
2 - Size 12" x 12" NO 5
3 - Size 16"x 16" NO 14
4 - Size 18" x 18" NO 1
5 - Size 32" x 32" NO 4
C Supply air grilles
1 - Size 28"x 6" NO 12
2 - Size 16"x 16" NO 2
3 - Size 20"x 20" NO 5
Air louvers sum 1
F PIPE AND FITTINGS
Connection, Testing and Commission of refrigerant copper pipes
1 system including insulation, fittings, charging, support anchor and all Sum 1
other accessories.
Connection, Testing and Commission of PVC draining system for
2 Sum
H.V.A.C. equipment.
G THERMAL INSULATION
Connection, Testing and Commission of sheet metal ductwork thermal
01 insulation complete with tags, labels, and all accessories as shown on sum 1
drawings and specifications.
H PVC drain piping
connection of U.P.V.C drain piping network complete with support ,
01 sum 1
hangers to the nearest drain point
M Civil Works
Provision and workmanship for civil work associated with mechanical
01 work include concrete bases, openings, back filling, normalizing, sum 1
cleaning and painting .
N Electrical Installation
Supply and installation of electrical cables, wires , conduits associated
01 sum 1
with HVAC work similar as per electrical specifications .
Any item mentioned in the drawing and / or the specification and not
2 mentioned here in the Bill of Quantities for the safe and proper sum 1
operation of the system
To Summary LE
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
LE LE
O TESTING AND BALANCING
To Summary LE
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
LE LE
SUMMARY
Page 1
Page 2
Page 3
Page 4
ALL CONTRACTORS MUST VISIT THE SITE AND STUDY EACH ITEM
BEFORE PUTTING HIS OWN PRICE IN THE B.O.Q
domestic electric water heater complete with supports, connections to hot and
cold water systems, electrical connections, testing and all necessary fittings
and fixing accessories, complete as specified and as shown on the drawings
To Summary LE
SUMMARY
Page 1
Page 2
Page 3
Page 4
ALL CONTRACTORS MUST VISIT THE SITE AND STUDY EACH ITEM
BEFORE PUTTING HIS OWN PRICE IN THE B.O.Q
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
LE LE
A DIVISION (16-1) LIGHT FIXTURES:-
Test, repair and replace if necessary according to engineer
satisfaction the final branch power and lighting circuits use ,
connect and test light fixtures including all lamps including all
mounting devices and brackets as shown on the drawings,
specification and as scheduled. Items (A-1 to A-8) & (A-10 to A-
19) light fixtures will be supplied &installed by Contractor ,
(A-9) installed only by Contractor
To Summary LE 0
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
LE LE
B DIVISION (16-2) LIGHT SWITCHES:- Supply install,
connect and test light switches complete including, conduits,
conduit fittings, switches, terminations, earthing, wiring from
switches to branch circuit according to specifications and as
shown on drawings. Switches should be products of :-GEWISS (
PLAYBUS RANGE ) BTICHINO ,LEGRAND
B-1 One gang,One Way 10A modular Switch No. 6 0
B-2 Two gang,One Way 10A modular Switch No. 8 0
To Summary LE 0
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
LE LE
C DIVISION (16-3) SOCKET OUTLETS:-
Test, repair and replace if necessary according to engineer
satisfaction,the main circuits shall reach the distrubtion
panels without welded connections otherwise new cables
shall be installed (no joints accepted), reconnect and test
socket outlets complete including conduits, conduit fittings,
wiring, earthing back to panel board or to branch circuit
complete including plaster rings, wiring, earthing, terminations,
socket plate, cover, plugs all necessary accessories and
ancillary work according to specification and schedules. with
Sockets should be products of :- LEGRAND-GEWISS -
BTICHINO -
To Summary LE 0
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
LE LE
D DIVISION (16-4) SWITCH FUSE POWER with OUTLET:-
'Test, repair and replace if necessary according to engineer
satisfaction and reconnect and test switch fuses complete
including conduits, conduit fittings, wiring, earthing back to panel
board or to branch circuit complete including plaster rings,
wiring, earthing, terminations, socket plate, cover, plugs all
necessary accessories and ancillary work according to
specification and schedules. Sockets should be products of :-
BTICHINO Or approved equal.
D-1 16A switch fuse( IP 54 ) with two pole. For water heater and No.
0
dreyer 3
D-2 25A switch fuse( IP 54 ) with two pole. For air condition and No.
0
others 2
D-3 25A three phase switch fuse( IP 54 ) with four pole. No. 2 0
D-4 100A three phase switch fuse( IP 54 ) with four pole. No. 0 0
D-6 150A three phase switch fuse( IP 54 ) with four pole. No. 0 0
To Summary LE 0
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
LE LE
E DIVISION (16-5)BRANCH CIRCUITS:-
Test, repair and replace if necessary according to engineer
satisfaction,the main circuits shall reach the distrubtion
panels without welded connections otherwise new cables
shall be installed (no joints accepted),, connect and test PVC
insulated 450/750V stranded copper conductor wires &
PVC/PVC stranded copper conductor cables from branch circuit
panelboards to light & power outlets including raceways,
termination, glands and all necessary accessories and ancillary
works required for complete operative system. Embeded or lm
concealed surface mounted conduits should be heavy gauge
PVC. Exposed mounted conduits should be rigid galvanized
steel. Circuits in cable tray should be PVC/PVC multicore
cables. - PVC conduits should be products of Beit El-Handasa
(light network) According to stander below
E-18 3x3mm² CU PVC/PVC branch circuit for feeding (8) light fixtures
lm 1 0
E-19 3x3mm² CU PVC/PVC branch circuit for feeding (8) light fixtures
lm 1 0
To Collection LE 0
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
LE LE
E DIVISION (16-5)BRANCH CIRCUITS:- cont'd
E-21 3x4 mm² copper conductor PVC/PVC branch circuit, for feeding
lm 1 0
(1 to 3) No. power outlet, submersible pump or AHT refirgerators
E-22 3x3 mm² copper conductor PVC/PVC branch circuit, for feeding
lm 1 0
(4 to 5) No. power outlet
E-23 3x3 mm² copper conductor CU/PVC branch circuit, for feeding
lm 1 0
(6) No. power outlet ups of others or hand dryer water heater
E-24 5x6 mm² copper conductor PVC/PVC branch circuit, for feeding
(1) No. power outlet AC unit to feed - [AHU-1] - [Axial SMK-1] lm 1 0
To Collection LE 0
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
LE LE
E DIVISION (16-5)BRANCH CIRCUITS:-
COLLECTION
Page 5 -
Page 6 -
To Summary LE 0
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
LE LE
F DIVISION (16-6)'Branch Circuit Distribution Panel Boards:-
Supply, install, connect and test the following panel boards
complete with circuit breakers, bus bars cabinets, conductors
relays, residual current devices, indicator lamps and all
necessary accessories and ancillary works required in
accordance with the specification, tender drawings & attached
schedules.'Panel boards should be products of :- Emg
( Schnieder ) - GILA OR EQUIVLANT (TYPE TEST)
To Summary LE 0
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
LE LE
G DIVISION (16-7)MAIN DISTRIBUTION:- 'Supply install,
connect and test(GDB) main distribution panel boards with all
necessary accessories circuit breakers, contractors, relays,
indicator lamps, kilo watt hour meter, cable terminals & all
ancillary works required for complete operative system
according to the specifications & as shown on drawings.
G-1 GDB (INCLUDING Digital KWH METER) No. 1 0
To Summary LE 0
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
LE LE
H DIVISION (16-8)UPS:-
H-1 Supply install, connect and test uninterruptible 20 KVA power
supply(ups) 15 minutes complete including
rectifier,control,charger,wave form,earthing and all necessary
accessories & all ancillary works required for complete operative 0
system according to the specifications & as shown on drawings.
No. 1
To Summary LE 0
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
LE LE
I DIVISION (16-9)CABLE FEEDERS:-
supply and install, connect and test PVC insulated , PVC
sheathed 600/1000V stranded copper cables or AL. cables for
generator & plant room ,cables should be from main feeder
distribution panelboard to branch circuit panels & starter panels
including raceways, termination, glands ,manholes The item
shall include all necessary reinforced concrete cross roads
sleeves, warning tape & covering bricks . The works include
excavation, backfilling & excess soil removal outsie the site and
all necessary accessories and ancillary works required for
complete operative system. 'power cables shall be products :-' -
Elsweedy Co. or approved equal
To Collection LE 0
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
LE LE
l DIVISION (16-9)CABLE FEEDERS:- cont'd
I-8 Supply CU PVC /PVC cable [(3x185+95)mm2 +50mm2)] and all
necessary accessories and ancillary works required as specified
and as shown on drawings. (To FEED MDB FROM 0
ELECTRICAL ROOM)
m 120
I-9 Supply CU PVC /PVC cable [(3x240+120)mm2 +120mm2)] and
all necessary accessories and ancillary works required as 0
specified and as shown on drawings. m 200
I-10 Supply CU PVC /PVC cable [(3x150+70)mm2 +35mm2)] and all
necessary accessories and ancillary works required as specified 0
and as shown on drawings.
m 100
I-11 Supply CU PVC /PVC cable [(3x120+70)mm2 +35mm2)] and all
necessary accessories and ancillary works required as specified 0
and as shown on drawings.
m 5
I-12 Supply CU PVC /PVC cable [(3x70+35)mm2 +16mm2)] and all
necessary accessories and ancillary works required as specified 0
and as shown on drawings.
m 5
I-13 Supply CU PVC /PVC cable [(3x25+16)mm2 +10mm2)] and all
necessary accessories and ancillary works required as specified 0
and as shown on drawings.
m 5
To Collection LE 0
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
LE LE
DIVISION (16-9)CABLE FEEDERS:-
COLLECTION
Page 9 -
Page 10 -
To Summary LE 0
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
LE LE
J DIVISION (16-10)EMERGENCY DIESEL GENERATOR SET:-
To Summary LE 0
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
LE LE
K DIVISION (16-11)AUTOMATIC TRANSFER SWITCH :-
K-1 Supply install, connect and test the automatic transfer switch
400A complete with all control, monitoring and protection
equipment including control cabling and all necessary auxiliary
components and ancillary works required for complete operation 0
as specified and as indicated on the drawings 'ATS shall be
products :- CUMMINS co. Or approved equal
No. 1
To Summary LE 0
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
LE LE
L DIVISION (16-12)'EARTHING (GROUNDING) SYSTEM:-
testing Furnishing, and added a new rodes if necessary connect
and test a complete protective earthing (PE) system complete
with earthing pits, earthing electrodes, equalizer bars, earth
continuity conductor, and earthing conductor to switchboards,
diesel generator set and transformers complete with all
accessories, fixing brackets, tets links, complete with all
accessories, fixing brackets, tets links suspensions, drilling and
cutting for complete installation all in accordance with technical
specifications and drawings NB Earthing impedance must be <=
2 ohm 'Grounding system components
shall be products :- Furse Co. or approved equal
LS. 1 0.00
To Summary LE 0
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
LE LE
M DIVISION (16-13)''LIGHT CURRENT SYSTEM EARTHING
(GROUNDING) SYSTEM:-
M-1 testing , Furnishing,and added a new rodes if necessary a
complete protective earthing (PE) system complete with earthing
pits, earthing electrodes, equalizer bars, earth continuity
conductor, and earthing conductor to switchboards, diesel
generator set and transformers complete with all accessories,
fixing brackets, tets links, complete with all accessories, fixing
brackets, tets links suspensions, drilling and cutting for complete
installation all in accordance with technical specifications and
drawings NB Earthing impedance must be <= 0.5 ohm
Grounding system components shall be products :- OTAK OR
FURSE Co. or approved equal
LS. 1 0.00
To Summary LE 0
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
LE LE
N DIVISION (16-14) 'TELEPHONE SYSTEM:-
'Supply install, connect and test Telephone System complete
including conduits, conduit fittings,CAT 3 cable, earthing
complete including plaster rings, wiring, earthing, terminations,
socket plate, cover,cable tray , plugs all necessary accessories
and ancillary work according to specification and Design
'Telecommunication system cabling & outlets shall be products
of :- Avaya Co. or approved equal
N-1 Supply install, connect and test socket wall telephone outlets
complete including conduits, conduit fittings,CAT 6 cable,
earthling complete including plaster rings, wiring, earthling,
terminations, socket plate, cover, plugs all necessary 0.00
accessories and ancillary work according to specification and
Design. Sockets should be products of :-
'legrand - avaya
No. 8
N-2 Supply install, connect and test socket RG-11 floor telephone
outlets complete including conduits, conduit fittings,CAT 6 cable,
earthling complete including plaster rings, wiring, earthling, 0.00
terminations, socket plate, cover, plugs all necessary No. 18
accessories and ancillary work according to specification and
N-3 Supply
Design.install, connect and test 25 pair telephone
Sockets cable
should be
complete as specified
products of :- and indicated in the drawings
'legrand with all
- avaya
necessary termination, conduits, raceways, patch cordsand all 0.00
necessary accessories required to complete operative system M 28
N-4 Supply install, connect and test 25 pair telephone frame
complete as specified and indicated in the drawings with all
necessary termination, conduits, raceways, patch cords, cables 0.00
and all necessary accessories required to complete operative
system No. 1
N-5 Supply install, connect and test 10\25 pair telephone PABX LS. 1 0.00
included the telephone sets complete as specified and indicated
in the drawings with all necessary termination, conduits,
raceways, patch cords, cables and all necessary accessories To Summary LE 0
required to complete operative system
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
LE LE
O DIVISION (16-15) 'DATA SYSTEM:-
'Supply install, connect and test DATA System complete
including conduits, conduit fittings, earthing complete including
plaster rings, wiring, earthing, terminations ,cable tray , plugs all
necessary accessories and ancillary work according to
specification and Design
O-1 Supply install, connect and test conduits, conduit fittings ,cable
tray for wall mounted to carry CAT 6 cable wall, earthling
complete including plaster rings, wiring, earthling, terminations&
surface ceilling mounted for fish lab scale & all necessary 0.00
accessories and ancillary work according to specification and
Design. ( DATA SCALE,OR DATA CASHER,DATA DISK)
conduit only
No. 15
O-2 Supply install, connect and test conduits, conduit fittings ,cable
tray ,cable trunk to carry CAT 6 cable floor DATA outlets
complete including conduits, conduit fittingsearthling, 0.00
terminations all necessary accessories and ancillary work
according to specification and Design. conduit only No. 15
O-3 install only , connect and test of wall mounted IT RACK with
(2*24) Port patch panel complete as specified and indicated in
the drawings with all necessary termination, conduits, raceways, 0.00
patch cords, cables and all necessary accessories required to
complete operative system No. 1
O-4 install only , connect and test of wall mounted IT RACK with No. 1 0.00
(1*24) Port patch panel complete as specified and indicated in
the drawings with all necessary termination, conduits, raceways,
patch cords, cables and all necessary accessories required to To Summary LE 0
complete operative system
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
LE LE
P DIVISION (16-16) 'CCTV SYSTEM:- (IP camera)
Supply, install, connect and test CCTV system complete
including conduits, conduit fittings , cabling, complete with all
necessary accessories and ancillary works as shown on
drawings and as specified in the technical specification in order
to provide a complete system The item shall be complete with
PC computer with LED 24 inch monitor & software to identify the
system on the PC.'CCTV system NVR shall be products of
BELCON or approved equal IP camera
LS. 1
To Summary LE 0
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
LE LE
Q DIVISION (16-17)ADDRESSABLE FIRE ALARM SYSTEM:-
Test, repair and replace if necessary according to
engineer satisfaction , reconnect and test fire alarm control
system complete including conduits, conduit fittings , cabling,
complete with all necessary accessories and ancillary works as
shown on drawings and as specified in the technical
specification in order to provide a complete system up to the
main fire alarm control panel (MFACP) WITH PRINTER 'Fire
alarm system shall be products of Cerbrus,gent
Simplex Honeywell or approved equal
Q-1 Supply install, connect and test UL LISTED main fire alarm
control panel 1 no loops complete including,PRINTER,
conduits, conduit fittings, boxes, wiring up to fire alarm 0.00
detectors, fixing and all necessary accessories and ancillary
works as specified and as shown on the drawings. No. 1
Q-2 Supply install, connect and test addressible fire alarm MLTI-
No. 70 0.00
SNSOR detector
Q-3 Supply install, connect and test addressible fire alarm heat
No. 5 0.00
detector
Q-4 Supply install, connect and test addressible fire alarm siren No. 4 0.00
Q-5 Supply install, connect and test addressible break glass manual
No. 4 0.00
station
Q-6 Supply install, connect and test addressible control modules LS. 1 0.00
Q-7 Supply install, connect and test addressible monitor modules LS. 1 0.00
Q-8 Supply install, connect and test fire alarm circuits serving the
shown detectors complete with duct banks, raceways &
raceways supports. The works may include excavation in 0.00
different soils & backfilling complete with inspection manholes
(2*1.5mm2). LS. 1
Q-9 Supply install, connect and test fire alarm resistant cables to
connect carrefour fire alarm control panel to main fire alarm
control panel of the mall and all necessary accessories and 0.00
ancillary works required as specified and as shown on
drawings(2*1.5mm2).. LS. 1
To Summary LE 0
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
LE LE
R DIVISION (16-18) ACCESS CONTROL SYSTEM :-
R-1 'Supply install, connect and test access control system
complete including head end equipments. The item shall include
conduits, conduit fittings , [cat 6] cabling, complete with all
0.00
necessary accessories and ancillary works as shown on
drawings and as specified in the technical specification in order
to provide a complete system. LS. 1
R-2 Supply install, connect and test one door access control
interface module connect to main panel & all ancillary works
required for complete operative system according to the 0.00
specifications & as shown on drawings. No. 6
R-3 Supply install, connect and test request to exit push buttons & all
ancillary works required for complete operative system 0.00
according to the specifications & as shown on drawings. No. 6
R-4 Supply install, connect and test electro magnetic lock & all
ancillary works required for complete operative system 0.00
according to the specifications & as shown on drawings. No. 4
R-5 Supply install, connect and test emergency exit break
glass&sounders& all ancillary works required for complete
operative system according to the specifications & as shown on 0.00
drawings. No. 2
R-6 Supply install, connect and test proximity card reader with pin
code& all ancillary works required for complete operative system
according to the specifications & as shown on drawings. 0.00
No. 6
R-7 Supply install, connect and test proximity card & all ancillary No. 25 0.00
works required for complete operative system according to the
specifications & as shown on drawings. (Two deferent types with
sensitive warehouse ) To Summary LE 0
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
LE LE
S DIVISION (16-19) INTRUSION SYSTEM
S-1 'Supply install, connect and test secuirity system The item
shall include conduits, conduit fittings , [cat 6] cabling, complete
with all necessary accessories and ancillary works as shown on 0.00
drawings and as specified in the technical specification in order
to provide a complete system. LS. 1
S-2 Supply install, connect and test main security alarm & access
control panel complete with power supply , backup battery , auto
dailler & all ancillary works required for complete operative 0.00
system according to the specifications & as shown on drawings.
No. 1
S-3 Supply install, connect and test 8 zone expantion module& all
ancillary works required for complete operative system 0.00
according to the specifications & as shown on drawings. No. 1
S-4 Supply install, connect and test intgrated software No. 1 0.00
S-5 Supply install, connect and test keypad controller& all ancillary
works required for complete operative system according to the 0.00
specifications & as shown on drawings. No. 1
S-6 Supply install, connect and test communication module& all
ancillary works required for complete operative system 0.00
according to the specifications & as shown on drawings. No. 1
S-7 Supply install, connect and test alarm indoor strobe siren(ADI)&
all ancillary works required for complete operative system
according to the specifications & as shown on drawings. 0.00
No. 4
S-8 Supply install, connect and test panic button(Enforcer)& all
ancillary works required for complete operative system 0.00
according to the specifications & as shown on drawings. No. 5
S-9 Supply install, connect and test INFER RED MOTION
DECTECTOR & all ancillary works required for complete
operative system according to the specifications & as shown on 0.00
drawings. No. 4
S-10 Supply install, connect and test magnetic door contact & all
ancillary works required for complete operative system 0.00
according to the specifications & as shown on drawings. No. 4
S-11 Supply install, connect and test vibration sensor & all ancillary
works required for complete operative system according to the 0.00
specifications & as shown on drawings. No. 5
S-12 Supply install, connect and test PC computer with LCD 32 inch No. 1 0.00
monitor IBM compatible, Graphic presentation software & all
ancillary works required for complete operative system
according to the specifications & as shown on drawings. To Summary LE 0
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
LE LE
T DIVISION (16-20)SOUND SYSTEM:-
T-1 Supply install, connect and test sound system rack
including:'AM/FMTuner, MP,'Cassete Player,'CD Player,2
Zones Amplifiers (2 amp 400w), ONE WIRELESS PAGING
MICROPHONE The rack shall be euipped with a preset 0.00
evacuation message that shall be announced upon receival of a
signal from the fire alarm panel WITH ALl NEED TO COMPLET
SYSTEM.
No. 1
T-2 Test, repair and replace if necessary according to engineer
satisfaction and reinstall, connect and test sound system outlet
with wiring 2*2mm2 "stranded twisted pair PVC insulated copper
CHILDED " including race ways , termination boxes and all
necessary accessories required for complete operative system
of general sound system and as shown on design drawing '
0.00
surface mounted conduits should be galvanized steel.'Wiring
should be product of : - ALSWEEDY Co. 'Or
approved equal.' - H.G.P.V.C. conduits should be products of
marshal TUFLEX. Co.'Or approved equal
LS. 1
T-3 Supply install, connect and test recessed ceilling mounted
No. 1 0.00
4/8/16W sound speakers SPHERICAL TYPE .
T-4 Supply install, connect and test surface ceilling mounted
No. 33 0.00
6/3/1.5W sound speakers.
T-5 Supply install, connect and test volume control No. 2 0.00
To Summary LE 0
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
LE LE
U DIVISION (16-21)CABLE TRAY
U Test, repair and replace if necessary according to engineer satisfaction
The Contractor Will Furnish Supply & Install The Following Materials &
Equipments In Accordance With The Contract Specifications Local
Codes & Requirements & With Relative Electrical, HVAC, Mechanical
Architectural Drawing
U-1 Galvanized Steel Cable Trays (WxH) (10X5 cm)-thickness 1.5mm. m 50 0.00
U-2 Galvanized Steel Cable Trays (WxH) (20X5 cm)-thickness 2mm. Data m 10 0.00
U-3 Galvanized Steel Cable Trays (WxH) (40X5 cm)-thickness 2mm. m 10 0.00
To Summary LE 0
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
LE LE
Z DIVISION (16-22)TESTING:-
Z-1 TESTINIG, COMESSIIONING AND HAND OVER FOR ALL
ELECTRICAL SYSTEM INSTALLATION SIMLTINUSLY FOR 24
HOURS DURING 15 DAYS AFTER APPROVED END OF 0
INSTALLATION LS. 1
To Summary LE 0
RATE AMOUNT
ITEM DESCRIPTION UNIT QTY
LE LE
TENDER SUMMARY
TENDER SUMMARY 0